HOR: Pit Optimisation Update Highlights Copper Production Scale
Original announcement by asx on
- Company
- Horseshoe Metals Ltd
- Ticker
- HOR
- Exchange
- ASX
- Region
- Western Australia
- Primary commodity
- Copper
- Secondary commodities
- Gold, Silver
- Document categories
- Resource update, Other, Metallurgy
- Extracted
- 2026-11-04 23:09:01 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Horseshoe Metals has released an updated pit optimisation for its Horseshoe Lights Project, outlining a 71% increase in contained copper within a single open pit shell. The optimisation, based on a copper price of A$25,000/t, contains 12.34 million tonnes at 0.77% Cu for 95,033 tonnes of contained copper. This update supports the reasonable prospects for eventual economic extraction and provides a strong foundation for further studies.
Reasoning: The updated pit optimisation shows a 71% increase in contained copper compared to the previous study, using a higher copper price, which significantly enhances the project's potential for open pit mining.
Positive factors
- significant_tonnage_increase
- grade_maintained
- pit_optimisation_positive
- jorc_compliant
- qp_signed
Facts used in scoring: 39

Classification and evidence
Tonnage Growthpositive
Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.
Why it applies: The updated pit optimisation contains 12.34 Mt of ore, a significant increase compared to the previous 5.99 Mt.
Evidence · text
“Updated pit optimisation contains a total of 12,337,226t at 0.77 % Cu for 95,033t contained Cu”
Contained Metal Growthpositive
True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.
Why it applies: The new optimisation results in 95,033t contained Cu, which is 71% more than the previous 55,700t contained Cu.
Evidence · text
“The new optimisation results in 71% more copper contained in one pit shell”
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: The report states that Mr Michael Fotios, a member of the Australasian Institute of Mining and Metallurgy, is the Competent Person responsible for the information.
Evidence · text
“The information in this report that relates to the Exploration Results, Exploration Targets, Pit Optimisation and Mineral Resources at the Horseshoe Lights and Kumarina Projects is based on information reviewed by Mr Michael Fotios, who is a member of the Australasian Institute of Mining and Metallurgy.”
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: The Mineral Resource Estimates meet the reporting requirements of the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”.
Evidence · text
“The above Mineral Resource Estimates all meet the reporting requirements of the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”.”
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: The pit optimisation uses a lower cut-off grade of 0.1% Cu, and the MRE tables specify cut-off grades.
Evidence · text
“above a selected lower cut-off grade of 0.1% Cu”
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: The underlying MREs for Horseshoe Lights and Kumarina Projects have an effective date of 30 June 2026, but the QP statement indicates they are restatements of older estimates from 2013 and 2015.
Evidence · text
“SUMMARY OF MINERAL RESOURCES AS AT 30 June 2026”
Maiden Resourceneutral
First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.
Why it applies: The document refers to the 'existing MRE' and 'previous pit optimisation', indicating this is an update, not a maiden resource.
Evidence · text
“An updated open pit optimisation has been completed at copper price of $25,000/t for the existing Main Zone and Motters Mineral Resource Estimate”
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: The document presents an updated pit optimisation and refers to existing Mineral Resource Estimates.
Evidence · text
“An updated open pit optimisation has been completed at copper price of $25,000/t for the existing Main Zone and Motters Mineral Resource Estimate”
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: The pit optimisation is intended to provide a basis for further scoping and mining studies, which are early-stage economic assessments.
Evidence · text
“The purpose of the open pit optimisation is to demonstrate the reasonable prospects for eventual economic extraction (RPEEE) as defined in the 2012 JORC Code plus provide a basis for further scoping and mining studies.”
Heap Leach Routeneutral
Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.
Why it applies: the document describes a heap_leach route ("heap leach")
Mill Routeneutral
Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
Why it applies: the document describes a mill_cil route ("CIP")
Gravity Routeneutral
Gravity separation forms a material part of the flowsheet.
Why it applies: the document describes a gravity route ("gravity")
Extracted facts
Stored fact records: 39. Some facts used in scoring do not have a stored record.
Resource Estimates (37)
Fact 1Horseshoe Lights · copperTonnes: 12337226Grade: 0.77Grade Unit: %Contained Metal: 95033Contained Unit: tView all detailsHide details
Identity
- Project
- Horseshoe Lights
- Commodity
- copper
- Ticker
- HOR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Michael Fotios
- Resource group id
- resource:b69e6363a635a05eabd0
Resource Data
- Tonnes
- 12337226
- Grade
- 0.77
- Grade Unit
- %
- Contained Metal
- 95033
- Contained Unit
- t
- Cutoff Grade
- 0.1
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: The updated pit optimisation shows a 71% increase in contained copper compared to the previous study, using a higher copper price, which significantly enhances the project's potential for open pit mining.
Positive factors
- significant_tonnage_increase
- grade_maintained
- pit_optimisation_positive
- jorc_compliant
- qp_signed
Evidence · text
“Updated pit optimisation contains a total of 12,337,226t at 0.77 % Cu for 95,033t contained Cu from a single open pit”
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Fact 2Horseshoe Lights · goldTonnes: 12337226Grade: 0.09Grade Unit: g/tContained Metal: 35198Contained Unit: ozView all detailsHide details
Identity
- Project
- Horseshoe Lights
- Commodity
- gold
- Ticker
- HOR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Michael Fotios
- Resource group id
- resource:b69e6363a635a05eabd0
Resource Data
- Tonnes
- 12337226
- Grade
- 0.09
- Grade Unit
- g/t
- Contained Metal
- 35198
- Contained Unit
- oz
- Cutoff Grade
- 0.1
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: Gold is present as a byproduct in the pit-optimised resource, but no value has been attributed to it in the current study, indicating it's not the primary focus.
Positive factors
- pit_optimisation_positive
Negative factors
- no_value_attributed
Evidence · table
“0.09”
Context: 12,337,226
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Fact 3Horseshoe Lights · silverTonnes: 12337226Grade: 1.7Grade Unit: g/tContained Metal: 675869Contained Unit: ozView all detailsHide details
Identity
- Project
- Horseshoe Lights
- Commodity
- silver
- Ticker
- HOR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Michael Fotios
- Resource group id
- resource:b69e6363a635a05eabd0
Resource Data
- Tonnes
- 12337226
- Grade
- 1.7
- Grade Unit
- g/t
- Contained Metal
- 675869
- Contained Unit
- oz
- Cutoff Grade
- 0.1
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: Silver is present as a byproduct in the pit-optimised resource, but no value has been attributed to it in the current study, indicating it's not the primary focus.
Positive factors
- pit_optimisation_positive
Negative factors
- no_value_attributed
Evidence · table
“1.70”
Context: 12,337,226
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Fact 4Horseshoe Lights · copperTonnes: 5990000Grade: 0.93Grade Unit: %Contained Metal: 55700Contained Unit: tHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Horseshoe Lights
- Commodity
- copper
- Ticker
- HOR
Resource scope
- Estimate type
- resource
- Resource group id
- resource:1698830ba93ad105431c
Resource Data
- Tonnes
- 5990000
- Grade
- 0.93
- Grade Unit
- %
- Contained Metal
- 55700
- Contained Unit
- t
Prior Estimate
- Resource Date
- 2014-12-01
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2014-12-19T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is a historical pit optimisation result used for comparison, not a new finding.
Negative factors
- stale_data
Evidence · text
“Previous pit optimisation and scoping study completed in December 2014 assumed $9,925/t and resulted in mining of 5.99 Mt at 0.93% Cu for 55,700t t contained Cu”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 11.9 years before this release
Fact 5Horseshoe Lights · copperContained Metal: 47375Contained Unit: tHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Horseshoe Lights
- Commodity
- copper
- Ticker
- HOR
Resource scope
- Estimate type
- resource
- Resource group id
- resource:afe9803cf367e5bad3f0
Resource Data
- Contained Metal
- 47375
- Contained Unit
- t
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2014-12-19T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is a historical recovered copper figure from a previous study, used for comparison.
Negative factors
- stale_data
Evidence · text
“47,375t, 12,730 oz and 271,100 oz recovered Cu, Au and Ag respectively”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 11.9 years before this release
Fact 6Horseshoe Lights · goldContained Metal: 12730Contained Unit: ozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Horseshoe Lights
- Commodity
- gold
- Ticker
- HOR
Resource scope
- Estimate type
- resource
- Resource group id
- resource:afe9803cf367e5bad3f0
Resource Data
- Contained Metal
- 12730
- Contained Unit
- oz
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2014-12-19T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is a historical recovered gold figure from a previous study, used for comparison.
Negative factors
- stale_data
Evidence · text
“47,375t, 12,730 oz and 271,100 oz recovered Cu, Au and Ag respectively”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 11.9 years before this release
Fact 7Horseshoe Lights · silverContained Metal: 271100Contained Unit: ozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Horseshoe Lights
- Commodity
- silver
- Ticker
- HOR
Resource scope
- Estimate type
- resource
- Resource group id
- resource:afe9803cf367e5bad3f0
Resource Data
- Contained Metal
- 271100
- Contained Unit
- oz
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2014-12-19T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is a historical recovered silver figure from a previous study, used for comparison.
Negative factors
- stale_data
Evidence · text
“47,375t, 12,730 oz and 271,100 oz recovered Cu, Au and Ag respectively”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 11.9 years before this release
Fact 8Horseshoe Lights Project · copperTonnes: 12850000Grade: 1Grade Unit: %Contained Metal: 128600Contained Unit: tHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Horseshoe Lights Project
- Commodity
- copper
- Ticker
- HOR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Michael Fotios
- Resource group id
- resource:e929ab5702e59da30765
Resource Data
- Tonnes
- 12850000
- Grade
- 1
- Grade Unit
- %
- Contained Metal
- 128600
- Contained Unit
- t
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2013-06-05T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is the existing MRE, not a new update, but provides context for the pit optimisation. It is a restatement of a historical estimate.
Positive factors
- jorc_compliant
- qp_signed
Negative factors
- stale_estimate
Evidence · text
“Existing MRE for Horseshoe Lights deposit is 12.85 million tonnes at 1.00% Cu, 0.1g/t Au and 1.9 g/t Ag for 128,600 tonnes Cu”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Fact 9Horseshoe Lights Project · goldTonnes: 12850000Grade: 0.1Grade Unit: g/tContained Metal: 36000Contained Unit: ozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Horseshoe Lights Project
- Commodity
- gold
- Ticker
- HOR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Michael Fotios
- Resource group id
- resource:e929ab5702e59da30765
Resource Data
- Tonnes
- 12850000
- Grade
- 0.1
- Grade Unit
- g/t
- Contained Metal
- 36000
- Contained Unit
- oz
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2013-06-05T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is the existing MRE, not a new update, but provides context for the pit optimisation. It is a restatement of a historical estimate.
Positive factors
- jorc_compliant
- qp_signed
Negative factors
- stale_estimate
Evidence · text
“Existing MRE for Horseshoe Lights deposit is 12.85 million tonnes at 1.00% Cu, 0.1g/t Au and 1.9 g/t Ag for 128,600 tonnes Cu, 36,000 oz Au”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Fact 10Horseshoe Lights Project · silverTonnes: 12850000Grade: 1.9Grade Unit: g/tContained Metal: 793000Contained Unit: ozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Horseshoe Lights Project
- Commodity
- silver
- Ticker
- HOR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Michael Fotios
- Resource group id
- resource:e929ab5702e59da30765
Resource Data
- Tonnes
- 12850000
- Grade
- 1.9
- Grade Unit
- g/t
- Contained Metal
- 793000
- Contained Unit
- oz
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2013-06-05T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is the existing MRE, not a new update, but provides context for the pit optimisation. It is a restatement of a historical estimate.
Positive factors
- jorc_compliant
- qp_signed
Negative factors
- stale_estimate
Evidence · text
“Existing MRE for Horseshoe Lights deposit is 12.85 million tonnes at 1.00% Cu, 0.1g/t Au and 1.9 g/t Ag for 128,600 tonnes Cu, 36,000 oz Au and 793,000 oz Ag”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
measuredHorseshoe Lights Project · copperTonnes: 1730000Grade: 1.04Grade Unit: %Contained Metal: 18000Contained Unit: tHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Horseshoe Lights Project
- Commodity
- copper
- Ticker
- HOR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Michael Fotios
- Resource group id
- resource:3128f03e70e9722e2d59
- Deposit or zone
- In-situ Deposit
Resource Data
- Category
- measured
- Tonnes
- 1730000
- Grade
- 1.04
- Grade Unit
- %
- Contained Metal
- 18000
- Contained Unit
- t
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2013-06-05T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is a restatement of an existing Measured resource for copper, providing context for the pit optimisation.
Positive factors
- jorc_compliant
- qp_signed
Negative factors
- stale_estimate
Evidence · table
“1.04”
Context: 1.73
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
measuredHorseshoe Lights Project · goldTonnes: 1730000Grade: 0Grade Unit: g/tContained Metal: 1900Contained Unit: ozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Horseshoe Lights Project
- Commodity
- gold
- Ticker
- HOR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Michael Fotios
- Resource group id
- resource:3128f03e70e9722e2d59
- Deposit or zone
- In-situ Deposit
Resource Data
- Category
- measured
- Tonnes
- 1730000
- Grade
- 0
- Grade Unit
- g/t
- Contained Metal
- 1900
- Contained Unit
- oz
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2013-06-05T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is a restatement of an existing Measured resource for gold, providing context for the pit optimisation.
Positive factors
- jorc_compliant
- qp_signed
Negative factors
- stale_estimate
Evidence · table
“0.0”
Context: 1.73
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
measuredHorseshoe Lights Project · silverTonnes: 1730000Grade: 0.5Grade Unit: g/tContained Metal: 28.8Contained Unit: k ozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Horseshoe Lights Project
- Commodity
- silver
- Ticker
- HOR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Michael Fotios
- Resource group id
- resource:3128f03e70e9722e2d59
- Deposit or zone
- In-situ Deposit
Resource Data
- Category
- measured
- Tonnes
- 1730000
- Grade
- 0.5
- Grade Unit
- g/t
- Contained Metal
- 28.8
- Contained Unit
- k oz
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2013-06-05T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is a restatement of an existing Measured resource for silver, providing context for the pit optimisation.
Positive factors
- jorc_compliant
- qp_signed
Negative factors
- stale_estimate
Evidence · table
“0.5”
Context: 1.73
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedHorseshoe Lights Project · copperTonnes: 2430000Grade: 0.95Grade Unit: %Contained Metal: 23200Contained Unit: tHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Horseshoe Lights Project
- Commodity
- copper
- Ticker
- HOR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Michael Fotios
- Resource group id
- resource:e3561a503a7582f9f313
- Deposit or zone
- In-situ Deposit
Resource Data
- Category
- indicated
- Tonnes
- 2430000
- Grade
- 0.95
- Grade Unit
- %
- Contained Metal
- 23200
- Contained Unit
- t
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2013-06-05T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is a restatement of an existing Indicated resource for copper, providing context for the pit optimisation.
Positive factors
- jorc_compliant
- qp_signed
Negative factors
- stale_estimate
Evidence · table
“0.95”
Context: 2.43
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedHorseshoe Lights Project · goldTonnes: 2430000Grade: 0Grade Unit: g/tContained Metal: 3400Contained Unit: ozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Horseshoe Lights Project
- Commodity
- gold
- Ticker
- HOR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Michael Fotios
- Resource group id
- resource:e3561a503a7582f9f313
- Deposit or zone
- In-situ Deposit
Resource Data
- Category
- indicated
- Tonnes
- 2430000
- Grade
- 0
- Grade Unit
- g/t
- Contained Metal
- 3400
- Contained Unit
- oz
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2013-06-05T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is a restatement of an existing Indicated resource for gold, providing context for the pit optimisation.
Positive factors
- jorc_compliant
- qp_signed
Negative factors
- stale_estimate
Evidence · table
“0.0”
Context: 2.43
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedHorseshoe Lights Project · silverTonnes: 2430000Grade: 0.7Grade Unit: g/tContained Metal: 52.2Contained Unit: k ozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Horseshoe Lights Project
- Commodity
- silver
- Ticker
- HOR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Michael Fotios
- Resource group id
- resource:e3561a503a7582f9f313
- Deposit or zone
- In-situ Deposit
Resource Data
- Category
- indicated
- Tonnes
- 2430000
- Grade
- 0.7
- Grade Unit
- g/t
- Contained Metal
- 52.2
- Contained Unit
- k oz
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2013-06-05T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is a restatement of an existing Indicated resource for silver, providing context for the pit optimisation.
Positive factors
- jorc_compliant
- qp_signed
Negative factors
- stale_estimate
Evidence · table
“0.7”
Context: 2.43
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredHorseshoe Lights Project · copperTonnes: 8690000Grade: 1.01Grade Unit: %Contained Metal: 87400Contained Unit: tHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Horseshoe Lights Project
- Commodity
- copper
- Ticker
- HOR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Michael Fotios
- Resource group id
- resource:a3527b24efc5d4376d27
- Deposit or zone
- In-situ Deposit
Resource Data
- Category
- inferred
- Tonnes
- 8690000
- Grade
- 1.01
- Grade Unit
- %
- Contained Metal
- 87400
- Contained Unit
- t
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2013-06-05T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is a restatement of an existing Inferred resource for copper, providing context for the pit optimisation.
Positive factors
- jorc_compliant
- qp_signed
Negative factors
- stale_estimate
Evidence · table
“1.01”
Context: 8.69
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredHorseshoe Lights Project · goldTonnes: 8690000Grade: 0.1Grade Unit: g/tContained Metal: 30700Contained Unit: ozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Horseshoe Lights Project
- Commodity
- gold
- Ticker
- HOR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Michael Fotios
- Resource group id
- resource:a3527b24efc5d4376d27
- Deposit or zone
- In-situ Deposit
Resource Data
- Category
- inferred
- Tonnes
- 8690000
- Grade
- 0.1
- Grade Unit
- g/t
- Contained Metal
- 30700
- Contained Unit
- oz
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2013-06-05T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is a restatement of an existing Inferred resource for gold, providing context for the pit optimisation.
Positive factors
- jorc_compliant
- qp_signed
Negative factors
- stale_estimate
Evidence · table
“0.1”
Context: 8.69
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredHorseshoe Lights Project · silverTonnes: 8690000Grade: 2.6Grade Unit: g/tContained Metal: 712.4Contained Unit: k ozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Horseshoe Lights Project
- Commodity
- silver
- Ticker
- HOR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Michael Fotios
- Resource group id
- resource:a3527b24efc5d4376d27
- Deposit or zone
- In-situ Deposit
Resource Data
- Category
- inferred
- Tonnes
- 8690000
- Grade
- 2.6
- Grade Unit
- g/t
- Contained Metal
- 712.4
- Contained Unit
- k oz
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2013-06-05T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is a restatement of an existing Inferred resource for silver, providing context for the pit optimisation.
Positive factors
- jorc_compliant
- qp_signed
Negative factors
- stale_estimate
Evidence · table
“2.6”
Context: 8.69
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredHorseshoe Lights Project · copperTonnes: 1421000Grade: 0.48Grade Unit: %Contained Metal: 6800Contained Unit: tHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Horseshoe Lights Project
- Commodity
- copper
- Ticker
- HOR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Michael Fotios
- Resource group id
- resource:f3615877cb659d932a50
- Deposit or zone
- Flotation Tailings
Resource Data
- Category
- inferred
- Tonnes
- 1421000
- Grade
- 0.48
- Grade Unit
- %
- Contained Metal
- 6800
- Contained Unit
- t
- Cutoff Grade
- 0
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2015-02-26T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is a restatement of an existing Inferred resource for copper in flotation tailings, providing context for the pit optimisation.
Positive factors
- jorc_compliant
- qp_signed
Negative factors
- stale_estimate
Evidence · table
“0.48”
Context: 1.421
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredHorseshoe Lights Project · goldTonnes: 1421000Grade: 0.34Grade Unit: g/tContained Metal: 15300Contained Unit: ozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Horseshoe Lights Project
- Commodity
- gold
- Ticker
- HOR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Michael Fotios
- Resource group id
- resource:f3615877cb659d932a50
- Deposit or zone
- Flotation Tailings
Resource Data
- Category
- inferred
- Tonnes
- 1421000
- Grade
- 0.34
- Grade Unit
- g/t
- Contained Metal
- 15300
- Contained Unit
- oz
- Cutoff Grade
- 0
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2015-02-26T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is a restatement of an existing Inferred resource for gold in flotation tailings, providing context for the pit optimisation.
Positive factors
- jorc_compliant
- qp_signed
Negative factors
- stale_estimate
Evidence · table
“0.34”
Context: 1.421
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredHorseshoe Lights Project · silverTonnes: 1421000Grade: 6.5Grade Unit: g/tContained Metal: 294.8Contained Unit: k ozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Horseshoe Lights Project
- Commodity
- silver
- Ticker
- HOR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Michael Fotios
- Resource group id
- resource:f3615877cb659d932a50
- Deposit or zone
- Flotation Tailings
Resource Data
- Category
- inferred
- Tonnes
- 1421000
- Grade
- 6.5
- Grade Unit
- g/t
- Contained Metal
- 294.8
- Contained Unit
- k oz
- Cutoff Grade
- 0
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2015-02-26T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is a restatement of an existing Inferred resource for silver in flotation tailings, providing context for the pit optimisation.
Positive factors
- jorc_compliant
- qp_signed
Negative factors
- stale_estimate
Evidence · table
“6.5”
Context: 1.421
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredHorseshoe Lights Project · copperTonnes: 243000Grade: 1.1Grade Unit: %Contained Metal: 2650Contained Unit: tHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Horseshoe Lights Project
- Commodity
- copper
- Ticker
- HOR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Michael Fotios
- Resource group id
- resource:36cb4b8136208649e542
- Deposit or zone
- M15 Stockpiles
Resource Data
- Category
- inferred
- Tonnes
- 243000
- Grade
- 1.1
- Grade Unit
- %
- Contained Metal
- 2650
- Contained Unit
- t
- Cutoff Grade
- 0
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2015-02-26T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is a restatement of an existing Inferred resource for copper in M15 stockpiles, providing context for the pit optimisation.
Positive factors
- jorc_compliant
- qp_signed
Negative factors
- stale_estimate
Evidence · table
“1.10”
Context: 0.243
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredHorseshoe Lights Project · goldTonnes: 243000Grade: 0.17Grade Unit: g/tContained Metal: 1300Contained Unit: ozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Horseshoe Lights Project
- Commodity
- gold
- Ticker
- HOR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Michael Fotios
- Resource group id
- resource:36cb4b8136208649e542
- Deposit or zone
- M15 Stockpiles
Resource Data
- Category
- inferred
- Tonnes
- 243000
- Grade
- 0.17
- Grade Unit
- g/t
- Contained Metal
- 1300
- Contained Unit
- oz
- Cutoff Grade
- 0
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2015-02-26T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is a restatement of an existing Inferred resource for gold in M15 stockpiles, providing context for the pit optimisation.
Positive factors
- jorc_compliant
- qp_signed
Negative factors
- stale_estimate
Evidence · table
“0.17”
Context: 0.243
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredHorseshoe Lights Project · silverTonnes: 243000Grade: 4.7Grade Unit: g/tContained Metal: 36.7Contained Unit: k ozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Horseshoe Lights Project
- Commodity
- silver
- Ticker
- HOR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Michael Fotios
- Resource group id
- resource:36cb4b8136208649e542
- Deposit or zone
- M15 Stockpiles
Resource Data
- Category
- inferred
- Tonnes
- 243000
- Grade
- 4.7
- Grade Unit
- g/t
- Contained Metal
- 36.7
- Contained Unit
- k oz
- Cutoff Grade
- 0
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2015-02-26T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is a restatement of an existing Inferred resource for silver in M15 stockpiles, providing context for the pit optimisation.
Positive factors
- jorc_compliant
- qp_signed
Negative factors
- stale_estimate
Evidence · table
“4.7”
Context: 0.243
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
measuredKumarina Project · copperTonnes: 415000Grade: 1.46Grade Unit: %Contained Metal: 6100Contained Unit: tHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Kumarina Project
- Commodity
- copper
- Ticker
- HOR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Michael Fotios
- Resource group id
- resource:df06c3d292842ed11038
- Deposit or zone
- Rinaldi Prospect
Resource Data
- Category
- measured
- Tonnes
- 415000
- Grade
- 1.46
- Grade Unit
- %
- Contained Metal
- 6100
- Contained Unit
- t
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2013-03-04T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is a restatement of an existing Measured resource for copper at Rinaldi Prospect, providing context for the pit optimisation.
Positive factors
- jorc_compliant
- qp_signed
Negative factors
- stale_estimate
Evidence · table
“1.46”
Context: 415,000
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedKumarina Project · copperTonnes: 307000Grade: 1.16Grade Unit: %Contained Metal: 3500Contained Unit: tHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Kumarina Project
- Commodity
- copper
- Ticker
- HOR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Michael Fotios
- Resource group id
- resource:51a958760d9e7942d77a
- Deposit or zone
- Rinaldi Prospect
Resource Data
- Category
- indicated
- Tonnes
- 307000
- Grade
- 1.16
- Grade Unit
- %
- Contained Metal
- 3500
- Contained Unit
- t
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2013-03-04T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is a restatement of an existing Indicated resource for copper at Rinaldi Prospect, providing context for the pit optimisation.
Positive factors
- jorc_compliant
- qp_signed
Negative factors
- stale_estimate
Evidence · table
“1.16”
Context: 307,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredKumarina Project · copperTonnes: 114000Grade: 0.9Grade Unit: %Contained Metal: 1000Contained Unit: tHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Kumarina Project
- Commodity
- copper
- Ticker
- HOR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Michael Fotios
- Resource group id
- resource:27bfb13c9e623ea667a8
- Deposit or zone
- Rinaldi Prospect
Resource Data
- Category
- inferred
- Tonnes
- 114000
- Grade
- 0.9
- Grade Unit
- %
- Contained Metal
- 1000
- Contained Unit
- t
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2013-03-04T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is a restatement of an existing Inferred resource for copper at Rinaldi Prospect, providing context for the pit optimisation.
Positive factors
- jorc_compliant
- qp_signed
Negative factors
- stale_estimate
Evidence · table
“0.9”
Context: 114,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Fact 29Horseshoe Lights · copperHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Horseshoe Lights
- Commodity
- copper
- Ticker
- HOR
Resource scope
- Resource group id
- resource:e82601c507d00a0792d9
Prior Estimate
- Resource Date
- 2014-12-01
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2014-12-19T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is a historical scoping study result used for comparison, not a new finding.
Negative factors
- stale_data
Evidence · text
“Previous pit optimisation and scoping study completed in December 2014 assumed $9,925/t and resulted in mining of 5.99 Mt at 0.93% Cu for 55,700t t contained Cu with 47,375t, 12,730 oz and 271,100 oz recovered Cu, Au and Ag respectively”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 11.9 years before this release
Fact 30Horseshoe Lights · goldHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Horseshoe Lights
- Commodity
- gold
- Ticker
- HOR
Resource scope
- Resource group id
- resource:e82601c507d00a0792d9
Prior Estimate
- Resource Date
- 2014-12-01
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2014-12-19T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is a historical recovered gold figure from a previous study, used for comparison.
Negative factors
- stale_data
Evidence · text
“47,375t, 12,730 oz and 271,100 oz recovered Cu, Au and Ag respectively”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 11.9 years before this release
Fact 31Horseshoe Lights · silverHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Horseshoe Lights
- Commodity
- silver
- Ticker
- HOR
Resource scope
- Resource group id
- resource:e82601c507d00a0792d9
Prior Estimate
- Resource Date
- 2014-12-01
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2014-12-19T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is a historical recovered silver figure from a previous study, used for comparison.
Negative factors
- stale_data
Evidence · text
“47,375t, 12,730 oz and 271,100 oz recovered Cu, Au and Ag respectively”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 11.9 years before this release
Fact 32Horseshoe Lights · copperView all detailsHide details
Identity
- Project
- Horseshoe Lights
- Commodity
- copper
- Ticker
- HOR
Resource scope
- Resource group id
- resource:08c9e076366dd3e35f10
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: Payable copper price assumption for the pit optimisation.
Evidence · table
“80”
Context: Payable Cu Price %
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Fact 33Horseshoe Lights · goldView all detailsHide details
Identity
- Project
- Horseshoe Lights
- Commodity
- gold
- Ticker
- HOR
Resource scope
- Resource group id
- resource:08c9e076366dd3e35f10
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: Gold price assumption is stated, but no value was attributed to contained gold in the optimisation.
Negative factors
- no_value_attributed
Evidence · table
“185.19”
Context: Received Gold Price $/gram Au
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Fact 34Horseshoe LightsView all detailsHide details
Identity
- Project
- Horseshoe Lights
- Ticker
- HOR
Resource scope
- Resource group id
- resource:6db59524bbd334372bfb
- Material type
- oxide
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: Processing cost assumption for oxide material in the pit optimisation.
Evidence · table
“30”
Context: Processing Cost (Oxide) $/t Ore
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Fact 35Horseshoe LightsView all detailsHide details
Identity
- Project
- Horseshoe Lights
- Ticker
- HOR
Resource scope
- Resource group id
- resource:8a7010611f8e6b2ff97e
- Material type
- transitional
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: Processing cost assumption for transitional material in the pit optimisation.
Evidence · table
“50”
Context: Processing Cost (Transitional) $/t Ore
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Fact 36Horseshoe LightsView all detailsHide details
Identity
- Project
- Horseshoe Lights
- Ticker
- HOR
Resource scope
- Resource group id
- resource:8754136f00e7136fbe16
- Material type
- sulphide
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: Processing cost assumption for sulphide material in the pit optimisation.
Evidence · table
“50”
Context: Processing Cost (Sulphide) $/t Ore
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Fact 37Horseshoe LightsView all detailsHide details
Identity
- Project
- Horseshoe Lights
- Ticker
- HOR
Resource scope
- Resource group id
- resource:08c9e076366dd3e35f10
Prior Estimate
- Resource Date
- 2026-06-30
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: Private royalty assumption for the pit optimisation.
Evidence · table
“3.00”
Context: Private Royalty %
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Metallurgical Results (2)
Fact 1Horseshoe Lights · copperRecovery: 80 %View all detailsHide details
Identity
- Project
- Horseshoe Lights
- Commodity
- copper
- Ticker
- HOR
Recovery
- Recovery
- 80 %
- Recovery Basis
- assumption
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is a processing recovery assumption used in the pit optimisation, not a result from metallurgical testwork.
Negative factors
- assumption_not_test_result
Evidence · table
“80.00”
Context: Processing Recovery (Oxide and Transitional) %
Fact 2Horseshoe Lights · copperRecovery: 85 %View all detailsHide details
Identity
- Project
- Horseshoe Lights
- Commodity
- copper
- Ticker
- HOR
Recovery
- Recovery
- 85 %
- Recovery Basis
- assumption
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: This is a processing recovery assumption used in the pit optimisation, not a result from metallurgical testwork.
Negative factors
- assumption_not_test_result
Evidence · table
“85.00”
Context: Processing Recovery (Fresh) %
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.