# Grounded Lithium Reports Third Quarter 2026 Financial and Operating Results

Canonical Atlas analysis: https://atlas-aws.minestarters.com/news/grounded-lithium-reports-third-quarter-2026-financial-and-operating-results--09043442-b4ef-42e0-a044-43f49918973b

Original source: https://www.juniorminingnetwork.com/junior-miner-news/press-releases/3192-tsx-venture/grd/215047-grounded-lithium-reports-third-quarter-2026-financial-and-operating-results.html

Publisher: jmn

Original announcement: 2026-11-18T00:00:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-11-18T12:45:44.616Z

Atlas analysis updated: 2026-11-18T12:45:44.616Z

- Company: Grounded Lithium Corp.

- Ticker: GRD

- Exchange: TSXV

- Region: Unavailable

- Primary commodity: Unavailable

- Secondary commodities: None reported

- Document categories: Other, Resource update

- Extracted: 2026-11-18 12:42:10 UTC

Narrative sentiment: 0.20 · Bullish

## Minestarters Atlas summary

Grounded Lithium Corp. reported its Q3 2026 financial results, noting an increased net comprehensive loss compared to the previous year. The company highlighted the completion of a Pre-Feasibility Study for the Kindersley Lithium Project, which shows an NPV of C$125 million and an 11% IRR.

Reasoning: The document is primarily a quarterly financial report \(other\) but contains significant updates regarding the completion of a Pre-Feasibility Study \(economic\_study\) for their main lithium project.

- Positive factor: Completion of Pre-Feasibility Study \(PFS\) for Kindersley Lithium Project

- Positive factor: PFS reports positive economics \(NPV 8 of C$125M, 11% IRR\)

- Positive factor: Infrastructure upgrades in oil and gas segment driving down operating costs

- Positive factor: Secured debt financing for infrastructure

- Negative factor: Net comprehensive loss increased year-over-year

- Negative factor: Working capital deficit reported

Facts used in scoring: 2

## Classification and evidence

**PFS-Supporting**

Polarity: neutral

Story-specific tag

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: The release announces the results of a Pre-Feasibility Study for the Kindersley Lithium Project.

Evidence · text

> announced the results of the Pre-Feasibility Study on the Kindersley Lithium Project \(" KLP "\)

**NI 43-101 Compliant**

Polarity: positive

Story-specific tag

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: The technical information in the press release was prepared under the supervision of qualified persons as per NI 43-101.

Evidence · text

> Qualified Person Scientific and technical information contained in this press release has been prepared under the supervision of Doug Ashton, P.Eng., of Sproule International Limited and Derek Loveday, P.Geo., Vining Wolff, P.Eng., and Karen Mathers, P.Geo., of Stantec Consulting Ltd., each of whom is a qualified person within the meaning of NI 43-101.

## Extracted facts

Stored fact records: 2. Some facts used in scoring do not have a stored record.

## Resource Estimates (2)

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/grounded-lithium-reports-third-quarter-2026-financial-and-operating-results--09043442-b4ef-42e0-a044-43f49918973b#fact-resource-facts-0)

Kindersley Lithium Project · lithium

#### Identity

- Project: Kindersley Lithium Project
- Commodity: lithium
- Ticker: GRD

#### Resource scope

- Estimate type: resource
- Resource group id: resource:55663f8a5741382667de

#### Resource Data

- Category: indicated
- Tonnes: 1000000

#### Metal Equivalent

- Metal Eq. Unit: lithium carbonate equivalent
- Assumptions Disclosed: Yes

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-18T00:00:00.000Z

Reasoning: The document mentions a resource base of approximately 1.0 million metric tonnes of combined reserves and resources.

Evidence · text

> The KLP encompasses a resource base of approximately 1.0 million metric tonnes of combined Mineral Reserves and Measured and Indicated Resources of lithium carbonate equivalent.

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/grounded-lithium-reports-third-quarter-2026-financial-and-operating-results--09043442-b4ef-42e0-a044-43f49918973b#fact-resource-facts-1)

Kindersley Lithium Project · lithium

#### Identity

- Project: Kindersley Lithium Project
- Commodity: lithium
- Ticker: GRD

#### Resource scope

- Estimate type: reserve
- Resource group id: resource:56d6199d52614eb4e6c7

#### Resource Data

- Category: indicated
- Tonnes: 1000000

#### Metal Equivalent

- Metal Eq. Unit: lithium carbonate equivalent
- Assumptions Disclosed: Yes

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-18T00:00:00.000Z

Reasoning: The document mentions a resource base of approximately 1.0 million metric tonnes of combined reserves and resources.

Evidence · text

> The KLP encompasses a resource base of approximately 1.0 million metric tonnes of combined Mineral Reserves and Measured and Indicated Resources of lithium carbonate equivalent.

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
