# Grounded Lithium Files National Instrument 43-101 Compliant Pre-Feasibility Study for the Kindersley Lithium Project

Canonical Atlas analysis: https://atlas-aws.minestarters.com/news/grounded-lithium-files-national-instrument-43-101-compliant-pre-feasibility-stud--b19204cf-17af-4a59-8a6f-c0bf19561d9b

Original source: https://orestocks.com/company/GRD.V/press-releases/5468466740543466

Publisher: orestocks

Original announcement: 2026-10-28T11:00:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-10-28T12:02:02.895Z

Atlas analysis updated: 2026-10-28T12:02:02.895Z

- Company: Grounded Lithium Corp.

- Ticker: GRD.V

- Exchange: Unavailable

- Region: Canada

- Primary commodity: Unavailable

- Secondary commodities: None reported

- Document categories: Other, Resource update

- Extracted: 2026-10-28 11:48:56 UTC

Narrative sentiment: 0.60 · Bullish

## Minestarters Atlas summary

Grounded Lithium Corp. has released a NI 43-101 compliant Pre-Feasibility Study \(PFS\) for the Kindersley Lithium Project. The study reports a project NPV8 of C$125 million and an after-tax IRR of 11%, highlighting the project's shallow reservoir and low impurity profile.

Reasoning: The announcement of a NI 43-101 compliant Pre-Feasibility Study \(PFS\) for a lithium project with positive NPV and IRR is a major technical milestone.

- Positive factor: Positive project economics with NPV8 of C$125 million and 11% IRR

- Positive factor: Low impurity profile provides processing advantage

- Positive factor: Shallow reservoir depth \(900-1200m\) improves capital efficiency

- Positive factor: NI 43-101 compliant PFS prepared by Stantec

- Negative factor: Relatively low IRR of 11%

Facts used in scoring: 1

## Classification and evidence

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: The document explicitly states the PFS is NI 43-101 compliant.

Evidence · text

> Grounded Lithium Files National Instrument 43-101 Compliant Pre-Feasibility Study

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: Qualified Persons from Stantec and Sproule are named in the technical report context.

Evidence · text

> prepared under the supervision of Doug Ashton, P.Eng., of Sproule International Limited and Derek Loveday, P.Geo., Vining Wolff, P.Eng., and Karen Mathers, P.Geo., of Stantec Consulting Ltd.

## Extracted facts

Stored fact records: 1. Some facts used in scoring do not have a stored record.

## Resource Estimates (1)

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/grounded-lithium-files-national-instrument-43-101-compliant-pre-feasibility-stud--b19204cf-17af-4a59-8a6f-c0bf19561d9b#fact-resource-facts-0)

Kindersley Lithium Project · lithium

#### Identity

- Project: Kindersley Lithium Project
- Commodity: lithium
- Region: canada
- Reported Region: Canada
- Ticker: GRD.V

#### Resource scope

- Estimate type: resource
- Reporting standards: ni\_43\_101
- QP Signed: Yes
- Qualified person names: Doug Ashton, Derek Loveday, Karen Mathers
- Resource group id: resource:289e58656f3cde2afd64
- Deposit or zone: KLP

#### Resource Data

- Category: indicated
- Tonnes: 1000000

#### Prior Estimate

- Resource Date: 2026-06-26

#### Metal Equivalent

- Metal Eq. Unit: lithium carbonate equivalent

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-28T00:00:00.000Z

Reasoning: The PFS establishes a combined resource and reserve base of 1.0 Mt LCE.

- Positive factor: Combined Reserves and M&amp;I resources total 1.0 Mt

Evidence · text

> The KLP encompasses a resource base of approximately 1.0 million metric tonnes of combined Mineral Reserves and Measured and Indicated Resources of lithium carbonate equivalent.

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
