Grounded Lithium Files National Instrument 43-101 Compliant Pre-Feasibility Study for the Kindersley Lithium Project
Original announcement by orestocks on
- Company
- Grounded Lithium Corp.
- Ticker
- GRD.V
- Exchange
- Unavailable
- Region
- Canada
- Primary commodity
- Unavailable
- Secondary commodities
- None reported
- Document categories
- Other, Resource update
- Extracted
- 2026-10-28 11:48:56 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Grounded Lithium Corp. has released a NI 43-101 compliant Pre-Feasibility Study (PFS) for the Kindersley Lithium Project. The study reports a project NPV8 of C$125 million and an after-tax IRR of 11%, highlighting the project's shallow reservoir and low impurity profile.
Reasoning: The announcement of a NI 43-101 compliant Pre-Feasibility Study (PFS) for a lithium project with positive NPV and IRR is a major technical milestone.
Positive factors
- Positive project economics with NPV8 of C$125 million and 11% IRR
- Low impurity profile provides processing advantage
- Shallow reservoir depth (900-1200m) improves capital efficiency
- NI 43-101 compliant PFS prepared by Stantec
Negative factors
- Relatively low IRR of 11%
Facts used in scoring: 1

Classification and evidence
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: The document explicitly states the PFS is NI 43-101 compliant.
Evidence · text
“Grounded Lithium Files National Instrument 43-101 Compliant Pre-Feasibility Study”
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: Qualified Persons from Stantec and Sproule are named in the technical report context.
Evidence · text
“prepared under the supervision of Doug Ashton, P.Eng., of Sproule International Limited and Derek Loveday, P.Geo., Vining Wolff, P.Eng., and Karen Mathers, P.Geo., of Stantec Consulting Ltd.”
Extracted facts
Stored fact records: 1. Some facts used in scoring do not have a stored record.
Resource Estimates (1)
indicatedKindersley Lithium Project · lithiumTonnes: 1000000View all detailsHide details
Identity
- Project
- Kindersley Lithium Project
- Commodity
- lithium
- Region
- canada
- Reported Region
- Canada
- Ticker
- GRD.V
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- QP Signed
- Yes
- Qualified person names
- Doug Ashton, Derek Loveday, Karen Mathers
- Resource group id
- resource:289e58656f3cde2afd64
- Deposit or zone
- KLP
Resource Data
- Category
- indicated
- Tonnes
- 1000000
Prior Estimate
- Resource Date
- 2026-06-26
Metal Equivalent
- Metal Eq. Unit
- lithium carbonate equivalent
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The PFS establishes a combined resource and reserve base of 1.0 Mt LCE.
Positive factors
- Combined Reserves and M&I resources total 1.0 Mt
Evidence · text
“The KLP encompasses a resource base of approximately 1.0 million metric tonnes of combined Mineral Reserves and Measured and Indicated Resources of lithium carbonate equivalent.”
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.