# GL1: Annual Report to shareholders

Canonical Atlas analysis: https://atlas-aws.minestarters.com/news/gl1-annual-report-to-shareholders--a288558e-334f-4785-a9a5-a8d6d357a922

Original source: https://www.asx.com.au/asx/v2/statistics/displayAnnouncement.do?display=pdf&idsId=03157894

Publisher: asx

Original announcement: 2026-10-27T05:58:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-10-27T06:31:14.116Z

Atlas analysis updated: 2026-10-27T06:31:14.116Z

- Company: Global Lithium Resources Limited

- Ticker: GL1

- Exchange: ASX

- Region: Western Australia

- Primary commodity: Unavailable

- Secondary commodities: None reported

- Document categories: Resource update, Other

- Extracted: 2026-10-27 06:16:08 UTC

Narrative sentiment: 0.60 · Bullish

## Minestarters Atlas summary

Global Lithium Resources Limited's Annual Report for 2026 highlights an updated Probable Ore Reserve for its Manna Lithium Project, increasing by 8% to 20.9 Mt at 0.89% Li2O. This updated reserve, fully underpinned by Indicated Mineral Resources, supports the company's Manna-Nova Integration Study. The report also provides a comprehensive review of corporate activities, operational progress, and financial performance for the year.

Reasoning: The document reports an updated Probable Ore Reserve for the Manna Lithium Project, showing an 8% increase in tonnage to 20.9 Mt at 0.89% Li2O, which is a positive development for the project's scale and supports future development plans.

- Positive factor: Updated Probable Ore Reserve for Manna Lithium Project shows an 8% increase in tonnage.

- Positive factor: Ore Reserve is fully underpinned by Indicated Mineral Resources.

- Positive factor: The updated reserve supports the Manna-Nova Integration Study.

- Negative factor: Average grade of the updated Ore Reserve slightly decreased from 0.91% to 0.89% Li2O.

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 11

## Classification and evidence

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The updated Ore Reserve for the Manna Lithium Project is classified entirely as Probable Ore Reserve.

Evidence · text

> all classified as Probable Ore Reserves.

**Tonnage Growth**

Polarity: positive

Definition: Significant tonnage increase \(≥15%\) vs prior estimate with grade maintained or improved.

Why it applies: The updated Ore Reserve for the Manna Lithium Project represents an increase of approximately 8% in tonnage compared with the previously reported estimate.

Evidence · text

> The updated Ore Reserve represents an increase of approximately 8% in tonnage compared with the previously reported estimate of 19.4 Mt.

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: The Ore Reserve estimate for the Manna Lithium deposit was compiled by Guy Simpson, an employee of the Company.

Evidence · text

> The Ore Reserve estimate for the Manna Lithium deposit was compiled by Guy Simpson, who is an employee of the Company

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: The Mineral Resource and Ore Reserve estimates are reported in accordance with the JORC Code \(2012 Edition\).

Evidence · text

> in accordance with the JORC Code \(2012 Edition\)

**Stale Estimate**

Polarity: negative

Definition: Effective date is &gt;2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: The Manna Lithium Project Mineral Resource estimate's last revision was 12 June 2024, and the Marble Bar Lithium Project Mineral Resource estimate's last revision was 15 December 2022, with no changes reported since.

Evidence · text

> The last revision of the Manna Lithium Project Mineral Resource estimate was announced to the ASX on 12 of June 2024.

**Resource Update**

Polarity: neutral

Definition: Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The document presents updated Mineral Resource and Ore Reserve estimates as part of its annual review.

Evidence · text

> The Company has undertaken its annual review of Mineral Resources and Ore Reserves

## Extracted facts

Stored fact records: 11. Some facts used in scoring do not have a stored record.

## Resource Estimates (11)

### probable

[Link to this fact](https://atlas-aws.minestarters.com/news/gl1-annual-report-to-shareholders--a288558e-334f-4785-a9a5-a8d6d357a922#fact-resource-facts-0)

Manna Lithium Project · lithium

#### Identity

- Project: Manna Lithium Project
- Commodity: lithium
- Ticker: GL1

#### Resource scope

- Estimate type: reserve
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Guy Simpson
- Resource group id: resource:0ecb662390e3a2b96581

#### Resource Data

- Category: probable
- Tonnes: 14700000
- Grade: 0.91
- Grade Unit: % Li2O

#### Prior Estimate

- Resource Date: 2026-09-16

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-27T00:00:00.000Z

Reasoning: New Probable Ore Reserve for open pit mining at Manna Lithium Project with 14.7 Mt at 0.91% Li2O.

- Positive factor: New Probable Ore Reserve for open pit mining.

Evidence · table

> 14.7

Context: 0.91

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### probable

[Link to this fact](https://atlas-aws.minestarters.com/news/gl1-annual-report-to-shareholders--a288558e-334f-4785-a9a5-a8d6d357a922#fact-resource-facts-1)

Manna Lithium Project · lithium

#### Identity

- Project: Manna Lithium Project
- Commodity: lithium
- Ticker: GL1

#### Resource scope

- Estimate type: reserve
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Guy Simpson
- Resource group id: resource:f066e7c2bbd0f39b9345

#### Resource Data

- Category: probable
- Tonnes: 6200000
- Grade: 0.83
- Grade Unit: % Li2O

#### Prior Estimate

- Resource Date: 2026-09-16

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-27T00:00:00.000Z

Reasoning: New Probable Ore Reserve for underground mining at Manna Lithium Project with 6.2 Mt at 0.83% Li2O.

- Positive factor: New Probable Ore Reserve for underground mining.

Evidence · table

> 6.2

Context: 0.83

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### probable

[Link to this fact](https://atlas-aws.minestarters.com/news/gl1-annual-report-to-shareholders--a288558e-334f-4785-a9a5-a8d6d357a922#fact-resource-facts-2)

Manna Lithium Project · lithium

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Manna Lithium Project
- Commodity: lithium
- Ticker: GL1

#### Resource scope

- Estimate type: reserve
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Guy Simpson
- Resource group id: resource:79654a84699bf106434c

#### Resource Data

- Category: probable
- Tonnes: 20900000
- Grade: 0.89
- Grade Unit: % Li2O

#### Prior Estimate

- Resource Date: 2026-09-16

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes

#### Dates

- Event date: 2026-10-27T00:00:00.000Z

Reasoning: New combined Probable Ore Reserve for Manna Lithium Project totaling 20.9 Mt at 0.89% Li2O.

- Positive factor: New combined Probable Ore Reserve for the project.

Evidence · table

> 20.9

Context: 0.89

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/gl1-annual-report-to-shareholders--a288558e-334f-4785-a9a5-a8d6d357a922#fact-resource-facts-3)

Manna Lithium Project · lithium

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Manna Lithium Project
- Commodity: lithium
- Ticker: GL1

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- Resource group id: resource:0c503bf9615f566b8b0a

#### Resource Data

- Category: indicated
- Tonnes: 32900000
- Grade: 1.04
- Grade Unit: % Li2O
- Cutoff Grade: 0.6
- Cutoff Unit: % Li2O

#### Prior Estimate

- Resource Date: 2024-06-12

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2024-06-12T00:00:00.000Z

#### Dates

- Event date: 2026-10-27T00:00:00.000Z

Reasoning: Restatement of previously reported Indicated Mineral Resource for Manna Lithium Project.

- Negative factor: This is a restatement of a prior estimate with no new information.

Evidence · table

> 32.9

Context: 1.04

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**Stale Estimate**

Polarity: negative

Definition: Effective date is &gt;2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.4 years before this release

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/gl1-annual-report-to-shareholders--a288558e-334f-4785-a9a5-a8d6d357a922#fact-resource-facts-4)

Manna Lithium Project · tantalum

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Manna Lithium Project
- Commodity: tantalum
- Ticker: GL1

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- Resource group id: resource:0c503bf9615f566b8b0a

#### Resource Data

- Category: indicated
- Tonnes: 32900000
- Grade: 52
- Grade Unit: ppm
- Cutoff Grade: 0.6
- Cutoff Unit: % Li2O

#### Prior Estimate

- Resource Date: 2024-06-12

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2024-06-12T00:00:00.000Z

#### Dates

- Event date: 2026-10-27T00:00:00.000Z

Reasoning: Restatement of previously reported Indicated Mineral Resource for Manna Lithium Project, including tantalum.

- Negative factor: This is a restatement of a prior estimate with no new information.

Evidence · table

> 52

Context: 32.9

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**Stale Estimate**

Polarity: negative

Definition: Effective date is &gt;2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.4 years before this release

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/gl1-annual-report-to-shareholders--a288558e-334f-4785-a9a5-a8d6d357a922#fact-resource-facts-5)

Manna Lithium Project · lithium

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Manna Lithium Project
- Commodity: lithium
- Ticker: GL1

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- Resource group id: resource:fe50f08d92e873cb480c

#### Resource Data

- Category: inferred
- Tonnes: 18700000
- Grade: 0.92
- Grade Unit: % Li2O
- Cutoff Grade: 0.6
- Cutoff Unit: % Li2O

#### Prior Estimate

- Resource Date: 2024-06-12

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2024-06-12T00:00:00.000Z

#### Dates

- Event date: 2026-10-27T00:00:00.000Z

Reasoning: Restatement of previously reported Inferred Mineral Resource for Manna Lithium Project.

- Negative factor: This is a restatement of a prior estimate with no new information.

Evidence · table

> 18.7

Context: 0.92

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**Stale Estimate**

Polarity: negative

Definition: Effective date is &gt;2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.4 years before this release

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/gl1-annual-report-to-shareholders--a288558e-334f-4785-a9a5-a8d6d357a922#fact-resource-facts-6)

Manna Lithium Project · tantalum

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Manna Lithium Project
- Commodity: tantalum
- Ticker: GL1

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- Resource group id: resource:fe50f08d92e873cb480c

#### Resource Data

- Category: inferred
- Tonnes: 18700000
- Grade: 50
- Grade Unit: ppm
- Cutoff Grade: 0.6
- Cutoff Unit: % Li2O

#### Prior Estimate

- Resource Date: 2024-06-12

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2024-06-12T00:00:00.000Z

#### Dates

- Event date: 2026-10-27T00:00:00.000Z

Reasoning: Restatement of previously reported Inferred Mineral Resource for Manna Lithium Project, including tantalum.

- Negative factor: This is a restatement of a prior estimate with no new information.

Evidence · table

> 50

Context: 18.7

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**Stale Estimate**

Polarity: negative

Definition: Effective date is &gt;2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.4 years before this release

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/gl1-annual-report-to-shareholders--a288558e-334f-4785-a9a5-a8d6d357a922#fact-resource-facts-7)

Marble Bar Lithium Project · lithium

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Marble Bar Lithium Project
- Commodity: lithium
- Ticker: GL1

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- Resource group id: resource:985af33918acf648314b

#### Resource Data

- Category: indicated
- Tonnes: 3800000
- Grade: 0.97
- Grade Unit: % Li2O
- Cutoff Grade: 0.45
- Cutoff Unit: % Li2O

#### Prior Estimate

- Resource Date: 2022-12-15

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2022-12-15T00:00:00.000Z

#### Dates

- Event date: 2026-10-27T00:00:00.000Z

Reasoning: Restatement of previously reported Indicated Mineral Resource for Marble Bar Lithium Project.

- Negative factor: This is a restatement of a prior estimate with no new information.

Evidence · table

> 3.8

Context: 0.97

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**Stale Estimate**

Polarity: negative

Definition: Effective date is &gt;2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.9 years before this release

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/gl1-annual-report-to-shareholders--a288558e-334f-4785-a9a5-a8d6d357a922#fact-resource-facts-8)

Marble Bar Lithium Project · tantalum

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Marble Bar Lithium Project
- Commodity: tantalum
- Ticker: GL1

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- Resource group id: resource:985af33918acf648314b

#### Resource Data

- Category: indicated
- Tonnes: 3800000
- Grade: 53
- Grade Unit: ppm
- Cutoff Grade: 0.45
- Cutoff Unit: % Li2O

#### Prior Estimate

- Resource Date: 2022-12-15

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2022-12-15T00:00:00.000Z

#### Dates

- Event date: 2026-10-27T00:00:00.000Z

Reasoning: Restatement of previously reported Indicated Mineral Resource for Marble Bar Lithium Project, including tantalum.

- Negative factor: This is a restatement of a prior estimate with no new information.

Evidence · table

> 53

Context: 3.8

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**Stale Estimate**

Polarity: negative

Definition: Effective date is &gt;2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.9 years before this release

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/gl1-annual-report-to-shareholders--a288558e-334f-4785-a9a5-a8d6d357a922#fact-resource-facts-9)

Marble Bar Lithium Project · lithium

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Marble Bar Lithium Project
- Commodity: lithium
- Ticker: GL1

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- Resource group id: resource:554e3d03870cf0c4ee5b

#### Resource Data

- Category: inferred
- Tonnes: 14200000
- Grade: 1.01
- Grade Unit: % Li2O
- Cutoff Grade: 0.45
- Cutoff Unit: % Li2O

#### Prior Estimate

- Resource Date: 2022-12-15

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2022-12-15T00:00:00.000Z

#### Dates

- Event date: 2026-10-27T00:00:00.000Z

Reasoning: Restatement of previously reported Inferred Mineral Resource for Marble Bar Lithium Project.

- Negative factor: This is a restatement of a prior estimate with no new information.

Evidence · table

> 14.2

Context: 1.01

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**Stale Estimate**

Polarity: negative

Definition: Effective date is &gt;2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.9 years before this release

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/gl1-annual-report-to-shareholders--a288558e-334f-4785-a9a5-a8d6d357a922#fact-resource-facts-10)

Marble Bar Lithium Project · tantalum

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Marble Bar Lithium Project
- Commodity: tantalum
- Ticker: GL1

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- Resource group id: resource:554e3d03870cf0c4ee5b

#### Resource Data

- Category: inferred
- Tonnes: 14200000
- Grade: 50
- Grade Unit: ppm
- Cutoff Grade: 0.45
- Cutoff Unit: % Li2O

#### Prior Estimate

- Resource Date: 2022-12-15

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2022-12-15T00:00:00.000Z

#### Dates

- Event date: 2026-10-27T00:00:00.000Z

Reasoning: Restatement of previously reported Inferred Mineral Resource for Marble Bar Lithium Project, including tantalum.

- Negative factor: This is a restatement of a prior estimate with no new information.

Evidence · table

> 50

Context: 14.2

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**Stale Estimate**

Polarity: negative

Definition: Effective date is &gt;2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.9 years before this release

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
