GL1: Annual Report to shareholders

Original announcement by asx on

Company
Global Lithium Resources Limited
Ticker
GL1
Exchange
ASX
Region
Western Australia
Primary commodity
Unavailable
Secondary commodities
None reported
Document categories
Resource update, Other
Extracted
2026-10-27 06:16:08 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Global Lithium Resources Limited's Annual Report for 2026 highlights an updated Probable Ore Reserve for its Manna Lithium Project, increasing by 8% to 20.9 Mt at 0.89% Li2O. This updated reserve, fully underpinned by Indicated Mineral Resources, supports the company's Manna-Nova Integration Study. The report also provides a comprehensive review of corporate activities, operational progress, and financial performance for the year.

Reasoning: The document reports an updated Probable Ore Reserve for the Manna Lithium Project, showing an 8% increase in tonnage to 20.9 Mt at 0.89% Li2O, which is a positive development for the project's scale and supports future development plans.

Positive factors

  • Updated Probable Ore Reserve for Manna Lithium Project shows an 8% increase in tonnage.
  • Ore Reserve is fully underpinned by Indicated Mineral Resources.
  • The updated reserve supports the Manna-Nova Integration Study.

Negative factors

  • Average grade of the updated Ore Reserve slightly decreased from 0.91% to 0.89% Li2O.

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 11

Atlas analysis — Global Lithium Resources Limited: GL1: Annual Report to shareholders. probable 14700000 tonnes

Classification and evidence

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The updated Ore Reserve for the Manna Lithium Project is classified entirely as Probable Ore Reserve.

Evidence · text

“all classified as Probable Ore Reserves.”

Tonnage Growthpositive

Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.

Why it applies: The updated Ore Reserve for the Manna Lithium Project represents an increase of approximately 8% in tonnage compared with the previously reported estimate.

Evidence · text

“The updated Ore Reserve represents an increase of approximately 8% in tonnage compared with the previously reported estimate of 19.4 Mt.”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: The Ore Reserve estimate for the Manna Lithium deposit was compiled by Guy Simpson, an employee of the Company.

Evidence · text

“The Ore Reserve estimate for the Manna Lithium deposit was compiled by Guy Simpson, who is an employee of the Company”

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The Mineral Resource and Ore Reserve estimates are reported in accordance with the JORC Code (2012 Edition).

Evidence · text

“in accordance with the JORC Code (2012 Edition)”

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: The Manna Lithium Project Mineral Resource estimate's last revision was 12 June 2024, and the Marble Bar Lithium Project Mineral Resource estimate's last revision was 15 December 2022, with no changes reported since.

Evidence · text

“The last revision of the Manna Lithium Project Mineral Resource estimate was announced to the ASX on 12 of June 2024.”

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The document presents updated Mineral Resource and Ore Reserve estimates as part of its annual review.

Evidence · text

“The Company has undertaken its annual review of Mineral Resources and Ore Reserves”

Extracted facts

Stored fact records: 11. Some facts used in scoring do not have a stored record.

Resource Estimates (11)

probableManna Lithium Project · lithiumTonnes: 14700000Grade: 0.91Grade Unit: % Li2OView all details
Link to this fact

Identity

Project
Manna Lithium Project
Commodity
lithium
Ticker
GL1

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Guy Simpson
Resource group id
resource:0ecb662390e3a2b96581

Resource Data

Category
probable
Tonnes
14700000
Grade
0.91
Grade Unit
% Li2O

Prior Estimate

Resource Date
2026-09-16

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-27T00:00:00.000Z

Reasoning: New Probable Ore Reserve for open pit mining at Manna Lithium Project with 14.7 Mt at 0.91% Li2O.

Positive factors

  • New Probable Ore Reserve for open pit mining.

Evidence · table

“14.7”

Context: 0.91

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

probableManna Lithium Project · lithiumTonnes: 6200000Grade: 0.83Grade Unit: % Li2OView all details
Link to this fact

Identity

Project
Manna Lithium Project
Commodity
lithium
Ticker
GL1

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Guy Simpson
Resource group id
resource:f066e7c2bbd0f39b9345

Resource Data

Category
probable
Tonnes
6200000
Grade
0.83
Grade Unit
% Li2O

Prior Estimate

Resource Date
2026-09-16

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-27T00:00:00.000Z

Reasoning: New Probable Ore Reserve for underground mining at Manna Lithium Project with 6.2 Mt at 0.83% Li2O.

Positive factors

  • New Probable Ore Reserve for underground mining.

Evidence · table

“6.2”

Context: 0.83

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

probableManna Lithium Project · lithiumTonnes: 20900000Grade: 0.89Grade Unit: % Li2OHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Manna Lithium Project
Commodity
lithium
Ticker
GL1

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Guy Simpson
Resource group id
resource:79654a84699bf106434c

Resource Data

Category
probable
Tonnes
20900000
Grade
0.89
Grade Unit
% Li2O

Prior Estimate

Resource Date
2026-09-16

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes

Dates

Event date
2026-10-27T00:00:00.000Z

Reasoning: New combined Probable Ore Reserve for Manna Lithium Project totaling 20.9 Mt at 0.89% Li2O.

Positive factors

  • New combined Probable Ore Reserve for the project.

Evidence · table

“20.9”

Context: 0.89

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedManna Lithium Project · lithiumTonnes: 32900000Grade: 1.04Grade Unit: % Li2OHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Manna Lithium Project
Commodity
lithium
Ticker
GL1

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:0c503bf9615f566b8b0a

Resource Data

Category
indicated
Tonnes
32900000
Grade
1.04
Grade Unit
% Li2O
Cutoff Grade
0.6
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2024-06-12

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2024-06-12T00:00:00.000Z

Dates

Event date
2026-10-27T00:00:00.000Z

Reasoning: Restatement of previously reported Indicated Mineral Resource for Manna Lithium Project.

Negative factors

  • This is a restatement of a prior estimate with no new information.

Evidence · table

“32.9”

Context: 1.04

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.4 years before this release

indicatedManna Lithium Project · tantalumTonnes: 32900000Grade: 52Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Manna Lithium Project
Commodity
tantalum
Ticker
GL1

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:0c503bf9615f566b8b0a

Resource Data

Category
indicated
Tonnes
32900000
Grade
52
Grade Unit
ppm
Cutoff Grade
0.6
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2024-06-12

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2024-06-12T00:00:00.000Z

Dates

Event date
2026-10-27T00:00:00.000Z

Reasoning: Restatement of previously reported Indicated Mineral Resource for Manna Lithium Project, including tantalum.

Negative factors

  • This is a restatement of a prior estimate with no new information.

Evidence · table

“52”

Context: 32.9

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.4 years before this release

inferredManna Lithium Project · lithiumTonnes: 18700000Grade: 0.92Grade Unit: % Li2OHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Manna Lithium Project
Commodity
lithium
Ticker
GL1

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:fe50f08d92e873cb480c

Resource Data

Category
inferred
Tonnes
18700000
Grade
0.92
Grade Unit
% Li2O
Cutoff Grade
0.6
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2024-06-12

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2024-06-12T00:00:00.000Z

Dates

Event date
2026-10-27T00:00:00.000Z

Reasoning: Restatement of previously reported Inferred Mineral Resource for Manna Lithium Project.

Negative factors

  • This is a restatement of a prior estimate with no new information.

Evidence · table

“18.7”

Context: 0.92

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.4 years before this release

inferredManna Lithium Project · tantalumTonnes: 18700000Grade: 50Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Manna Lithium Project
Commodity
tantalum
Ticker
GL1

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:fe50f08d92e873cb480c

Resource Data

Category
inferred
Tonnes
18700000
Grade
50
Grade Unit
ppm
Cutoff Grade
0.6
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2024-06-12

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2024-06-12T00:00:00.000Z

Dates

Event date
2026-10-27T00:00:00.000Z

Reasoning: Restatement of previously reported Inferred Mineral Resource for Manna Lithium Project, including tantalum.

Negative factors

  • This is a restatement of a prior estimate with no new information.

Evidence · table

“50”

Context: 18.7

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.4 years before this release

indicatedMarble Bar Lithium Project · lithiumTonnes: 3800000Grade: 0.97Grade Unit: % Li2OHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Marble Bar Lithium Project
Commodity
lithium
Ticker
GL1

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:985af33918acf648314b

Resource Data

Category
indicated
Tonnes
3800000
Grade
0.97
Grade Unit
% Li2O
Cutoff Grade
0.45
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2022-12-15

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2022-12-15T00:00:00.000Z

Dates

Event date
2026-10-27T00:00:00.000Z

Reasoning: Restatement of previously reported Indicated Mineral Resource for Marble Bar Lithium Project.

Negative factors

  • This is a restatement of a prior estimate with no new information.

Evidence · table

“3.8”

Context: 0.97

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.9 years before this release

indicatedMarble Bar Lithium Project · tantalumTonnes: 3800000Grade: 53Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Marble Bar Lithium Project
Commodity
tantalum
Ticker
GL1

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:985af33918acf648314b

Resource Data

Category
indicated
Tonnes
3800000
Grade
53
Grade Unit
ppm
Cutoff Grade
0.45
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2022-12-15

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2022-12-15T00:00:00.000Z

Dates

Event date
2026-10-27T00:00:00.000Z

Reasoning: Restatement of previously reported Indicated Mineral Resource for Marble Bar Lithium Project, including tantalum.

Negative factors

  • This is a restatement of a prior estimate with no new information.

Evidence · table

“53”

Context: 3.8

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.9 years before this release

inferredMarble Bar Lithium Project · lithiumTonnes: 14200000Grade: 1.01Grade Unit: % Li2OHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Marble Bar Lithium Project
Commodity
lithium
Ticker
GL1

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:554e3d03870cf0c4ee5b

Resource Data

Category
inferred
Tonnes
14200000
Grade
1.01
Grade Unit
% Li2O
Cutoff Grade
0.45
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2022-12-15

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2022-12-15T00:00:00.000Z

Dates

Event date
2026-10-27T00:00:00.000Z

Reasoning: Restatement of previously reported Inferred Mineral Resource for Marble Bar Lithium Project.

Negative factors

  • This is a restatement of a prior estimate with no new information.

Evidence · table

“14.2”

Context: 1.01

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.9 years before this release

inferredMarble Bar Lithium Project · tantalumTonnes: 14200000Grade: 50Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Marble Bar Lithium Project
Commodity
tantalum
Ticker
GL1

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:554e3d03870cf0c4ee5b

Resource Data

Category
inferred
Tonnes
14200000
Grade
50
Grade Unit
ppm
Cutoff Grade
0.45
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2022-12-15

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2022-12-15T00:00:00.000Z

Dates

Event date
2026-10-27T00:00:00.000Z

Reasoning: Restatement of previously reported Inferred Mineral Resource for Marble Bar Lithium Project, including tantalum.

Negative factors

  • This is a restatement of a prior estimate with no new information.

Evidence · table

“50”

Context: 14.2

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.9 years before this release

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.