GL1: Annual Report to shareholders
Original announcement by asx on
- Company
- Global Lithium Resources Limited
- Ticker
- GL1
- Exchange
- ASX
- Region
- Western Australia
- Primary commodity
- Unavailable
- Secondary commodities
- None reported
- Document categories
- Resource update, Other
- Extracted
- 2026-10-27 06:16:08 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Global Lithium Resources Limited's Annual Report for 2026 highlights an updated Probable Ore Reserve for its Manna Lithium Project, increasing by 8% to 20.9 Mt at 0.89% Li2O. This updated reserve, fully underpinned by Indicated Mineral Resources, supports the company's Manna-Nova Integration Study. The report also provides a comprehensive review of corporate activities, operational progress, and financial performance for the year.
Reasoning: The document reports an updated Probable Ore Reserve for the Manna Lithium Project, showing an 8% increase in tonnage to 20.9 Mt at 0.89% Li2O, which is a positive development for the project's scale and supports future development plans.
Positive factors
- Updated Probable Ore Reserve for Manna Lithium Project shows an 8% increase in tonnage.
- Ore Reserve is fully underpinned by Indicated Mineral Resources.
- The updated reserve supports the Manna-Nova Integration Study.
Negative factors
- Average grade of the updated Ore Reserve slightly decreased from 0.91% to 0.89% Li2O.
Low confidence — this extraction should be reviewed alongside the original source.
Facts used in scoring: 11

Classification and evidence
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The updated Ore Reserve for the Manna Lithium Project is classified entirely as Probable Ore Reserve.
Evidence · text
“all classified as Probable Ore Reserves.”
Tonnage Growthpositive
Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.
Why it applies: The updated Ore Reserve for the Manna Lithium Project represents an increase of approximately 8% in tonnage compared with the previously reported estimate.
Evidence · text
“The updated Ore Reserve represents an increase of approximately 8% in tonnage compared with the previously reported estimate of 19.4 Mt.”
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: The Ore Reserve estimate for the Manna Lithium deposit was compiled by Guy Simpson, an employee of the Company.
Evidence · text
“The Ore Reserve estimate for the Manna Lithium deposit was compiled by Guy Simpson, who is an employee of the Company”
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: The Mineral Resource and Ore Reserve estimates are reported in accordance with the JORC Code (2012 Edition).
Evidence · text
“in accordance with the JORC Code (2012 Edition)”
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: The Manna Lithium Project Mineral Resource estimate's last revision was 12 June 2024, and the Marble Bar Lithium Project Mineral Resource estimate's last revision was 15 December 2022, with no changes reported since.
Evidence · text
“The last revision of the Manna Lithium Project Mineral Resource estimate was announced to the ASX on 12 of June 2024.”
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: The document presents updated Mineral Resource and Ore Reserve estimates as part of its annual review.
Evidence · text
“The Company has undertaken its annual review of Mineral Resources and Ore Reserves”
Extracted facts
Stored fact records: 11. Some facts used in scoring do not have a stored record.
Resource Estimates (11)
probableManna Lithium Project · lithiumTonnes: 14700000Grade: 0.91Grade Unit: % Li2OView all detailsHide details
Identity
- Project
- Manna Lithium Project
- Commodity
- lithium
- Ticker
- GL1
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Guy Simpson
- Resource group id
- resource:0ecb662390e3a2b96581
Resource Data
- Category
- probable
- Tonnes
- 14700000
- Grade
- 0.91
- Grade Unit
- % Li2O
Prior Estimate
- Resource Date
- 2026-09-16
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-27T00:00:00.000Z
Reasoning: New Probable Ore Reserve for open pit mining at Manna Lithium Project with 14.7 Mt at 0.91% Li2O.
Positive factors
- New Probable Ore Reserve for open pit mining.
Evidence · table
“14.7”
Context: 0.91
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
probableManna Lithium Project · lithiumTonnes: 6200000Grade: 0.83Grade Unit: % Li2OView all detailsHide details
Identity
- Project
- Manna Lithium Project
- Commodity
- lithium
- Ticker
- GL1
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Guy Simpson
- Resource group id
- resource:f066e7c2bbd0f39b9345
Resource Data
- Category
- probable
- Tonnes
- 6200000
- Grade
- 0.83
- Grade Unit
- % Li2O
Prior Estimate
- Resource Date
- 2026-09-16
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-27T00:00:00.000Z
Reasoning: New Probable Ore Reserve for underground mining at Manna Lithium Project with 6.2 Mt at 0.83% Li2O.
Positive factors
- New Probable Ore Reserve for underground mining.
Evidence · table
“6.2”
Context: 0.83
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
probableManna Lithium Project · lithiumTonnes: 20900000Grade: 0.89Grade Unit: % Li2OHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Manna Lithium Project
- Commodity
- lithium
- Ticker
- GL1
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Guy Simpson
- Resource group id
- resource:79654a84699bf106434c
Resource Data
- Category
- probable
- Tonnes
- 20900000
- Grade
- 0.89
- Grade Unit
- % Li2O
Prior Estimate
- Resource Date
- 2026-09-16
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
Dates
- Event date
- 2026-10-27T00:00:00.000Z
Reasoning: New combined Probable Ore Reserve for Manna Lithium Project totaling 20.9 Mt at 0.89% Li2O.
Positive factors
- New combined Probable Ore Reserve for the project.
Evidence · table
“20.9”
Context: 0.89
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedManna Lithium Project · lithiumTonnes: 32900000Grade: 1.04Grade Unit: % Li2OHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Manna Lithium Project
- Commodity
- lithium
- Ticker
- GL1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:0c503bf9615f566b8b0a
Resource Data
- Category
- indicated
- Tonnes
- 32900000
- Grade
- 1.04
- Grade Unit
- % Li2O
- Cutoff Grade
- 0.6
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2024-06-12
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2024-06-12T00:00:00.000Z
Dates
- Event date
- 2026-10-27T00:00:00.000Z
Reasoning: Restatement of previously reported Indicated Mineral Resource for Manna Lithium Project.
Negative factors
- This is a restatement of a prior estimate with no new information.
Evidence · table
“32.9”
Context: 1.04
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
indicatedManna Lithium Project · tantalumTonnes: 32900000Grade: 52Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Manna Lithium Project
- Commodity
- tantalum
- Ticker
- GL1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:0c503bf9615f566b8b0a
Resource Data
- Category
- indicated
- Tonnes
- 32900000
- Grade
- 52
- Grade Unit
- ppm
- Cutoff Grade
- 0.6
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2024-06-12
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2024-06-12T00:00:00.000Z
Dates
- Event date
- 2026-10-27T00:00:00.000Z
Reasoning: Restatement of previously reported Indicated Mineral Resource for Manna Lithium Project, including tantalum.
Negative factors
- This is a restatement of a prior estimate with no new information.
Evidence · table
“52”
Context: 32.9
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
inferredManna Lithium Project · lithiumTonnes: 18700000Grade: 0.92Grade Unit: % Li2OHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Manna Lithium Project
- Commodity
- lithium
- Ticker
- GL1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:fe50f08d92e873cb480c
Resource Data
- Category
- inferred
- Tonnes
- 18700000
- Grade
- 0.92
- Grade Unit
- % Li2O
- Cutoff Grade
- 0.6
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2024-06-12
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2024-06-12T00:00:00.000Z
Dates
- Event date
- 2026-10-27T00:00:00.000Z
Reasoning: Restatement of previously reported Inferred Mineral Resource for Manna Lithium Project.
Negative factors
- This is a restatement of a prior estimate with no new information.
Evidence · table
“18.7”
Context: 0.92
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
inferredManna Lithium Project · tantalumTonnes: 18700000Grade: 50Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Manna Lithium Project
- Commodity
- tantalum
- Ticker
- GL1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:fe50f08d92e873cb480c
Resource Data
- Category
- inferred
- Tonnes
- 18700000
- Grade
- 50
- Grade Unit
- ppm
- Cutoff Grade
- 0.6
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2024-06-12
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2024-06-12T00:00:00.000Z
Dates
- Event date
- 2026-10-27T00:00:00.000Z
Reasoning: Restatement of previously reported Inferred Mineral Resource for Manna Lithium Project, including tantalum.
Negative factors
- This is a restatement of a prior estimate with no new information.
Evidence · table
“50”
Context: 18.7
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
indicatedMarble Bar Lithium Project · lithiumTonnes: 3800000Grade: 0.97Grade Unit: % Li2OHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Marble Bar Lithium Project
- Commodity
- lithium
- Ticker
- GL1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:985af33918acf648314b
Resource Data
- Category
- indicated
- Tonnes
- 3800000
- Grade
- 0.97
- Grade Unit
- % Li2O
- Cutoff Grade
- 0.45
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2022-12-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2022-12-15T00:00:00.000Z
Dates
- Event date
- 2026-10-27T00:00:00.000Z
Reasoning: Restatement of previously reported Indicated Mineral Resource for Marble Bar Lithium Project.
Negative factors
- This is a restatement of a prior estimate with no new information.
Evidence · table
“3.8”
Context: 0.97
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.9 years before this release
indicatedMarble Bar Lithium Project · tantalumTonnes: 3800000Grade: 53Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Marble Bar Lithium Project
- Commodity
- tantalum
- Ticker
- GL1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:985af33918acf648314b
Resource Data
- Category
- indicated
- Tonnes
- 3800000
- Grade
- 53
- Grade Unit
- ppm
- Cutoff Grade
- 0.45
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2022-12-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2022-12-15T00:00:00.000Z
Dates
- Event date
- 2026-10-27T00:00:00.000Z
Reasoning: Restatement of previously reported Indicated Mineral Resource for Marble Bar Lithium Project, including tantalum.
Negative factors
- This is a restatement of a prior estimate with no new information.
Evidence · table
“53”
Context: 3.8
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.9 years before this release
inferredMarble Bar Lithium Project · lithiumTonnes: 14200000Grade: 1.01Grade Unit: % Li2OHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Marble Bar Lithium Project
- Commodity
- lithium
- Ticker
- GL1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:554e3d03870cf0c4ee5b
Resource Data
- Category
- inferred
- Tonnes
- 14200000
- Grade
- 1.01
- Grade Unit
- % Li2O
- Cutoff Grade
- 0.45
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2022-12-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2022-12-15T00:00:00.000Z
Dates
- Event date
- 2026-10-27T00:00:00.000Z
Reasoning: Restatement of previously reported Inferred Mineral Resource for Marble Bar Lithium Project.
Negative factors
- This is a restatement of a prior estimate with no new information.
Evidence · table
“14.2”
Context: 1.01
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.9 years before this release
inferredMarble Bar Lithium Project · tantalumTonnes: 14200000Grade: 50Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Marble Bar Lithium Project
- Commodity
- tantalum
- Ticker
- GL1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:554e3d03870cf0c4ee5b
Resource Data
- Category
- inferred
- Tonnes
- 14200000
- Grade
- 50
- Grade Unit
- ppm
- Cutoff Grade
- 0.45
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2022-12-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2022-12-15T00:00:00.000Z
Dates
- Event date
- 2026-10-27T00:00:00.000Z
Reasoning: Restatement of previously reported Inferred Mineral Resource for Marble Bar Lithium Project, including tantalum.
Negative factors
- This is a restatement of a prior estimate with no new information.
Evidence · table
“50”
Context: 14.2
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.9 years before this release
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.