FUN: Mkanda Rare Earths and Zircon Resource

Original announcement by asx on

Company
FORTUNA METALS
Ticker
FUN
Exchange
ASX
Region
Malawi
Primary commodity
Rutile
Secondary commodities
Graphite, Zircon, Monazite, Rare earths
Document categories
Resource update
Extracted
2026-11-15 22:13:37 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Fortuna Metals has released an updated Mineral Resource Estimate for its Mkanda Project in Malawi, introducing maiden estimates for zircon and monazite alongside updated figures for rutile and graphite. The MRE reports 97,400 tonnes of zircon and 34,100 tonnes of monazite at a 0.7% rutile cut-off, with all mineralisation classified as Inferred. While rutile tonnage and grade saw a slight decrease, graphite grade and contained metal increased, highlighting the multi-commodity potential of the project.

Reasoning: The updated Mineral Resource Estimate introduces significant quantities of zircon and monazite, representing new potential revenue streams. Graphite shows improved grade and contained metal, while rutile figures experienced a slight decrease compared to the prior estimate. The resource remains entirely in the Inferred category.

Positive factors

  • Maiden resource estimate for zircon and monazite adds new potential revenue streams.
  • Graphite grade and contained metal increased compared to the prior estimate.
  • Large inferred resource base established for multiple commodities.
  • JORC 2012 compliant estimate with Competent Person sign-off.

Negative factors

  • Slight decrease in rutile tonnage, grade, and contained metal at the principal 0.7% cut-off.
  • All mineralisation is classified as Inferred, indicating early-stage confidence.
  • Cautionary statement notes zircon and monazite estimates are not TREO, recoverable product, or saleable concentrate.

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 28

Atlas analysis — FORTUNA METALS: FUN: Mkanda Rare Earths and Zircon Resource. inferred 847900000 tonnes

Classification and evidence

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: The document explicitly states this is the first time zircon and monazite estimates are included in the MRE.

Evidence · text

“Updated Mineral Resource Estimate (MRE) model reports 34,100 tonnes of rare earth monazite and 97,400 tonnes of zircon at 0.7% rutile cut-off, Table 1.”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: All mineralisation for zircon, monazite, rutile, and graphite is classified as Inferred.

Evidence · text

“All mineralisation is classified as Inferred.”

All Inferrednegative

100% of resource is Inferred category — very early stage, no engineering confidence.

Why it applies: The document explicitly states that all mineralisation in the updated MRE is classified as Inferred.

Evidence · text

“All mineralisation is classified as Inferred.”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: Mr Richard Stockwell, a Competent Person and Fellow of the Australian Institute of Geoscientists, is named as responsible for the Mineral Resource Estimate.

Evidence · text

“The information in this announcement that relates to the Mineral Resource Estimate is based on, and fairly represents, information compiled by Mr Richard Stockwell, a Competent Person who is a Fellow of the Australian Institute of Geoscientists.”

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The MRE is prepared in accordance with the JORC Code 2012.

Evidence · text

“The Updated Mkanda MRE has been prepared by independent consultant, Placer Consulting Pty Ltd (Placer). ... The following information is provided in accordance with ASX Listing Rule 5.8 and the JORC Code 2012.”

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: The resource estimates are reported at various rutile cut-off grades from 0.4% to 1.0%.

Evidence · text

“The MRE has been reported using various rutile % cut-off grades stated in Tables 1 and 2 below.”

Contained Metal Growthpositive

True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: Graphite contained metal increased from 3.55 Mt to 3.95 Mt at the 0.7% rutile cut-off.

Evidence · text

“Contained TGC Mt ... 3.95”

Grade Improvementpositive

Average resource grade improved vs prior estimate — better deposit economics.

Why it applies: Graphite grade increased from 1.19% to 1.35% at the 0.7% rutile cut-off.

Evidence · text

“Total Graphitic Carbon (TGC) % ... 1.35”

Contained Metal Declinenegative

Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.

Why it applies: Rutile contained metal decreased from 2.59 Mt to 2.53 Mt at the 0.7% rutile cut-off.

Evidence · text

“Contained Rutile (Mt) ... 2.53”

Grade Declinenegative

Average grade dropped >5% vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.

Why it applies: Rutile grade decreased from 0.87% to 0.86% at the 0.7% rutile cut-off.

Evidence · text

“Rutile % ... 0.86”

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: Rutile and graphite tonnage decreased from 298 Mt to 292.5 Mt at the 0.7% rutile cut-off.

Evidence · text

“Resource (Mt) ... 292.5”

Extracted facts

Stored fact records: 28. Some facts used in scoring do not have a stored record.

Resource Estimates (28)

inferredMkanda · zirconTonnes: 847900000Grade: 351Grade Unit: ppmContained Metal: 297900Contained Unit: tView all details
Link to this fact

Identity

Project
Mkanda
Commodity
zircon
Region
malawi
Reported Region
Malawi
Ticker
FUN

Resource scope

Estimate type
resource
Effective date
2026-11-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Stockwell
Resource group id
resource:8c259f94ef859f6c21ad
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
847900000
Grade
351
Grade Unit
ppm
Contained Metal
297900
Contained Unit
t
Cutoff Grade
0.4
Cutoff Unit
% rutile

Prior Estimate

Resource Date
2026-11-16

Lab

Laboratory
Scientific Services South Africa and Intertek-Genalysis Zambia

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-15T00:00:00.000Z

Reasoning: This is the first reported resource for zircon at Mkanda, adding significant potential value to the project, though it is entirely in the Inferred category and subject to further verification.

Positive factors

  • Maiden resource estimate for zircon adds a new potential revenue stream.
  • Large contained zircon tonnage.

Negative factors

  • All mineralisation is classified as Inferred.
  • Cautionary statement regarding recoverability and saleability.

Evidence · table

“351”

Context: 297,900

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMkanda · monaziteTonnes: 847900000Grade: 104Grade Unit: ppmContained Metal: 88600Contained Unit: tView all details
Link to this fact

Identity

Project
Mkanda
Commodity
monazite
Region
malawi
Reported Region
Malawi
Ticker
FUN

Resource scope

Estimate type
resource
Effective date
2026-11-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Stockwell
Resource group id
resource:8c259f94ef859f6c21ad
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
847900000
Grade
104
Grade Unit
ppm
Contained Metal
88600
Contained Unit
t
Cutoff Grade
0.4
Cutoff Unit
% rutile

Prior Estimate

Resource Date
2026-11-16

Lab

Laboratory
Scientific Services South Africa and Intertek-Genalysis Zambia

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-15T00:00:00.000Z

Reasoning: This is the first reported resource for monazite at Mkanda, introducing a new critical mineral component to the project, though it is entirely in the Inferred category and requires further validation.

Positive factors

  • Maiden resource estimate for monazite adds a new potential revenue stream.
  • Significant contained monazite tonnage.

Negative factors

  • All mineralisation is classified as Inferred.
  • Cautionary statement regarding recoverability and saleability.

Evidence · table

“104”

Context: 88,600

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMkanda · zirconTonnes: 694700000Grade: 338Grade Unit: ppmContained Metal: 234800Contained Unit: tView all details
Link to this fact

Identity

Project
Mkanda
Commodity
zircon
Region
malawi
Reported Region
Malawi
Ticker
FUN

Resource scope

Estimate type
resource
Effective date
2026-11-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Stockwell
Resource group id
resource:7f767a8cbd73ff368504
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
694700000
Grade
338
Grade Unit
ppm
Contained Metal
234800
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% rutile

Prior Estimate

Resource Date
2026-11-16

Lab

Laboratory
Scientific Services South Africa and Intertek-Genalysis Zambia

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-15T00:00:00.000Z

Reasoning: This is the first reported resource for zircon at Mkanda, adding significant potential value to the project, though it is entirely in the Inferred category and subject to further verification.

Positive factors

  • Maiden resource estimate for zircon adds a new potential revenue stream.
  • Large contained zircon tonnage.

Negative factors

  • All mineralisation is classified as Inferred.
  • Cautionary statement regarding recoverability and saleability.

Evidence · table

“338”

Context: 234,800

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMkanda · monaziteTonnes: 694700000Grade: 107Grade Unit: ppmContained Metal: 74100Contained Unit: tView all details
Link to this fact

Identity

Project
Mkanda
Commodity
monazite
Region
malawi
Reported Region
Malawi
Ticker
FUN

Resource scope

Estimate type
resource
Effective date
2026-11-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Stockwell
Resource group id
resource:7f767a8cbd73ff368504
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
694700000
Grade
107
Grade Unit
ppm
Contained Metal
74100
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% rutile

Prior Estimate

Resource Date
2026-11-16

Lab

Laboratory
Scientific Services South Africa and Intertek-Genalysis Zambia

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-15T00:00:00.000Z

Reasoning: This is the first reported resource for monazite at Mkanda, introducing a new critical mineral component to the project, though it is entirely in the Inferred category and requires further validation.

Positive factors

  • Maiden resource estimate for monazite adds a new potential revenue stream.
  • Significant contained monazite tonnage.

Negative factors

  • All mineralisation is classified as Inferred.
  • Cautionary statement regarding recoverability and saleability.

Evidence · table

“107”

Context: 74,100

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMkanda · zirconTonnes: 487900000Grade: 335Grade Unit: ppmContained Metal: 163500Contained Unit: tView all details
Link to this fact

Identity

Project
Mkanda
Commodity
zircon
Region
malawi
Reported Region
Malawi
Ticker
FUN

Resource scope

Estimate type
resource
Effective date
2026-11-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Stockwell
Resource group id
resource:fc83ea6ae6cc4ef7d799
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
487900000
Grade
335
Grade Unit
ppm
Contained Metal
163500
Contained Unit
t
Cutoff Grade
0.6
Cutoff Unit
% rutile

Prior Estimate

Resource Date
2026-11-16

Lab

Laboratory
Scientific Services South Africa and Intertek-Genalysis Zambia

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-15T00:00:00.000Z

Reasoning: This is the first reported resource for zircon at Mkanda, adding significant potential value to the project, though it is entirely in the Inferred category and subject to further verification.

Positive factors

  • Maiden resource estimate for zircon adds a new potential revenue stream.
  • Large contained zircon tonnage.

Negative factors

  • All mineralisation is classified as Inferred.
  • Cautionary statement regarding recoverability and saleability.

Evidence · table

“335”

Context: 163,500

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMkanda · monaziteTonnes: 487900000Grade: 110Grade Unit: ppmContained Metal: 53700Contained Unit: tView all details
Link to this fact

Identity

Project
Mkanda
Commodity
monazite
Region
malawi
Reported Region
Malawi
Ticker
FUN

Resource scope

Estimate type
resource
Effective date
2026-11-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Stockwell
Resource group id
resource:fc83ea6ae6cc4ef7d799
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
487900000
Grade
110
Grade Unit
ppm
Contained Metal
53700
Contained Unit
t
Cutoff Grade
0.6
Cutoff Unit
% rutile

Prior Estimate

Resource Date
2026-11-16

Lab

Laboratory
Scientific Services South Africa and Intertek-Genalysis Zambia

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-15T00:00:00.000Z

Reasoning: This is the first reported resource for monazite at Mkanda, introducing a new critical mineral component to the project, though it is entirely in the Inferred category and requires further validation.

Positive factors

  • Maiden resource estimate for monazite adds a new potential revenue stream.
  • Significant contained monazite tonnage.

Negative factors

  • All mineralisation is classified as Inferred.
  • Cautionary statement regarding recoverability and saleability.

Evidence · table

“110”

Context: 53,700

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMkanda · zirconTonnes: 292500000Grade: 333Grade Unit: ppmContained Metal: 97400Contained Unit: tView all details
Link to this fact

Identity

Project
Mkanda
Commodity
zircon
Region
malawi
Reported Region
Malawi
Ticker
FUN

Resource scope

Estimate type
resource
Effective date
2026-11-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Stockwell
Resource group id
resource:aadf64c19533fcb46053
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
292500000
Grade
333
Grade Unit
ppm
Contained Metal
97400
Contained Unit
t
Cutoff Grade
0.7
Cutoff Unit
% rutile

Prior Estimate

Resource Date
2026-11-16

Lab

Laboratory
Scientific Services South Africa and Intertek-Genalysis Zambia

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-15T00:00:00.000Z

Reasoning: This is the first reported resource for zircon at Mkanda, adding significant potential value to the project, though it is entirely in the Inferred category and subject to further verification.

Positive factors

  • Maiden resource estimate for zircon adds a new potential revenue stream.
  • Large contained zircon tonnage.

Negative factors

  • All mineralisation is classified as Inferred.
  • Cautionary statement regarding recoverability and saleability.

Evidence · table

“333”

Context: 97,400

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMkanda · monaziteTonnes: 292500000Grade: 116Grade Unit: ppmContained Metal: 34100Contained Unit: tView all details
Link to this fact

Identity

Project
Mkanda
Commodity
monazite
Region
malawi
Reported Region
Malawi
Ticker
FUN

Resource scope

Estimate type
resource
Effective date
2026-11-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Stockwell
Resource group id
resource:aadf64c19533fcb46053
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
292500000
Grade
116
Grade Unit
ppm
Contained Metal
34100
Contained Unit
t
Cutoff Grade
0.7
Cutoff Unit
% rutile

Prior Estimate

Resource Date
2026-11-16

Lab

Laboratory
Scientific Services South Africa and Intertek-Genalysis Zambia

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-15T00:00:00.000Z

Reasoning: This is the first reported resource for monazite at Mkanda, introducing a new critical mineral component to the project, though it is entirely in the Inferred category and requires further validation.

Positive factors

  • Maiden resource estimate for monazite adds a new potential revenue stream.
  • Significant contained monazite tonnage.

Negative factors

  • All mineralisation is classified as Inferred.
  • Cautionary statement regarding recoverability and saleability.

Evidence · table

“116”

Context: 34,100

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMkanda · zirconTonnes: 151100000Grade: 341Grade Unit: ppmContained Metal: 51500Contained Unit: tView all details
Link to this fact

Identity

Project
Mkanda
Commodity
zircon
Region
malawi
Reported Region
Malawi
Ticker
FUN

Resource scope

Estimate type
resource
Effective date
2026-11-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Stockwell
Resource group id
resource:853ce9a58f82c235b9e1
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
151100000
Grade
341
Grade Unit
ppm
Contained Metal
51500
Contained Unit
t
Cutoff Grade
0.8
Cutoff Unit
% rutile

Prior Estimate

Resource Date
2026-11-16

Lab

Laboratory
Scientific Services South Africa and Intertek-Genalysis Zambia

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-15T00:00:00.000Z

Reasoning: This is the first reported resource for zircon at Mkanda, adding significant potential value to the project, though it is entirely in the Inferred category and subject to further verification.

Positive factors

  • Maiden resource estimate for zircon adds a new potential revenue stream.
  • Large contained zircon tonnage.

Negative factors

  • All mineralisation is classified as Inferred.
  • Cautionary statement regarding recoverability and saleability.

Evidence · table

“341”

Context: 51,500

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMkanda · monaziteTonnes: 151100000Grade: 123Grade Unit: ppmContained Metal: 18500Contained Unit: tView all details
Link to this fact

Identity

Project
Mkanda
Commodity
monazite
Region
malawi
Reported Region
Malawi
Ticker
FUN

Resource scope

Estimate type
resource
Effective date
2026-11-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Stockwell
Resource group id
resource:853ce9a58f82c235b9e1
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
151100000
Grade
123
Grade Unit
ppm
Contained Metal
18500
Contained Unit
t
Cutoff Grade
0.8
Cutoff Unit
% rutile

Prior Estimate

Resource Date
2026-11-16

Lab

Laboratory
Scientific Services South Africa and Intertek-Genalysis Zambia

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-15T00:00:00.000Z

Reasoning: This is the first reported resource for monazite at Mkanda, introducing a new critical mineral component to the project, though it is entirely in the Inferred category and requires further validation.

Positive factors

  • Maiden resource estimate for monazite adds a new potential revenue stream.
  • Significant contained monazite tonnage.

Negative factors

  • All mineralisation is classified as Inferred.
  • Cautionary statement regarding recoverability and saleability.

Evidence · table

“123”

Context: 18,500

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMkanda · zirconTonnes: 84200000Grade: 357Grade Unit: ppmContained Metal: 30100Contained Unit: tView all details
Link to this fact

Identity

Project
Mkanda
Commodity
zircon
Region
malawi
Reported Region
Malawi
Ticker
FUN

Resource scope

Estimate type
resource
Effective date
2026-11-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Stockwell
Resource group id
resource:0b46001955bb3a32fff4
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
84200000
Grade
357
Grade Unit
ppm
Contained Metal
30100
Contained Unit
t
Cutoff Grade
0.9
Cutoff Unit
% rutile

Prior Estimate

Resource Date
2026-11-16

Lab

Laboratory
Scientific Services South Africa and Intertek-Genalysis Zambia

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-15T00:00:00.000Z

Reasoning: This is the first reported resource for zircon at Mkanda, adding significant potential value to the project, though it is entirely in the Inferred category and subject to further verification.

Positive factors

  • Maiden resource estimate for zircon adds a new potential revenue stream.
  • Large contained zircon tonnage.

Negative factors

  • All mineralisation is classified as Inferred.
  • Cautionary statement regarding recoverability and saleability.

Evidence · table

“357”

Context: 30,100

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMkanda · monaziteTonnes: 84200000Grade: 129Grade Unit: ppmContained Metal: 10900Contained Unit: tView all details
Link to this fact

Identity

Project
Mkanda
Commodity
monazite
Region
malawi
Reported Region
Malawi
Ticker
FUN

Resource scope

Estimate type
resource
Effective date
2026-11-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Stockwell
Resource group id
resource:0b46001955bb3a32fff4
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
84200000
Grade
129
Grade Unit
ppm
Contained Metal
10900
Contained Unit
t
Cutoff Grade
0.9
Cutoff Unit
% rutile

Prior Estimate

Resource Date
2026-11-16

Lab

Laboratory
Scientific Services South Africa and Intertek-Genalysis Zambia

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-15T00:00:00.000Z

Reasoning: This is the first reported resource for monazite at Mkanda, introducing a new critical mineral component to the project, though it is entirely in the Inferred category and requires further validation.

Positive factors

  • Maiden resource estimate for monazite adds a new potential revenue stream.
  • Significant contained monazite tonnage.

Negative factors

  • All mineralisation is classified as Inferred.
  • Cautionary statement regarding recoverability and saleability.

Evidence · table

“129”

Context: 10,900

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMkanda · zirconTonnes: 46900000Grade: 388Grade Unit: ppmContained Metal: 18200Contained Unit: tView all details
Link to this fact

Identity

Project
Mkanda
Commodity
zircon
Region
malawi
Reported Region
Malawi
Ticker
FUN

Resource scope

Estimate type
resource
Effective date
2026-11-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Stockwell
Resource group id
resource:f309dd8031df2e3b0f5d
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
46900000
Grade
388
Grade Unit
ppm
Contained Metal
18200
Contained Unit
t
Cutoff Grade
1
Cutoff Unit
% rutile

Prior Estimate

Resource Date
2026-11-16

Lab

Laboratory
Scientific Services South Africa and Intertek-Genalysis Zambia

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-15T00:00:00.000Z

Reasoning: This is the first reported resource for zircon at Mkanda, adding significant potential value to the project, though it is entirely in the Inferred category and subject to further verification.

Positive factors

  • Maiden resource estimate for zircon adds a new potential revenue stream.
  • Large contained zircon tonnage.

Negative factors

  • All mineralisation is classified as Inferred.
  • Cautionary statement regarding recoverability and saleability.

Evidence · table

“388”

Context: 18,200

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMkanda · monaziteTonnes: 46900000Grade: 139Grade Unit: ppmContained Metal: 6500Contained Unit: tView all details
Link to this fact

Identity

Project
Mkanda
Commodity
monazite
Region
malawi
Reported Region
Malawi
Ticker
FUN

Resource scope

Estimate type
resource
Effective date
2026-11-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Stockwell
Resource group id
resource:f309dd8031df2e3b0f5d
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
46900000
Grade
139
Grade Unit
ppm
Contained Metal
6500
Contained Unit
t
Cutoff Grade
1
Cutoff Unit
% rutile

Prior Estimate

Resource Date
2026-11-16

Lab

Laboratory
Scientific Services South Africa and Intertek-Genalysis Zambia

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-15T00:00:00.000Z

Reasoning: This is the first reported resource for monazite at Mkanda, introducing a new critical mineral component to the project, though it is entirely in the Inferred category and requires further validation.

Positive factors

  • Maiden resource estimate for monazite adds a new potential revenue stream.
  • Significant contained monazite tonnage.

Negative factors

  • All mineralisation is classified as Inferred.
  • Cautionary statement regarding recoverability and saleability.

Evidence · table

“139”

Context: 6,500

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMkanda · rutileTonnes: 847900000Grade: 0.66Grade Unit: %Contained Metal: 5.63Contained Unit: mtView all details
Link to this fact

Identity

Project
Mkanda
Commodity
rutile
Region
malawi
Reported Region
Malawi
Ticker
FUN

Resource scope

Estimate type
resource
Effective date
2026-11-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Stockwell
Resource group id
resource:8c259f94ef859f6c21ad
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
847900000
Grade
0.66
Grade Unit
%
Contained Metal
5.63
Contained Unit
mt
Cutoff Grade
0.4
Cutoff Unit
%

Prior Estimate

Resource Date
2026-11-16
Prior Tonnes
697000000
Prior Grade
0.7
Prior Contained Metal
4.85

Lab

Laboratory
Scientific Services South Africa and Intertek-Genalysis Zambia

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-15T00:00:00.000Z

Reasoning: The rutile resource at 0.4% cut-off shows a substantial tonnage increase but a decrease in grade compared to the prior estimate, resulting in overall contained metal growth.

Positive factors

  • Significant tonnage increase compared to prior estimate.
  • Large contained rutile metal.

Negative factors

  • Grade decreased compared to prior estimate.
  • All mineralisation is classified as Inferred.

Evidence · table

“0.66”

Context: 5.63

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Tonnage Growthpositive

Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.

Why it applies: 847900000 against 697000000 previously

Grade Declinenegative

Average grade dropped >5% vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.

Why it applies: 0.66 against 0.7 previously

Contained Metal Growthpositive

True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: 5.63 against 4.85 previously

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMkanda · graphiteTonnes: 847900000Grade: 1.16Grade Unit: %Contained Metal: 9.81Contained Unit: mtView all details
Link to this fact

Identity

Project
Mkanda
Commodity
graphite
Region
malawi
Reported Region
Malawi
Ticker
FUN

Resource scope

Estimate type
resource
Effective date
2026-11-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Stockwell
Resource group id
resource:8c259f94ef859f6c21ad
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
847900000
Grade
1.16
Grade Unit
%
Contained Metal
9.81
Contained Unit
mt
Cutoff Grade
0.4
Cutoff Unit
% rutile

Prior Estimate

Resource Date
2026-11-16
Prior Tonnes
697000000
Prior Grade
1.04
Prior Contained Metal
7.27

Lab

Laboratory
Scientific Services South Africa and Intertek-Genalysis Zambia

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-15T00:00:00.000Z

Reasoning: The graphite resource at 0.4% rutile cut-off shows substantial growth in both tonnage and grade, leading to a significant increase in contained metal compared to the prior estimate.

Positive factors

  • Significant tonnage increase compared to prior estimate.
  • Grade increased compared to prior estimate.
  • Large contained graphite metal.

Negative factors

  • All mineralisation is classified as Inferred.

Evidence · table

“1.16”

Context: 9.81

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Tonnage Growthpositive

Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.

Why it applies: 847900000 against 697000000 previously

Grade Improvementpositive

Average resource grade improved vs prior estimate — better deposit economics.

Why it applies: 1.16 against 1.04 previously

Contained Metal Growthpositive

True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: 9.81 against 7.27 previously

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMkanda · rutileTonnes: 694700000Grade: 0.71Grade Unit: %Contained Metal: 4.93Contained Unit: mtView all details
Link to this fact

Identity

Project
Mkanda
Commodity
rutile
Region
malawi
Reported Region
Malawi
Ticker
FUN

Resource scope

Estimate type
resource
Effective date
2026-11-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Stockwell
Resource group id
resource:7f767a8cbd73ff368504
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
694700000
Grade
0.71
Grade Unit
%
Contained Metal
4.93
Contained Unit
mt
Cutoff Grade
0.5
Cutoff Unit
%

Prior Estimate

Resource Date
2026-11-16
Prior Tonnes
602000000
Prior Grade
0.73
Prior Contained Metal
4.43

Lab

Laboratory
Scientific Services South Africa and Intertek-Genalysis Zambia

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-15T00:00:00.000Z

Reasoning: The rutile resource at 0.5% cut-off shows tonnage and contained metal growth, but with a slight decrease in grade compared to the prior estimate.

Positive factors

  • Tonnage increased compared to prior estimate.
  • Contained rutile metal increased.

Negative factors

  • Grade decreased compared to prior estimate.
  • All mineralisation is classified as Inferred.

Evidence · table

“0.71”

Context: 4.93

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Tonnage Growthpositive

Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.

Why it applies: 694700000 against 602000000 previously

Contained Metal Growthpositive

True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: 4.93 against 4.43 previously

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMkanda · graphiteTonnes: 694700000Grade: 1.23Grade Unit: %Contained Metal: 8.52Contained Unit: mtView all details
Link to this fact

Identity

Project
Mkanda
Commodity
graphite
Region
malawi
Reported Region
Malawi
Ticker
FUN

Resource scope

Estimate type
resource
Effective date
2026-11-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Stockwell
Resource group id
resource:7f767a8cbd73ff368504
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
694700000
Grade
1.23
Grade Unit
%
Contained Metal
8.52
Contained Unit
mt
Cutoff Grade
0.5
Cutoff Unit
% rutile

Prior Estimate

Resource Date
2026-11-16
Prior Tonnes
602000000
Prior Grade
1.09
Prior Contained Metal
6.59

Lab

Laboratory
Scientific Services South Africa and Intertek-Genalysis Zambia

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-15T00:00:00.000Z

Reasoning: The graphite resource at 0.5% rutile cut-off shows growth in tonnage, grade, and contained metal compared to the prior estimate.

Positive factors

  • Tonnage increased compared to prior estimate.
  • Grade increased compared to prior estimate.
  • Contained graphite metal increased.

Negative factors

  • All mineralisation is classified as Inferred.

Evidence · table

“1.23”

Context: 8.52

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Tonnage Growthpositive

Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.

Why it applies: 694700000 against 602000000 previously

Grade Improvementpositive

Average resource grade improved vs prior estimate — better deposit economics.

Why it applies: 1.23 against 1.09 previously

Contained Metal Growthpositive

True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: 8.52 against 6.59 previously

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMkanda · rutileTonnes: 487900000Grade: 0.78Grade Unit: %Contained Metal: 3.79Contained Unit: mtView all details
Link to this fact

Identity

Project
Mkanda
Commodity
rutile
Region
malawi
Reported Region
Malawi
Ticker
FUN

Resource scope

Estimate type
resource
Effective date
2026-11-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Stockwell
Resource group id
resource:fc83ea6ae6cc4ef7d799
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
487900000
Grade
0.78
Grade Unit
%
Contained Metal
3.79
Contained Unit
mt
Cutoff Grade
0.6
Cutoff Unit
%

Prior Estimate

Resource Date
2026-11-16
Prior Tonnes
457000000
Prior Grade
0.79
Prior Contained Metal
3.62

Lab

Laboratory
Scientific Services South Africa and Intertek-Genalysis Zambia

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-15T00:00:00.000Z

Reasoning: The rutile resource at 0.6% cut-off shows a modest increase in tonnage and contained metal, with a slight grade decrease compared to the prior estimate.

Positive factors

  • Tonnage increased compared to prior estimate.
  • Contained rutile metal increased.

Negative factors

  • Grade slightly decreased compared to prior estimate.
  • All mineralisation is classified as Inferred.

Evidence · table

“0.78”

Context: 3.79

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Dilutive Growthnegative

Tonnage increased but contained metal flat or down — likely from lower cut-off grade, not geological expansion.

Why it applies: tonnage rose while contained metal went 3.79 from 3.62

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMkanda · graphiteTonnes: 487900000Grade: 1.3Grade Unit: %Contained Metal: 6.35Contained Unit: mtView all details
Link to this fact

Identity

Project
Mkanda
Commodity
graphite
Region
malawi
Reported Region
Malawi
Ticker
FUN

Resource scope

Estimate type
resource
Effective date
2026-11-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Stockwell
Resource group id
resource:fc83ea6ae6cc4ef7d799
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
487900000
Grade
1.3
Grade Unit
%
Contained Metal
6.35
Contained Unit
mt
Cutoff Grade
0.6
Cutoff Unit
% rutile

Prior Estimate

Resource Date
2026-11-16
Prior Tonnes
457000000
Prior Grade
1.15
Prior Contained Metal
5.27

Lab

Laboratory
Scientific Services South Africa and Intertek-Genalysis Zambia

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-15T00:00:00.000Z

Reasoning: The graphite resource at 0.6% rutile cut-off shows growth in tonnage, grade, and contained metal compared to the prior estimate.

Positive factors

  • Tonnage increased compared to prior estimate.
  • Grade increased compared to prior estimate.
  • Contained graphite metal increased.

Negative factors

  • All mineralisation is classified as Inferred.

Evidence · table

“1.30”

Context: 6.35

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Grade Improvementpositive

Average resource grade improved vs prior estimate — better deposit economics.

Why it applies: 1.3 against 1.15 previously

Contained Metal Growthpositive

True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: 6.35 against 5.27 previously

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMkanda · rutileTonnes: 292500000Grade: 0.86Grade Unit: %Contained Metal: 2.53Contained Unit: mtView all details
Link to this fact

Identity

Project
Mkanda
Commodity
rutile
Region
malawi
Reported Region
Malawi
Ticker
FUN

Resource scope

Estimate type
resource
Effective date
2026-11-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Stockwell
Resource group id
resource:aadf64c19533fcb46053
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
292500000
Grade
0.86
Grade Unit
%
Contained Metal
2.53
Contained Unit
mt
Cutoff Grade
0.7
Cutoff Unit
%

Prior Estimate

Resource Date
2026-11-16
Prior Tonnes
298000000
Prior Grade
0.87
Prior Contained Metal
2.59

Lab

Laboratory
Scientific Services South Africa and Intertek-Genalysis Zambia

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-15T00:00:00.000Z

Reasoning: The rutile resource at the principal 0.7% cut-off shows a slight decrease in tonnage, grade, and contained metal compared to the prior estimate.

Negative factors

  • Tonnage decreased compared to prior estimate.
  • Grade decreased compared to prior estimate.
  • Contained rutile metal decreased compared to prior estimate.
  • All mineralisation is classified as Inferred.

Evidence · table

“0.86”

Context: 2.53

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: 292500000 against 298000000 previously

Contained Metal Declinenegative

Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.

Why it applies: 2.53 against 2.59 previously

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMkanda · graphiteTonnes: 292500000Grade: 1.35Grade Unit: %Contained Metal: 3.95Contained Unit: mtView all details
Link to this fact

Identity

Project
Mkanda
Commodity
graphite
Region
malawi
Reported Region
Malawi
Ticker
FUN

Resource scope

Estimate type
resource
Effective date
2026-11-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Stockwell
Resource group id
resource:aadf64c19533fcb46053
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
292500000
Grade
1.35
Grade Unit
%
Contained Metal
3.95
Contained Unit
mt
Cutoff Grade
0.7
Cutoff Unit
% rutile

Prior Estimate

Resource Date
2026-11-16
Prior Tonnes
298000000
Prior Grade
1.19
Prior Contained Metal
3.55

Lab

Laboratory
Scientific Services South Africa and Intertek-Genalysis Zambia

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-15T00:00:00.000Z

Reasoning: The graphite resource at 0.7% rutile cut-off shows improved grade and contained metal, despite a slight tonnage decrease compared to the prior estimate.

Positive factors

  • Grade increased compared to prior estimate.
  • Contained graphite metal increased compared to prior estimate.

Negative factors

  • Tonnage slightly decreased compared to prior estimate.
  • All mineralisation is classified as Inferred.

Evidence · table

“1.35”

Context: 3.95

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: 292500000 against 298000000 previously

Grade Improvementpositive

Average resource grade improved vs prior estimate — better deposit economics.

Why it applies: 1.35 against 1.19 previously

Contained Metal Growthpositive

True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: 3.95 against 3.55 previously

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMkanda · rutileTonnes: 151100000Grade: 0.98Grade Unit: %Contained Metal: 1.47Contained Unit: mtView all details
Link to this fact

Identity

Project
Mkanda
Commodity
rutile
Region
malawi
Reported Region
Malawi
Ticker
FUN

Resource scope

Estimate type
resource
Effective date
2026-11-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Stockwell
Resource group id
resource:853ce9a58f82c235b9e1
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
151100000
Grade
0.98
Grade Unit
%
Contained Metal
1.47
Contained Unit
mt
Cutoff Grade
0.8
Cutoff Unit
%

Prior Estimate

Resource Date
2026-11-16
Prior Tonnes
159000000
Prior Grade
0.98
Prior Contained Metal
1.56

Lab

Laboratory
Scientific Services South Africa and Intertek-Genalysis Zambia

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-15T00:00:00.000Z

Reasoning: The rutile resource at 0.8% cut-off shows a decrease in tonnage and contained metal, with grade remaining flat compared to the prior estimate.

Negative factors

  • Tonnage decreased compared to prior estimate.
  • Contained rutile metal decreased compared to prior estimate.
  • All mineralisation is classified as Inferred.

Evidence · table

“0.98”

Context: 1.47

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: 151100000 against 159000000 previously

Contained Metal Declinenegative

Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.

Why it applies: 1.47 against 1.56 previously

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMkanda · graphiteTonnes: 151100000Grade: 1.28Grade Unit: %Contained Metal: 1.94Contained Unit: mtView all details
Link to this fact

Identity

Project
Mkanda
Commodity
graphite
Region
malawi
Reported Region
Malawi
Ticker
FUN

Resource scope

Estimate type
resource
Effective date
2026-11-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Stockwell
Resource group id
resource:853ce9a58f82c235b9e1
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
151100000
Grade
1.28
Grade Unit
%
Contained Metal
1.94
Contained Unit
mt
Cutoff Grade
0.8
Cutoff Unit
% rutile

Prior Estimate

Resource Date
2026-11-16
Prior Tonnes
159000000
Prior Grade
1.11
Prior Contained Metal
1.78

Lab

Laboratory
Scientific Services South Africa and Intertek-Genalysis Zambia

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-15T00:00:00.000Z

Reasoning: The graphite resource at 0.8% rutile cut-off shows improved grade and contained metal, despite a tonnage decrease compared to the prior estimate.

Positive factors

  • Grade increased compared to prior estimate.
  • Contained graphite metal increased compared to prior estimate.

Negative factors

  • Tonnage decreased compared to prior estimate.
  • All mineralisation is classified as Inferred.

Evidence · table

“1.28”

Context: 1.94

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: 151100000 against 159000000 previously

Grade Improvementpositive

Average resource grade improved vs prior estimate — better deposit economics.

Why it applies: 1.28 against 1.11 previously

Contained Metal Growthpositive

True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: 1.94 against 1.78 previously

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMkanda · rutileTonnes: 84200000Grade: 1.08Grade Unit: %Contained Metal: 0.91Contained Unit: mtView all details
Link to this fact

Identity

Project
Mkanda
Commodity
rutile
Region
malawi
Reported Region
Malawi
Ticker
FUN

Resource scope

Estimate type
resource
Effective date
2026-11-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Stockwell
Resource group id
resource:0b46001955bb3a32fff4
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
84200000
Grade
1.08
Grade Unit
%
Contained Metal
0.91
Contained Unit
mt
Cutoff Grade
0.9
Cutoff Unit
%

Prior Estimate

Resource Date
2026-11-16
Prior Tonnes
87000000
Prior Grade
1.09
Prior Contained Metal
0.94

Lab

Laboratory
Scientific Services South Africa and Intertek-Genalysis Zambia

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-15T00:00:00.000Z

Reasoning: The rutile resource at 0.9% cut-off shows a decrease in tonnage, grade, and contained metal compared to the prior estimate.

Negative factors

  • Tonnage decreased compared to prior estimate.
  • Grade decreased compared to prior estimate.
  • Contained rutile metal decreased compared to prior estimate.
  • All mineralisation is classified as Inferred.

Evidence · table

“1.08”

Context: 0.91

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: 84200000 against 87000000 previously

Contained Metal Declinenegative

Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.

Why it applies: 0.91 against 0.94 previously

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMkanda · graphiteTonnes: 84200000Grade: 1.28Grade Unit: %Contained Metal: 1.07Contained Unit: mtView all details
Link to this fact

Identity

Project
Mkanda
Commodity
graphite
Region
malawi
Reported Region
Malawi
Ticker
FUN

Resource scope

Estimate type
resource
Effective date
2026-11-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Stockwell
Resource group id
resource:0b46001955bb3a32fff4
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
84200000
Grade
1.28
Grade Unit
%
Contained Metal
1.07
Contained Unit
mt
Cutoff Grade
0.9
Cutoff Unit
% rutile

Prior Estimate

Resource Date
2026-11-16
Prior Tonnes
87000000
Prior Grade
1.04
Prior Contained Metal
0.91

Lab

Laboratory
Scientific Services South Africa and Intertek-Genalysis Zambia

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-15T00:00:00.000Z

Reasoning: The graphite resource at 0.9% rutile cut-off shows improved grade and contained metal, despite a tonnage decrease compared to the prior estimate.

Positive factors

  • Grade increased compared to prior estimate.
  • Contained graphite metal increased compared to prior estimate.

Negative factors

  • Tonnage decreased compared to prior estimate.
  • All mineralisation is classified as Inferred.

Evidence · table

“1.28”

Context: 1.07

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: 84200000 against 87000000 previously

Grade Improvementpositive

Average resource grade improved vs prior estimate — better deposit economics.

Why it applies: 1.28 against 1.04 previously

Contained Metal Growthpositive

True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: 1.07 against 0.91 previously

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMkanda · rutileTonnes: 46900000Grade: 1.19Grade Unit: %Contained Metal: 0.56Contained Unit: mtView all details
Link to this fact

Identity

Project
Mkanda
Commodity
rutile
Region
malawi
Reported Region
Malawi
Ticker
FUN

Resource scope

Estimate type
resource
Effective date
2026-11-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Stockwell
Resource group id
resource:f309dd8031df2e3b0f5d
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
46900000
Grade
1.19
Grade Unit
%
Contained Metal
0.56
Contained Unit
mt
Cutoff Grade
1
Cutoff Unit
%

Prior Estimate

Resource Date
2026-11-16
Prior Tonnes
51000000
Prior Grade
1.19
Prior Contained Metal
0.6

Lab

Laboratory
Scientific Services South Africa and Intertek-Genalysis Zambia

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-15T00:00:00.000Z

Reasoning: The rutile resource at 1.0% cut-off shows a decrease in tonnage and contained metal, with grade remaining flat compared to the prior estimate.

Negative factors

  • Tonnage decreased compared to prior estimate.
  • Contained rutile metal decreased compared to prior estimate.
  • All mineralisation is classified as Inferred.

Evidence · table

“1.19”

Context: 0.56

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: 46900000 against 51000000 previously

Contained Metal Declinenegative

Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.

Why it applies: 0.56 against 0.6 previously

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMkanda · graphiteTonnes: 46900000Grade: 1.23Grade Unit: %Contained Metal: 0.58Contained Unit: mtView all details
Link to this fact

Identity

Project
Mkanda
Commodity
graphite
Region
malawi
Reported Region
Malawi
Ticker
FUN

Resource scope

Estimate type
resource
Effective date
2026-11-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Stockwell
Resource group id
resource:f309dd8031df2e3b0f5d
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
46900000
Grade
1.23
Grade Unit
%
Contained Metal
0.58
Contained Unit
mt
Cutoff Grade
1
Cutoff Unit
% rutile

Prior Estimate

Resource Date
2026-11-16
Prior Tonnes
51000000
Prior Grade
1.04
Prior Contained Metal
0.52

Lab

Laboratory
Scientific Services South Africa and Intertek-Genalysis Zambia

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-15T00:00:00.000Z

Reasoning: The graphite resource at 1.0% rutile cut-off shows improved grade and contained metal, despite a tonnage decrease compared to the prior estimate.

Positive factors

  • Grade increased compared to prior estimate.
  • Contained graphite metal increased compared to prior estimate.

Negative factors

  • Tonnage decreased compared to prior estimate.
  • All mineralisation is classified as Inferred.

Evidence · table

“1.23”

Context: 0.58

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: 46900000 against 51000000 previously

Grade Improvementpositive

Average resource grade improved vs prior estimate — better deposit economics.

Why it applies: 1.23 against 1.04 previously

Contained Metal Growthpositive

True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: 0.58 against 0.52 previously

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.