FRS: British Hill MRE Continues Growth Beyond 285,000oz

Original announcement by asx on

Company
Forrestania Resources Limited
Ticker
FRS
Exchange
ASX
Region
Western Australia
Primary commodity
Unavailable
Secondary commodities
None reported
Document categories
Resource update
Extracted
2026-11-08 22:16:28 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Forrestania Resources has updated its British Hill Mineral Resource Estimate, reporting a 35% increase in total gold resource to 5.64Mt @ 1.58 g/t Au (286,300oz). The update is driven by 19 additional RC drill holes, which also resulted in a 45% increase in the Indicated resource component.

Reasoning: Significant growth in both total resource and higher-confidence Indicated category following new drilling.

Positive factors

  • 35% increase in total tonnage
  • 45% increase in Indicated resource tonnage
  • Indicated category now accounts for 70% of contained ounces
  • Grade maintained at 1.58 g/t Au

Facts used in scoring: 4

Atlas analysis — Forrestania Resources Limited: FRS: British Hill MRE Continues Growth Beyond 285,000oz. indicated 3860000 tonnes; inferred 1780000 tonnes;  5640000 tonnes

Classification and evidence

Tonnage Growthpositive

Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.

Why it applies: Total resource tonnage increased by 35% compared to the previous MRE.

Evidence · text

“MRE update represents a 35% increase”

Category Upgradepositive

Resource confidence improved — Inferred upgraded to Indicated, or Indicated to Measured. De-risking signal.

Why it applies: Indicated resource tonnage increased by 45% compared to the previous MRE.

Evidence · text

“representing a 45% increase in higher-confidence Indicated Mineral Resources”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: Mr Lynn Widenbar, a Competent Person, is named and responsible for the estimate.

Evidence · text

“based on information compiled by Mr Lynn Widenbar, a Competent Person”

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The resource estimate is prepared in accordance with the 2012 JORC Code.

Evidence · text

“JORC-compliant Mineral Resource Estimate”

Extracted facts

Stored fact records: 4. Some facts used in scoring do not have a stored record.

Resource Estimates (4)

indicatedbritish hill · goldTonnes: 3860000Grade: 0.5Grade Unit: g/tContained Metal: 199800Contained Unit: ozView all details
Link to this fact

Identity

Project
british hill
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
FRS

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lynn Widenbar
Resource group id
resource:38ce8f7dd8f9806b8379
Deposit or zone
British Hill
Mining method
open_pit
Material type
mixed
Ownership percent
100 %
Resource basis
gross

Resource Data

Category
indicated
Tonnes
3860000
Grade
0.5
Grade Unit
g/t
Contained Metal
199800
Contained Unit
oz
Cutoff Grade
0.5
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-11-09

Lab

Laboratory
Nagrom

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: Strong growth in high-confidence category.

Positive factors

  • 45% increase in Indicated resource from previous MRE

Evidence · table

“0.5”

Context: 3,860,000

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

inferredbritish hill · goldTonnes: 1780000Grade: 0.5Grade Unit: g/tContained Metal: 86500Contained Unit: ozView all details
Link to this fact

Identity

Project
british hill
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
FRS

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lynn Widenbar
Resource group id
resource:94c3522608ddb9f58ef5
Deposit or zone
British Hill
Mining method
open_pit
Material type
mixed
Ownership percent
100 %
Resource basis
gross

Resource Data

Category
inferred
Tonnes
1780000
Grade
0.5
Grade Unit
g/t
Contained Metal
86500
Contained Unit
oz
Cutoff Grade
0.5
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-11-09

Lab

Laboratory
Nagrom

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: Standard inferred resource component.

Positive factors

  • Contributes to total resource growth

Evidence · table

“0.5”

Context: 1,780,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

British Hillbritish hill · goldTonnes: 5640000Grade: 1.58Grade Unit: g/tContained Metal: 286300Contained Unit: ozView all details
Link to this fact

Identity

Project
british hill
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
FRS

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lynn Widenbar
Resource group id
resource:a00c2ace5ad01d1446fc
Deposit or zone
British Hill
Mining method
open_pit
Material type
mixed
Ownership percent
100 %
Resource basis
gross

Resource Data

Tonnes
5640000
Grade
1.58
Grade Unit
g/t
Contained Metal
286300
Contained Unit
oz
Cutoff Grade
0.5
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-11-09

Lab

Laboratory
Nagrom

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: Significant overall resource expansion.

Positive factors

  • 35% increase in total tonnage
  • Total ounces exceed 285,000

Evidence · table

“5,640,000”

Context: 5,640,000

Tags used in scoring

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

inferredbritish hill · goldTonnes: 5640000Grade: 0.5Grade Unit: g/tView all details
Link to this fact

Identity

Project
british hill
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
FRS

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lynn Widenbar
Resource group id
resource:eb504ff258d8bcd386eb
Mining method
open_pit
Ownership percent
100 %
Resource basis
gross

Resource Data

Category
inferred
Tonnes
5640000
Grade
0.5
Grade Unit
g/t
Cutoff Grade
0.5
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-11-09

Lab

Laboratory
Nagrom

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: Standard inferred resource component. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Contributes to total resource growth

Evidence · table

“0.5”

Context: 5,640,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.