FEG: Woyla Maiden JORC Mineral Resource

Original announcement by asx on

Company
Far East Gold Ltd
Ticker
FEG
Exchange
ASX
Region
Aceh Province, Sumatra, Indonesia
Primary commodity
Unavailable
Secondary commodities
None reported
Document categories
Resource update
Extracted
2026-11-16 22:16:21 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Far East Gold has announced a maiden JORC-compliant Mineral Resource Estimate for its Woyla Gold-Silver Project in Indonesia, totaling 19.4 Mt at 0.88 g/t AuEq for 549,000 ounces of gold equivalent. The estimate includes 441,000 oz gold and 7.2 Moz silver, with 27% of the contained AuEq classified as Indicated Mineral Resources. Metallurgical testwork indicates high gold and silver recoveries, but the project faces permitting challenges as it is located within a Protected Forest.

Reasoning: Far East Gold announced a maiden JORC-compliant Mineral Resource Estimate for its Woyla Gold-Silver Project, totaling 19.4 Mt at 0.88 g/t AuEq for 549,000 oz AuEq, with 27% in the Indicated category, establishing a significant new asset for the company. While the resource is substantial and supported by good metallurgy, a significant portion remains Inferred, and permitting for open-pit mining in a Protected Forest presents a material risk.

Positive factors

  • Maiden JORC-compliant Mineral Resource for the Woyla project
  • Significant contained metal of 549,000 oz AuEq
  • 27% of the resource is in the higher-confidence Indicated category
  • Good metallurgical recoveries of 90% for gold and 80% for silver
  • Potential for resource expansion from five undrilled prospects

Negative factors

  • Large proportion (73%) of the resource is in the Inferred category
  • Project located within Protected Forest, requiring reclassification for open-pit mining, posing a material permitting risk
  • High cyanide consumption noted in metallurgical testwork (4.7–4.9 kg/t NaCN)

Facts used in scoring: 20

Atlas analysis — Far East Gold Ltd: FEG: Woyla Maiden JORC Mineral Resource. indicated 4400000 tonnes; inferred 12200000 tonnes

Classification and evidence

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is the first formal Mineral Resource Estimate for the Woyla Gold–Silver Project, establishing a baseline for the project.

Evidence · text

“Far East Gold Ltd (FEG or the Company) is pleased to announce a maiden JORC (2012) Mineral Resource Estimate (MRE) for its Woyla Gold–Silver Project”

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The Mineral Resource Estimate has been prepared in accordance with the JORC Code (2012).

Evidence · text

“maiden JORC (2012) Mineral Resource Estimate (MRE)”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: Mr Michael Corey is named as the Competent Person responsible for the MRE.

Evidence · text

“Mr Michael Corey has reviewed the supporting data, estimation methodology and results and takes responsibility for the MRE as Competent Person.”

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The MRE includes 5.1 Mt at 0.92 g/t AuEq for 151,000 oz AuEq in the Indicated category, representing 27% of the contained AuEq.

Evidence · text

“Indicated Mineral Resources of 5.1 Mt at 0.92 g/t AuEq for 151,000 oz AuEq (125,000 oz Au) represent 27% of the contained AuEq.”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The MRE includes 14.3 Mt at 0.87 g/t AuEq for 398,000 oz AuEq in the Inferred category, which constitutes 73% of the total contained AuEq.

Evidence · table

“14.3”

Context: Inferred

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: The Mineral Resource is reported above a clearly stated cut-off grade of 0.15 g/t AuEq.

Evidence · text

“reported within optimised open-pit shells above a 0.15 g/t AuEq cut-off.”

Permitting Risknegative · Story-specific tag

No canonical definition is currently available.

Why it applies: All four deposits lie within Protected Forest, requiring reclassification to Production Forest for open-pit mining, which is considered a material risk.

Evidence · text

“All four deposits lie within Protected Forest (Hutan Lindung). Open-pit mining will require the relevant areas to be reclassified from Protected Forest to Production Forest”

Extracted facts

Stored fact records: 20. Some facts used in scoring do not have a stored record.

Resource Estimates (20)

indicatedWoyla Gold–Silver Project · goldTonnes: 4400000Grade: 0.64Grade Unit: g/tContained Metal: 90Contained Unit: kozView all details
Link to this fact

Identity

Project
Woyla Gold–Silver Project
Commodity
gold
Region
indonesia
Reported Region
Aceh Province, Sumatra, Indonesia
Ticker
FEG

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Michael Corey
Resource group id
resource:ef2bfd0e86b7e436415f
Deposit or zone
Rek Rinti–Agam
Mining method
open_pit
Ownership percent
51 %
Resource basis
gross

Resource Data

Category
indicated
Tonnes
4400000
Grade
0.64
Grade Unit
g/t
Contained Metal
90
Contained Unit
koz
Cutoff Grade
0.15
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2026-11-09

Metal Equivalent

Metal Eq. Grade
0.78
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: This Indicated resource for Rek Rinti–Agam contributes significantly to the maiden MRE, providing a solid confidence base for the project's cornerstone deposit.

Positive factors

  • Part of a maiden JORC resource
  • Indicated category provides higher confidence
  • Good contained gold for this deposit zone

Evidence · table

“0.64”

Context: 4.4

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedWoyla Gold–Silver Project · silverTonnes: 4400000Grade: 1.33Grade Unit: mozContained Metal: 1.33Contained Unit: mozView all details
Link to this fact

Identity

Project
Woyla Gold–Silver Project
Commodity
silver
Region
indonesia
Reported Region
Aceh Province, Sumatra, Indonesia
Ticker
FEG

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Michael Corey
Resource group id
resource:ef2bfd0e86b7e436415f
Deposit or zone
Rek Rinti–Agam
Mining method
open_pit
Ownership percent
51 %
Resource basis
gross

Resource Data

Category
indicated
Tonnes
4400000
Grade
1.33
Grade Unit
moz
Contained Metal
1.33
Contained Unit
moz
Cutoff Grade
0.15
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2026-11-09

Metal Equivalent

Metal Eq. Grade
0.78
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Indicated silver resource at Rek Rinti–Agam adds substantial byproduct value to the maiden estimate, contributing to the overall AuEq grade.

Positive factors

  • Significant silver contribution to the maiden MRE
  • Indicated category provides higher confidence

Evidence · table

“1.33”

Context: 4.4

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredWoyla Gold–Silver Project · goldTonnes: 12200000Grade: 0.64Grade Unit: g/tContained Metal: 253Contained Unit: kozView all details
Link to this fact

Identity

Project
Woyla Gold–Silver Project
Commodity
gold
Region
indonesia
Reported Region
Aceh Province, Sumatra, Indonesia
Ticker
FEG

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Michael Corey
Resource group id
resource:a289c28bc05a5535676f
Deposit or zone
Rek Rinti–Agam
Mining method
open_pit
Ownership percent
51 %
Resource basis
gross

Resource Data

Category
inferred
Tonnes
12200000
Grade
0.64
Grade Unit
g/t
Contained Metal
253
Contained Unit
koz
Cutoff Grade
0.15
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2026-11-09

Metal Equivalent

Metal Eq. Grade
0.82
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: This Inferred gold resource at Rek Rinti–Agam forms the bulk of the maiden MRE, indicating substantial potential but requiring further drilling to upgrade confidence.

Positive factors

  • Largest gold component of the maiden MRE
  • Provides significant scale to the project

Negative factors

  • Inferred category has lower geological confidence

Evidence · table

“0.64”

Context: 12.2

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredWoyla Gold–Silver Project · silverTonnes: 12200000Grade: 4.6Grade Unit: mozContained Metal: 4.6Contained Unit: mozView all details
Link to this fact

Identity

Project
Woyla Gold–Silver Project
Commodity
silver
Region
indonesia
Reported Region
Aceh Province, Sumatra, Indonesia
Ticker
FEG

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Michael Corey
Resource group id
resource:a289c28bc05a5535676f
Deposit or zone
Rek Rinti–Agam
Mining method
open_pit
Ownership percent
51 %
Resource basis
gross

Resource Data

Category
inferred
Tonnes
12200000
Grade
4.6
Grade Unit
moz
Contained Metal
4.6
Contained Unit
moz
Cutoff Grade
0.15
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2026-11-09

Metal Equivalent

Metal Eq. Grade
0.82
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Inferred silver resource at Rek Rinti–Agam provides substantial contained metal, contributing significantly to the overall project scale despite its lower confidence category.

Positive factors

  • Largest silver component of the maiden MRE
  • Adds significant byproduct value to the project

Negative factors

  • Inferred category has lower geological confidence

Evidence · table

“4.60”

Context: 12.2

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedWoyla Gold–Silver Project · goldTonnes: 300000Grade: 2.02Grade Unit: g/tContained Metal: 19Contained Unit: kozView all details
Link to this fact

Identity

Project
Woyla Gold–Silver Project
Commodity
gold
Region
indonesia
Reported Region
Aceh Province, Sumatra, Indonesia
Ticker
FEG

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Michael Corey
Resource group id
resource:4f7f0257139f3b78b49f
Deposit or zone
Aloe Rek
Mining method
open_pit
Ownership percent
51 %
Resource basis
gross

Resource Data

Category
indicated
Tonnes
300000
Grade
2.02
Grade Unit
g/t
Contained Metal
19
Contained Unit
koz
Cutoff Grade
0.15
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2026-11-09

Metal Equivalent

Metal Eq. Grade
2.12
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The high-grade Indicated gold core at Aloe Rek is a positive feature of the maiden MRE, demonstrating a valuable, higher-confidence zone within the project.

Positive factors

  • High-grade Indicated core for Aloe Rek
  • Provides strong confidence for this zone
  • Grade is well above project average

Evidence · table

“2.02”

Context: 0.3

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedWoyla Gold–Silver Project · silverTonnes: 300000Grade: 0.07Grade Unit: mozContained Metal: 0.07Contained Unit: mozView all details
Link to this fact

Identity

Project
Woyla Gold–Silver Project
Commodity
silver
Region
indonesia
Reported Region
Aceh Province, Sumatra, Indonesia
Ticker
FEG

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Michael Corey
Resource group id
resource:4f7f0257139f3b78b49f
Deposit or zone
Aloe Rek
Mining method
open_pit
Ownership percent
51 %
Resource basis
gross

Resource Data

Category
indicated
Tonnes
300000
Grade
0.07
Grade Unit
moz
Contained Metal
0.07
Contained Unit
moz
Cutoff Grade
0.15
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2026-11-09

Metal Equivalent

Metal Eq. Grade
2.12
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Indicated silver resource at Aloe Rek supports the high-grade nature of this zone within the maiden MRE.

Positive factors

  • Indicated silver resource for Aloe Rek
  • Contributes to the high AuEq grade of this zone

Evidence · table

“0.07”

Context: 0.3

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredWoyla Gold–Silver Project · goldTonnes: 1600000Grade: 0.89Grade Unit: g/tContained Metal: 47Contained Unit: kozView all details
Link to this fact

Identity

Project
Woyla Gold–Silver Project
Commodity
gold
Region
indonesia
Reported Region
Aceh Province, Sumatra, Indonesia
Ticker
FEG

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Michael Corey
Resource group id
resource:327634af90821f76c4bd
Deposit or zone
Aloe Rek
Mining method
open_pit
Ownership percent
51 %
Resource basis
gross

Resource Data

Category
inferred
Tonnes
1600000
Grade
0.89
Grade Unit
g/t
Contained Metal
47
Contained Unit
koz
Cutoff Grade
0.15
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2026-11-09

Metal Equivalent

Metal Eq. Grade
0.97
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Inferred gold resource at Aloe Rek contributes to the maiden MRE's overall scale, but its lower confidence category suggests further work is needed.

Positive factors

  • Adds to the overall gold inventory of the project

Negative factors

  • Inferred category has lower geological confidence

Evidence · table

“0.89”

Context: 1.6

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredWoyla Gold–Silver Project · silverTonnes: 1600000Grade: 0.26Grade Unit: mozContained Metal: 0.26Contained Unit: mozView all details
Link to this fact

Identity

Project
Woyla Gold–Silver Project
Commodity
silver
Region
indonesia
Reported Region
Aceh Province, Sumatra, Indonesia
Ticker
FEG

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Michael Corey
Resource group id
resource:327634af90821f76c4bd
Deposit or zone
Aloe Rek
Mining method
open_pit
Ownership percent
51 %
Resource basis
gross

Resource Data

Category
inferred
Tonnes
1600000
Grade
0.26
Grade Unit
moz
Contained Metal
0.26
Contained Unit
moz
Cutoff Grade
0.15
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2026-11-09

Metal Equivalent

Metal Eq. Grade
0.97
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Inferred silver resource at Aloe Rek contributes to the maiden MRE's overall scale, but its lower confidence category suggests further work is needed.

Positive factors

  • Adds to the overall silver inventory of the project

Negative factors

  • Inferred category has lower geological confidence

Evidence · table

“0.26”

Context: 1.6

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedWoyla Gold–Silver Project · goldTonnes: 200000Grade: 1.25Grade Unit: g/tContained Metal: 8Contained Unit: kozView all details
Link to this fact

Identity

Project
Woyla Gold–Silver Project
Commodity
gold
Region
indonesia
Reported Region
Aceh Province, Sumatra, Indonesia
Ticker
FEG

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Michael Corey
Resource group id
resource:66d73620f781e71e9bb4
Deposit or zone
Aloe Eumpeuk
Mining method
open_pit
Ownership percent
51 %
Resource basis
gross

Resource Data

Category
indicated
Tonnes
200000
Grade
1.25
Grade Unit
g/t
Contained Metal
8
Contained Unit
koz
Cutoff Grade
0.15
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2026-11-09

Metal Equivalent

Metal Eq. Grade
1.36
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Indicated gold resource at Aloe Eumpeuk adds a higher-confidence component to the maiden MRE, supporting the overall project value.

Positive factors

  • Indicated gold resource for Aloe Eumpeuk
  • Contributes to the maiden MRE with higher confidence

Evidence · table

“1.25”

Context: 0.2

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedWoyla Gold–Silver Project · silverTonnes: 200000Grade: 0.04Grade Unit: mozContained Metal: 0.29Contained Unit: mozView all details
Link to this fact

Identity

Project
Woyla Gold–Silver Project
Commodity
silver
Region
indonesia
Reported Region
Aceh Province, Sumatra, Indonesia
Ticker
FEG

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Michael Corey
Resource group id
resource:66d73620f781e71e9bb4
Deposit or zone
Aloe Eumpeuk
Mining method
open_pit
Ownership percent
51 %
Resource basis
gross

Resource Data

Category
indicated
Tonnes
200000
Grade
0.04
Grade Unit
moz
Contained Metal
0.29
Contained Unit
moz
Cutoff Grade
0.15
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2026-11-09

Metal Equivalent

Metal Eq. Grade
1.36
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The high-grade Indicated silver resource at Aloe Eumpeuk is a key feature, making this zone silver-rich and contributing strongly to the overall AuEq grade.

Positive factors

  • High-grade silver resource for Aloe Eumpeuk
  • Significantly contributes to the AuEq grade of this zone
  • Indicated category provides higher confidence

Evidence · table

“0.04”

Context: 0.2

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredWoyla Gold–Silver Project · goldTonnes: 300000Grade: 1.59Grade Unit: g/tContained Metal: 14Contained Unit: kozView all details
Link to this fact

Identity

Project
Woyla Gold–Silver Project
Commodity
gold
Region
indonesia
Reported Region
Aceh Province, Sumatra, Indonesia
Ticker
FEG

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Michael Corey
Resource group id
resource:f55245ef82b9c5a29038
Deposit or zone
Aloe Eumpeuk
Mining method
open_pit
Ownership percent
51 %
Resource basis
gross

Resource Data

Category
inferred
Tonnes
300000
Grade
1.59
Grade Unit
g/t
Contained Metal
14
Contained Unit
koz
Cutoff Grade
0.15
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2026-11-09

Metal Equivalent

Metal Eq. Grade
2.62
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Inferred gold resource at Aloe Eumpeuk is high-grade, contributing to the overall project value despite its lower confidence category.

Positive factors

  • High-grade gold component for Aloe Eumpeuk

Negative factors

  • Inferred category has lower geological confidence

Evidence · table

“1.59”

Context: 0.3

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredWoyla Gold–Silver Project · silverTonnes: 300000Grade: 0.59Grade Unit: mozContained Metal: 0.59Contained Unit: mozView all details
Link to this fact

Identity

Project
Woyla Gold–Silver Project
Commodity
silver
Region
indonesia
Reported Region
Aceh Province, Sumatra, Indonesia
Ticker
FEG

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Michael Corey
Resource group id
resource:f55245ef82b9c5a29038
Deposit or zone
Aloe Eumpeuk
Mining method
open_pit
Ownership percent
51 %
Resource basis
gross

Resource Data

Category
inferred
Tonnes
300000
Grade
0.59
Grade Unit
moz
Contained Metal
0.59
Contained Unit
moz
Cutoff Grade
0.15
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2026-11-09

Metal Equivalent

Metal Eq. Grade
2.62
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The very high-grade Inferred silver resource at Aloe Eumpeuk makes this zone exceptionally silver-rich, contributing strongly to the overall project value despite its lower confidence.

Positive factors

  • Very high-grade silver component for Aloe Eumpeuk
  • Significantly boosts the AuEq grade of this zone

Negative factors

  • Inferred category has lower geological confidence

Evidence · table

“0.59”

Context: 0.3

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedWoyla Gold–Silver Project · goldTonnes: 200000Grade: 1.25Grade Unit: g/tContained Metal: 8000Contained Unit: kozView all details
Link to this fact

Identity

Project
Woyla Gold–Silver Project
Commodity
gold
Region
indonesia
Reported Region
Aceh Province, Sumatra, Indonesia
Ticker
FEG

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Michael Corey
Resource group id
resource:6d086977618138011621
Deposit or zone
Anak Perak
Mining method
open_pit
Ownership percent
51 %
Resource basis
gross

Resource Data

Category
indicated
Tonnes
200000
Grade
1.25
Grade Unit
g/t
Contained Metal
8000
Contained Unit
koz
Cutoff Grade
0.15
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2026-11-09

Metal Equivalent

Metal Eq. Grade
1.36
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Indicated gold resource at Anak Perak adds a higher-confidence component to the maiden MRE, supporting the overall project value.

Positive factors

  • Indicated gold resource for Anak Perak
  • Contributes to the maiden MRE with higher confidence

Evidence · table

“1.25”

Context: 0.2

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedWoyla Gold–Silver Project · silverTonnes: 200000Grade: 6.9Grade Unit: g/tContained Metal: 0.04Contained Unit: mozView all details
Link to this fact

Identity

Project
Woyla Gold–Silver Project
Commodity
silver
Region
indonesia
Reported Region
Aceh Province, Sumatra, Indonesia
Ticker
FEG

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Michael Corey
Resource group id
resource:6d086977618138011621
Deposit or zone
Anak Perak
Mining method
open_pit
Ownership percent
51 %
Resource basis
gross

Resource Data

Category
indicated
Tonnes
200000
Grade
6.9
Grade Unit
g/t
Contained Metal
0.04
Contained Unit
moz
Cutoff Grade
0.15
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2026-11-09

Metal Equivalent

Metal Eq. Grade
1.36
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Indicated silver resource at Anak Perak supports the overall AuEq grade of this zone within the maiden MRE.

Positive factors

  • Indicated silver resource for Anak Perak
  • Contributes to the AuEq grade of this zone

Evidence · table

“6.9”

Context: 0.2

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredWoyla Gold–Silver Project · goldTonnes: 100000Grade: 0.83Grade Unit: g/tContained Metal: 3Contained Unit: kozView all details
Link to this fact

Identity

Project
Woyla Gold–Silver Project
Commodity
gold
Region
indonesia
Reported Region
Aceh Province, Sumatra, Indonesia
Ticker
FEG

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Michael Corey
Resource group id
resource:6d1774203034c3c211c5
Deposit or zone
Anak Perak
Mining method
open_pit
Ownership percent
51 %
Resource basis
gross

Resource Data

Category
inferred
Tonnes
100000
Grade
0.83
Grade Unit
g/t
Contained Metal
3
Contained Unit
koz
Cutoff Grade
0.15
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2026-11-09

Metal Equivalent

Metal Eq. Grade
0.94
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Inferred gold resource at Anak Perak contributes to the maiden MRE's overall scale, but its lower confidence category suggests further work is needed.

Positive factors

  • Adds to the overall gold inventory of the project

Negative factors

  • Inferred category has lower geological confidence

Evidence · table

“0.83”

Context: 0.1

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredWoyla Gold–Silver Project · silverTonnes: 100000Grade: 0.03Grade Unit: mozContained Metal: 0.03Contained Unit: mozView all details
Link to this fact

Identity

Project
Woyla Gold–Silver Project
Commodity
silver
Region
indonesia
Reported Region
Aceh Province, Sumatra, Indonesia
Ticker
FEG

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Michael Corey
Resource group id
resource:6d1774203034c3c211c5
Deposit or zone
Anak Perak
Mining method
open_pit
Ownership percent
51 %
Resource basis
gross

Resource Data

Category
inferred
Tonnes
100000
Grade
0.03
Grade Unit
moz
Contained Metal
0.03
Contained Unit
moz
Cutoff Grade
0.15
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2026-11-09

Metal Equivalent

Metal Eq. Grade
0.94
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Inferred silver resource at Anak Perak contributes to the maiden MRE's overall scale, but its lower confidence category suggests further work is needed.

Positive factors

  • Adds to the overall silver inventory of the project

Negative factors

  • Inferred category has lower geological confidence

Evidence · table

“0.03”

Context: 0.1

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedWoyla Gold–Silver Project · goldTonnes: 5100000Grade: 0.76Grade Unit: g/tContained Metal: 125Contained Unit: kozView all details
Link to this fact

Identity

Project
Woyla Gold–Silver Project
Commodity
gold
Region
indonesia
Reported Region
Aceh Province, Sumatra, Indonesia
Ticker
FEG

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Michael Corey
Resource group id
resource:1576b823a78c0c8ad75a
Deposit or zone
Woyla Total
Mining method
open_pit
Ownership percent
51 %
Resource basis
gross

Resource Data

Category
indicated
Tonnes
5100000
Grade
0.76
Grade Unit
g/t
Contained Metal
125
Contained Unit
koz
Cutoff Grade
0.15
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2026-11-09

Metal Equivalent

Metal Eq. Grade
0.92
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The total Indicated gold resource for Woyla represents a substantial, higher-confidence component of the maiden MRE, de-risking the project.

Positive factors

  • Significant portion of the maiden MRE is in the Indicated category
  • Provides a strong confidence base for the project

Evidence · table

“0.76”

Context: 5.1

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedWoyla Gold–Silver Project · silverTonnes: 5100000Grade: 1.73Grade Unit: mozContained Metal: 1.73Contained Unit: mozView all details
Link to this fact

Identity

Project
Woyla Gold–Silver Project
Commodity
silver
Region
indonesia
Reported Region
Aceh Province, Sumatra, Indonesia
Ticker
FEG

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Michael Corey
Resource group id
resource:1576b823a78c0c8ad75a
Deposit or zone
Woyla Total
Mining method
open_pit
Ownership percent
51 %
Resource basis
gross

Resource Data

Category
indicated
Tonnes
5100000
Grade
1.73
Grade Unit
moz
Contained Metal
1.73
Contained Unit
moz
Cutoff Grade
0.15
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2026-11-09

Metal Equivalent

Metal Eq. Grade
0.92
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The total Indicated silver resource for Woyla provides a substantial, higher-confidence byproduct component to the maiden MRE, enhancing overall project value.

Positive factors

  • Significant portion of the maiden MRE's silver is in the Indicated category
  • Adds substantial byproduct value with higher confidence

Evidence · table

“1.73”

Context: 5.1

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredWoyla Gold–Silver Project · goldTonnes: 14300000Grade: 0.69Grade Unit: g/tContained Metal: 316Contained Unit: kozView all details
Link to this fact

Identity

Project
Woyla Gold–Silver Project
Commodity
gold
Region
indonesia
Reported Region
Aceh Province, Sumatra, Indonesia
Ticker
FEG

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Michael Corey
Resource group id
resource:52f91cefbb283ae1812a
Deposit or zone
Woyla Total
Mining method
open_pit
Ownership percent
51 %
Resource basis
gross

Resource Data

Category
inferred
Tonnes
14300000
Grade
0.69
Grade Unit
g/t
Contained Metal
316
Contained Unit
koz
Cutoff Grade
0.15
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2026-11-09

Metal Equivalent

Metal Eq. Grade
0.87
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The total Inferred gold resource for Woyla forms the bulk of the maiden MRE, indicating substantial potential but requiring further drilling to upgrade confidence.

Positive factors

  • Largest gold component of the maiden MRE
  • Provides significant scale to the project

Negative factors

  • Inferred category has lower geological confidence

Evidence · table

“0.69”

Context: 14.3

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredWoyla Gold–Silver Project · silverTonnes: 14300000Grade: 5.47Grade Unit: mozContained Metal: 5.47Contained Unit: mozView all details
Link to this fact

Identity

Project
Woyla Gold–Silver Project
Commodity
silver
Region
indonesia
Reported Region
Aceh Province, Sumatra, Indonesia
Ticker
FEG

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Michael Corey
Resource group id
resource:52f91cefbb283ae1812a
Deposit or zone
Woyla Total
Mining method
open_pit
Ownership percent
51 %
Resource basis
gross

Resource Data

Category
inferred
Tonnes
14300000
Grade
5.47
Grade Unit
moz
Contained Metal
5.47
Contained Unit
moz
Cutoff Grade
0.15
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2026-11-09

Metal Equivalent

Metal Eq. Grade
0.87
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The total Inferred silver resource for Woyla provides substantial contained metal, contributing significantly to the overall project scale despite its lower confidence category.

Positive factors

  • Largest silver component of the maiden MRE
  • Adds significant byproduct value to the project

Negative factors

  • Inferred category has lower geological confidence

Evidence · table

“5.47”

Context: 14.3

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.