# Errington Metals Files Technical Report for Mineral Resource Estimate for the Sudbury Basin Project

Canonical Atlas analysis: https://atlas-aws.minestarters.com/news/errington-metals-files-technical-report-for-mineral-resource-estimate-for-the-su--c9dff014-583e-487c-92c4-e31251937b17

Original source: https://www.juniorminingnetwork.com/junior-miner-news/press-releases/3496-tsx-venture/em/214429-errington-metals-files-technical-report-for-mineral-resource-estimate-for-the-sudbury-basin-project.html

Publisher: jmn

Original announcement: 2026-11-09T00:37:23.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-11-09T14:31:47.065Z

Atlas analysis updated: 2026-11-09T14:31:47.065Z

- Company: Errington Metals Corp.

- Ticker: EM

- Exchange: TSXV

- Region: Northern Ontario, Canada

- Primary commodity: Copper

- Secondary commodities: Gold, Silver, Lead, Zinc

- Document categories: Resource update

- Extracted: 2026-11-09 14:20:30 UTC

Narrative sentiment: 0.10 · Bullish

## Minestarters Atlas summary

Errington Metals Corp. has filed an independent NI 43-101 technical report on SEDAR+ regarding its maiden Mineral Resource Estimate for the Sudbury Basin Project in Northern Ontario. The report, dated November 6, 2026, was prepared by DRA Americas Inc. and covers the project's VMS-style mineralization.

Reasoning: The document is a formal announcement of the filing of a technical report containing a maiden mineral resource estimate, which is a key regulatory milestone for the project.

- Positive factor: NI 43-101 compliant technical report filed

- Positive factor: Maiden Mineral Resource Estimate previously announced

Facts used in scoring: 15

## Classification and evidence

**Maiden Resource**

Polarity: neutral

Definition: First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: The company announced a maiden Mineral Resource Estimate for the Sudbury Basin Project.

Evidence · text

> Errington Metals Announces Maiden Mineral Resource Estimate for the Sudbury Basin Project

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: The technical report was filed in accordance with National Instrument 43-101 standards.

Evidence · text

> The technical report has been filed in accordance with National Instrument 43-101

## Extracted facts

Stored fact records: 15. Some facts used in scoring do not have a stored record.

## Resource Estimates (15)

### measured

[Link to this fact](https://atlas-aws.minestarters.com/news/errington-metals-files-technical-report-for-mineral-resource-estimate-for-the-su--c9dff014-583e-487c-92c4-e31251937b17#fact-resource-facts-0)

sudbury basin project · copper

#### Identity

- Project: sudbury basin project
- Commodity: copper
- Region: canada\_on
- Reported Region: Northern Ontario, Canada
- Ticker: EM

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-20T00:00:00.000Z
- Reporting standards: ni\_43\_101
- Qualified person names: Ryan Wilson, David Frost
- Resource group id: resource:f904a18abd1bc9aa0043
- Deposit or zone: Errington

#### Resource Data

- Category: measured
- Tonnes: 7652664
- Grade: 1.13
- Grade Unit: %

#### Prior Estimate

- Resource Date: 2026-09-20

#### Metal Equivalent

- Assumptions Disclosed: Yes

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-09T00:00:00.000Z

Reasoning: Measured resource component of the maiden MRE.

Evidence · text

> Technical Report – Mineral Resource Estimate for the Sudbury Basin Project

#### Tags used in scoring

**Measured Resource**

Polarity: positive

Definition: Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/errington-metals-files-technical-report-for-mineral-resource-estimate-for-the-su--c9dff014-583e-487c-92c4-e31251937b17#fact-resource-facts-1)

sudbury basin project · copper

#### Identity

- Project: sudbury basin project
- Commodity: copper
- Region: canada\_on
- Reported Region: Northern Ontario, Canada
- Ticker: EM

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-20T00:00:00.000Z
- Reporting standards: ni\_43\_101
- Qualified person names: Ryan Wilson, David Frost
- Resource group id: resource:e40f7e0b27eadf05cdca
- Deposit or zone: Errington

#### Resource Data

- Category: indicated
- Tonnes: 2968518
- Grade: 1.13
- Grade Unit: %

#### Prior Estimate

- Resource Date: 2026-09-20

#### Metal Equivalent

- Assumptions Disclosed: Yes

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-09T00:00:00.000Z

Reasoning: Indicated resource component of the maiden MRE.

Evidence · text

> Technical Report – Mineral Resource Estimate for the Sudbury Basin Project

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/errington-metals-files-technical-report-for-mineral-resource-estimate-for-the-su--c9dff014-583e-487c-92c4-e31251937b17#fact-resource-facts-2)

sudbury basin project · copper

#### Identity

- Project: sudbury basin project
- Commodity: copper
- Region: canada\_on
- Reported Region: Northern Ontario, Canada
- Ticker: EM

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-20T00:00:00.000Z
- Reporting standards: ni\_43\_101
- Qualified person names: Ryan Wilson, David Frost
- Resource group id: resource:3afecd49781cf162e765
- Deposit or zone: Errington

#### Resource Data

- Category: inferred
- Tonnes: 804289
- Grade: 1.24
- Grade Unit: %

#### Prior Estimate

- Resource Date: 2026-09-20

#### Metal Equivalent

- Assumptions Disclosed: Yes

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-09T00:00:00.000Z

Reasoning: Inferred resource component of the maiden MRE.

Evidence · text

> Technical Report – Mineral Resource Estimate for the Sudbury Basin Project

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/errington-metals-files-technical-report-for-mineral-resource-estimate-for-the-su--c9dff014-583e-487c-92c4-e31251937b17#fact-resource-facts-3)

sudbury basin project · gold

#### Identity

- Project: sudbury basin project
- Commodity: gold
- Region: canada\_on
- Reported Region: Northern Ontario, Canada
- Ticker: EM

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-20T00:00:00.000Z
- Reporting standards: ni\_43\_101
- Qualified person names: Ryan Wilson, David Frost
- Resource group id: resource:e40f7e0b27eadf05cdca
- Deposit or zone: Errington

#### Resource Data

- Category: indicated
- Tonnes: 2968518
- Grade: 0.81
- Grade Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-20

#### Metal Equivalent

- Assumptions Disclosed: Yes

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-09T00:00:00.000Z

Reasoning: Indicated gold resource component of the maiden MRE.

Evidence · text

> Technical Report – Mineral Resource Estimate for the Sudbury Basin Project

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/errington-metals-files-technical-report-for-mineral-resource-estimate-for-the-su--c9dff014-583e-487c-92c4-e31251937b17#fact-resource-facts-4)

sudbury basin project · gold

#### Identity

- Project: sudbury basin project
- Commodity: gold
- Region: canada\_on
- Reported Region: Northern Ontario, Canada
- Ticker: EM

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-20T00:00:00.000Z
- Reporting standards: ni\_43\_101
- Qualified person names: Ryan Wilson, David Frost
- Resource group id: resource:3afecd49781cf162e765
- Deposit or zone: Errington

#### Resource Data

- Category: inferred
- Tonnes: 804289
- Grade: 0.79
- Grade Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-20

#### Metal Equivalent

- Assumptions Disclosed: Yes

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-09T00:00:00.000Z

Reasoning: Inferred gold resource component of the maiden MRE.

Evidence · text

> Technical Report – Mineral Resource Estimate for the Sudbury Basin Project

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### measured

[Link to this fact](https://atlas-aws.minestarters.com/news/errington-metals-files-technical-report-for-mineral-resource-estimate-for-the-su--c9dff014-583e-487c-92c4-e31251937b17#fact-resource-facts-5)

sudbury basin project · gold

#### Identity

- Project: sudbury basin project
- Commodity: gold
- Region: canada\_on
- Reported Region: Northern Ontario, Canada
- Ticker: EM

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-20T00:00:00.000Z
- Reporting standards: ni\_43\_101
- Qualified person names: Ryan Wilson, David Frost
- Resource group id: resource:f904a18abd1bc9aa0043
- Deposit or zone: Errington

#### Resource Data

- Category: measured
- Tonnes: 7652664
- Grade: 0.81
- Grade Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-20

#### Metal Equivalent

- Assumptions Disclosed: Yes

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-09T00:00:00.000Z

Reasoning: Measured gold resource component of the maiden MRE.

Evidence · text

> Technical Report – Mineral Resource Estimate for the Sudbury Basin Project

#### Tags used in scoring

**Measured Resource**

Polarity: positive

Definition: Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/errington-metals-files-technical-report-for-mineral-resource-estimate-for-the-su--c9dff014-583e-487c-92c4-e31251937b17#fact-resource-facts-6)

sudbury basin project · lead

#### Identity

- Project: sudbury basin project
- Commodity: lead
- Region: canada\_on
- Reported Region: Northern Ontario, Canada
- Ticker: EM

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-20T00:00:00.000Z
- Reporting standards: ni\_43\_101
- Qualified person names: Ryan Wilson, David Frost
- Resource group id: resource:e40f7e0b27eadf05cdca
- Deposit or zone: Errington

#### Resource Data

- Category: indicated
- Tonnes: 2968518
- Grade: 1.3
- Grade Unit: %

#### Prior Estimate

- Resource Date: 2026-09-20

#### Metal Equivalent

- Assumptions Disclosed: Yes

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-09T00:00:00.000Z

Reasoning: Indicated lead resource component of the maiden MRE.

Evidence · text

> Technical Report – Mineral Resource Estimate for the Sudbury Basin Project

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### measured

[Link to this fact](https://atlas-aws.minestarters.com/news/errington-metals-files-technical-report-for-mineral-resource-estimate-for-the-su--c9dff014-583e-487c-92c4-e31251937b17#fact-resource-facts-7)

sudbury basin project · lead

#### Identity

- Project: sudbury basin project
- Commodity: lead
- Region: canada\_on
- Reported Region: Northern Ontario, Canada
- Ticker: EM

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-20T00:00:00.000Z
- Reporting standards: ni\_43\_101
- Qualified person names: Ryan Wilson, David Frost
- Resource group id: resource:f904a18abd1bc9aa0043
- Deposit or zone: Errington

#### Resource Data

- Category: measured
- Tonnes: 7652664
- Grade: 0.99
- Grade Unit: %

#### Prior Estimate

- Resource Date: 2026-09-20

#### Metal Equivalent

- Assumptions Disclosed: Yes

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-09T00:00:00.000Z

Reasoning: Measured lead resource component of the maiden MRE.

Evidence · text

> Technical Report – Mineral Resource Estimate for the Sudbury Basin Project

#### Tags used in scoring

**Measured Resource**

Polarity: positive

Definition: Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/errington-metals-files-technical-report-for-mineral-resource-estimate-for-the-su--c9dff014-583e-487c-92c4-e31251937b17#fact-resource-facts-8)

sudbury basin project · lead

#### Identity

- Project: sudbury basin project
- Commodity: lead
- Region: canada\_on
- Reported Region: Northern Ontario, Canada
- Ticker: EM

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-20T00:00:00.000Z
- Reporting standards: ni\_43\_101
- Qualified person names: Ryan Wilson, David Frost
- Resource group id: resource:3afecd49781cf162e765
- Deposit or zone: Errington

#### Resource Data

- Category: inferred
- Tonnes: 804289
- Grade: 1.2
- Grade Unit: %

#### Prior Estimate

- Resource Date: 2026-09-20

#### Metal Equivalent

- Assumptions Disclosed: Yes

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-09T00:00:00.000Z

Reasoning: Inferred lead resource component of the maiden MRE.

Evidence · text

> Technical Report – Mineral Resource Estimate for the Sudbury Basin Project

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/errington-metals-files-technical-report-for-mineral-resource-estimate-for-the-su--c9dff014-583e-487c-92c4-e31251937b17#fact-resource-facts-9)

sudbury basin project · silver

#### Identity

- Project: sudbury basin project
- Commodity: silver
- Region: canada\_on
- Reported Region: Northern Ontario, Canada
- Ticker: EM

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-20T00:00:00.000Z
- Reporting standards: ni\_43\_101
- Qualified person names: Ryan Wilson, David Frost
- Resource group id: resource:e40f7e0b27eadf05cdca
- Deposit or zone: Errington

#### Resource Data

- Category: indicated
- Tonnes: 2968518
- Grade: 54.58
- Grade Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-20

#### Metal Equivalent

- Assumptions Disclosed: Yes

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-09T00:00:00.000Z

Reasoning: Indicated silver resource component of the maiden MRE.

Evidence · text

> Technical Report – Mineral Resource Estimate for the Sudbury Basin Project

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### measured

[Link to this fact](https://atlas-aws.minestarters.com/news/errington-metals-files-technical-report-for-mineral-resource-estimate-for-the-su--c9dff014-583e-487c-92c4-e31251937b17#fact-resource-facts-10)

sudbury basin project · silver

#### Identity

- Project: sudbury basin project
- Commodity: silver
- Region: canada\_on
- Reported Region: Northern Ontario, Canada
- Ticker: EM

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-20T00:00:00.000Z
- Reporting standards: ni\_43\_101
- Qualified person names: Ryan Wilson, David Frost
- Resource group id: resource:f904a18abd1bc9aa0043
- Deposit or zone: Errington

#### Resource Data

- Category: measured
- Tonnes: 7652664
- Grade: 46.08
- Grade Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-20

#### Metal Equivalent

- Assumptions Disclosed: Yes

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-09T00:00:00.000Z

Reasoning: Measured silver resource component of the maiden MRE.

Evidence · text

> Technical Report – Mineral Resource Estimate for the Sudbury Basin Project

#### Tags used in scoring

**Measured Resource**

Polarity: positive

Definition: Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/errington-metals-files-technical-report-for-mineral-resource-estimate-for-the-su--c9dff014-583e-487c-92c4-e31251937b17#fact-resource-facts-11)

sudbury basin project · silver

#### Identity

- Project: sudbury basin project
- Commodity: silver
- Region: canada\_on
- Reported Region: Northern Ontario, Canada
- Ticker: EM

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-20T00:00:00.000Z
- Reporting standards: ni\_43\_101
- Qualified person names: Ryan Wilson, David Frost
- Resource group id: resource:3afecd49781cf162e765
- Deposit or zone: Errington

#### Resource Data

- Category: inferred
- Tonnes: 804289
- Grade: 51.79
- Grade Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-20

#### Metal Equivalent

- Assumptions Disclosed: Yes

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-09T00:00:00.000Z

Reasoning: Inferred silver resource component of the maiden MRE.

Evidence · text

> Technical Report – Mineral Resource Estimate for the Sudbury Basin Project

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/errington-metals-files-technical-report-for-mineral-resource-estimate-for-the-su--c9dff014-583e-487c-92c4-e31251937b17#fact-resource-facts-12)

sudbury basin project · zinc

#### Identity

- Project: sudbury basin project
- Commodity: zinc
- Region: canada\_on
- Reported Region: Northern Ontario, Canada
- Ticker: EM

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-20T00:00:00.000Z
- Reporting standards: ni\_43\_101
- Qualified person names: Ryan Wilson, David Frost
- Resource group id: resource:3afecd49781cf162e765
- Deposit or zone: Errington

#### Resource Data

- Category: inferred
- Tonnes: 804289
- Grade: 4.3
- Grade Unit: %

#### Prior Estimate

- Resource Date: 2026-09-20

#### Metal Equivalent

- Assumptions Disclosed: Yes

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-09T00:00:00.000Z

Reasoning: Inferred zinc resource component of the maiden MRE.

Evidence · text

> Technical Report – Mineral Resource Estimate for the Sudbury Basin Project

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### measured

[Link to this fact](https://atlas-aws.minestarters.com/news/errington-metals-files-technical-report-for-mineral-resource-estimate-for-the-su--c9dff014-583e-487c-92c4-e31251937b17#fact-resource-facts-13)

sudbury basin project · zinc

#### Identity

- Project: sudbury basin project
- Commodity: zinc
- Region: canada\_on
- Reported Region: Northern Ontario, Canada
- Ticker: EM

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-20T00:00:00.000Z
- Reporting standards: ni\_43\_101
- Qualified person names: Ryan Wilson, David Frost
- Resource group id: resource:f904a18abd1bc9aa0043
- Deposit or zone: Errington

#### Resource Data

- Category: measured
- Tonnes: 7652664
- Grade: 3.61
- Grade Unit: %

#### Prior Estimate

- Resource Date: 2026-09-20

#### Metal Equivalent

- Assumptions Disclosed: Yes

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-09T00:00:00.000Z

Reasoning: Measured zinc resource component of the maiden MRE.

Evidence · text

> Technical Report – Mineral Resource Estimate for the Sudbury Basin Project

#### Tags used in scoring

**Measured Resource**

Polarity: positive

Definition: Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/errington-metals-files-technical-report-for-mineral-resource-estimate-for-the-su--c9dff014-583e-487c-92c4-e31251937b17#fact-resource-facts-14)

sudbury basin project · zinc

#### Identity

- Project: sudbury basin project
- Commodity: zinc
- Region: canada\_on
- Reported Region: Northern Ontario, Canada
- Ticker: EM

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-20T00:00:00.000Z
- Reporting standards: ni\_43\_101
- Qualified person names: Ryan Wilson, David Frost
- Resource group id: resource:e40f7e0b27eadf05cdca
- Deposit or zone: Errington

#### Resource Data

- Category: indicated
- Tonnes: 2968518
- Grade: 4.55
- Grade Unit: %

#### Prior Estimate

- Resource Date: 2026-09-20

#### Metal Equivalent

- Assumptions Disclosed: Yes

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-09T00:00:00.000Z

Reasoning: Indicated zinc resource component of the maiden MRE.

Evidence · text

> Technical Report – Mineral Resource Estimate for the Sudbury Basin Project

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
