EMC: Quarterly Activities Report - September 2026
Original announcement by asx on
- Company
- Everest Metals Corporation Ltd
- Ticker
- EMC
- Exchange
- ASX
- Region
- Western Australia
- Primary commodity
- Unavailable
- Secondary commodities
- None reported
- Document categories
- Resource update, Metallurgy, Permitting, Agreement transaction, Other
- Extracted
- 2026-10-28 22:46:17 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Everest Metals Corporation Ltd reported an updated Mineral Resource Estimate for its Mt Dimer Taipan Gold Project, establishing Measured and Indicated resources for the first time. The company also announced positive batch testwork results for rubidium extraction at its Mt Edon Critical Minerals Project, achieving up to 90% recovery. Additionally, a Mining Lease was granted for the Revere Gold Project, alongside an increase in JV ownership and a reduction in royalty obligations.
Reasoning: The company reported an updated MRE for Mt Dimer establishing M&I resources, positive batch testwork for rubidium extraction, and significant progress at Revere including a granted mining lease and JV rationalization, though MREs are re-statements and some metallurgical work requires further optimization.
Positive factors
- Mt Dimer MRE update establishes Measured and Indicated resources for the first time, significantly de-risking the project.
- Strong rubidium batch recovery of 90% achieved in testwork for Mt Edon.
- Mining Lease granted for Revere Gold Project, securing tenure and advancing development approvals.
- Increased ownership in Revere JV to 56% and reduced royalty obligations, improving project economics.
Negative factors
- Mt Edon continuous rubidium kiln trials show lower recovery (50-60%) and require further optimization, indicating early-stage process development.
- Revere drilling assays are pending, delaying full assessment of exploration success.
- Mt Edon and Revere MREs are re-statements of previously announced figures, reducing their novelty in this report.
Low confidence — this extraction should be reviewed alongside the original source.
Facts used in scoring: 28

Classification and evidence
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: The Mt Dimer MRE established Measured resources for the first time, indicating the highest level of geological confidence.
Evidence · text
“Measured and Indicated Resources established for the first time”
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: The Mt Dimer MRE established Indicated resources for the first time, indicating reasonable geological confidence.
Evidence · text
“Measured and Indicated Resources established for the first time”
Category Upgradepositive
Resource confidence improved — Inferred upgraded to Indicated, or Indicated to Measured. De-risking signal.
Why it applies: The Mt Dimer MRE established Measured and Indicated Mineral Resources for the first time, upgrading resource confidence from an entirely Inferred resource reported in 2021.
Evidence · text
“Measured and Indicated Mineral Resources at Mt Dimer for the first time (post-quarter)”
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: The Mt Dimer MRE is reported in accordance with JORC Code (2012).
Evidence · text
“JORC (2012) Mineral Resource Estimate”
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: The Mt Dimer MRE was compiled and approved by Mr Bahman Rashidi, a member of AusIMM and RPGeo AIG.
Evidence · text
“Mr Bahman Rashidi, who is a member of the Australasian Institute of Mining and Metallurgy (AusIMM) and a Registered Professional Geoscientist (RPGeo) in the field of Mineral Exploration and Industrial Minerals with the Australian Institute of Geoscientists (AIG).”
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: The Mt Dimer MRE is reported at a 0.5g/t Au cut-off grade.
Evidence · text
“reported at a 0.5g/t Au cut-off grade”
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: The document reports an updated Mineral Resource Estimate for Mt Dimer.
Evidence · text
“Updated Mineral Resource Estimate of 975,000t @ 1.37g/t Au”
Historical Estimate Onlynegative
Estimate pre-dates or does not comply with current JORC/NI 43-101 standards — requires verification drilling.
Why it applies: The Mt Edon MRE is a re-statement of an estimate with an effective date of 19 May 2026, making it historical in this context.
Evidence · text
“effective date of the MRE is 19 May 2026”
Historical Estimate Onlynegative
Estimate pre-dates or does not comply with current JORC/NI 43-101 standards — requires verification drilling.
Why it applies: The Revere MRE is a re-statement of an estimate with an effective date of 14 May 2026, making it historical in this context.
Evidence · text
“effective date of the MRE is 14 May 2026”
High Recoverypositive
Recovery at or above the exceptional band for the commodity and processing route.
Why it applies: Batch testwork achieved rubidium extraction efficiencies of up to 90%, which is an exceptional recovery for this commodity.
Evidence · text
“Batch roasting and leaching testwork achieved rubidium extraction efficiencies of up to 90%”
Bench Scale Onlynegative
Only preliminary bench tests completed — no locked-cycle or pilot work.
Why it applies: The rubidium testwork includes batch roasting and leaching and initial continuous rotary-kiln trials, which are considered bench-scale or preliminary.
Evidence · text
“Batch roasting and leaching testwork achieved rubidium extraction efficiencies of up to 90%, with initial continuous rotary-kiln trials (50–60%) undergoing further optimisation”
Refractory Orenegative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Why it applies: The rubidium extraction process involves 'roasting and leaching' and 'optimisation', suggesting complex mineralogy requiring special processing.
Evidence · text
“Batch roasting and leaching testwork achieved rubidium extraction efficiencies of up to 90%, with process optimisation”
Recovery Stagnantnegative
No improvement across multiple test programs on comparable material.
Why it applies: Initial continuous rotary-kiln trials achieved variable extraction efficiencies of 50–60%, which is significantly lower than the 90% achieved in batch testwork and requires further optimisation.
Evidence · text
“Initial continuous rotary-kiln trials achieved variable extraction efficiencies of 50–60%, with further optimisation underway.”
Mining Lease Grantedpositive · Story-specific tag
No canonical definition is currently available.
Why it applies: Mining Lease M51/905 was granted until 2047, securing tenure over the Big John Mineral Resource.
Evidence · text
“Mining Lease M51/905 granted until 2047”
JV Interest Increasedpositive · Story-specific tag
No canonical definition is currently available.
Why it applies: EMC's ownership in the Goodins East JV increased to 56%.
Evidence · text
“increase EMC’s ownership in the Goodins East JV to 56%”
Royalty Reductionpositive · Story-specific tag
No canonical definition is currently available.
Why it applies: Royalty obligations were reduced from 2.0% to 1.0% over certain tenements.
Evidence · text
“reducing the total royalty burden over these tenements from 2.0% to 1.0%”
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: Como Engineers was appointed to undertake a Scoping Study, which is an early-stage economic assessment.
Evidence · text
“Como Engineers appointed to undertake a Scoping Study”
Mill Routeneutral
Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
Why it applies: the document describes a flotation route ("concentrate")
Gravity Routeneutral
Gravity separation forms a material part of the flowsheet.
Why it applies: the document describes a gravity route ("gravity")
POX/BIOX Routeneutral
Pressure or bio-oxidation for refractory ore — high CAPEX and OPEX.
Why it applies: the document describes a pox_biox route ("roasting")
Multi-Domain Testedpositive
Variability across ore domains (oxide, transition, fresh) has been addressed.
Why it applies: 2 distinct composites were tested
Extracted facts
Stored fact records: 24. Some facts used in scoring do not have a stored record.
Resource Estimates (21)
measuredMt Dimer Taipan Gold Project · goldTonnes: 118000Grade: 1.7Grade Unit: g/tContained Metal: 6449Contained Unit: ozView all detailsHide details
Identity
- Project
- Mt Dimer Taipan Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- EMC
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Bahman Rashidi
- Resource group id
- resource:b0c251fc4215ebd81714
- Deposit or zone
- In-situ
Resource Data
- Category
- measured
- Tonnes
- 118000
- Grade
- 1.7
- Grade Unit
- g/t
- Contained Metal
- 6449
- Contained Unit
- oz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-10-07
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The establishment of a Measured resource for the first time at a strong grade significantly de-risks the project and improves confidence.
Positive factors
- Measured Resource category established for the first time, indicating high geological confidence.
- Grade of 1.7 g/t Au is strong for an open-pit gold project.
Evidence · table
“1.70”
Context: 118,000
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedMt Dimer Taipan Gold Project · goldTonnes: 27000Grade: 1.45Grade Unit: g/tContained Metal: 1259Contained Unit: ozView all detailsHide details
Identity
- Project
- Mt Dimer Taipan Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- EMC
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Bahman Rashidi
- Resource group id
- resource:cdafb26a55cb47e27344
- Deposit or zone
- In-situ
Resource Data
- Category
- indicated
- Tonnes
- 27000
- Grade
- 1.45
- Grade Unit
- g/t
- Contained Metal
- 1259
- Contained Unit
- oz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-10-07
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The establishment of an Indicated resource for the first time at a good grade improves confidence and de-risks the project.
Positive factors
- Indicated Resource category established for the first time, indicating reasonable geological confidence.
- Grade of 1.45 g/t Au is moderate to strong for an open-pit gold project.
Evidence · table
“1.45”
Context: 27,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredMt Dimer Taipan Gold Project · goldTonnes: 688000Grade: 1.32Grade Unit: g/tContained Metal: 29198Contained Unit: ozView all detailsHide details
Identity
- Project
- Mt Dimer Taipan Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- EMC
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Bahman Rashidi
- Resource group id
- resource:1ef3e0edef62df4ee7c1
- Deposit or zone
- In-situ
Resource Data
- Category
- inferred
- Tonnes
- 688000
- Grade
- 1.32
- Grade Unit
- g/t
- Contained Metal
- 29198
- Contained Unit
- oz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-10-07
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The Inferred resource provides a substantial base for future exploration and resource conversion, contributing to overall project scale.
Positive factors
- Significant tonnage in the Inferred category, indicating future growth potential.
- Grade of 1.32 g/t Au is moderate for an open-pit gold project.
Evidence · table
“1.32”
Context: 688,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedMt Dimer Taipan Gold Project · goldTonnes: 142000Grade: 1.33Grade Unit: g/tContained Metal: 6072Contained Unit: ozView all detailsHide details
Identity
- Project
- Mt Dimer Taipan Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- EMC
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Bahman Rashidi
- Resource group id
- resource:80cf341dfc29e77520c2
- Deposit or zone
- Stockpile
Resource Data
- Category
- indicated
- Tonnes
- 142000
- Grade
- 1.33
- Grade Unit
- g/t
- Contained Metal
- 6072
- Contained Unit
- oz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-10-07
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The Indicated stockpile resource represents material ready for processing, contributing to immediate operational value.
Positive factors
- Stockpile material is readily available for processing, providing near-term revenue potential.
- Indicated category provides good confidence in the stockpile quantity and grade.
Evidence · table
“1.33”
Context: 142,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
measuredMt Dimer Taipan Gold Project · goldTonnes: 118000Grade: 1.7Grade Unit: g/tContained Metal: 6449Contained Unit: ozView all detailsHide details
Identity
- Project
- Mt Dimer Taipan Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- EMC
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Bahman Rashidi
- Resource group id
- resource:20b5a7ef8ea131c276bd
- Deposit or zone
- Total
Resource Data
- Category
- measured
- Tonnes
- 118000
- Grade
- 1.7
- Grade Unit
- g/t
- Contained Metal
- 6449
- Contained Unit
- oz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-10-07
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The total Measured resource confirms a significant, high-confidence portion of the project's gold endowment.
Positive factors
- Total Measured resource provides a high-confidence base for mine planning and economic studies.
- Grade of 1.7 g/t Au is strong for an open-pit gold project.
Evidence · table
“1.70”
Context: 118,000
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedMt Dimer Taipan Gold Project · goldTonnes: 169000Grade: 1.35Grade Unit: g/tContained Metal: 7331Contained Unit: ozView all detailsHide details
Identity
- Project
- Mt Dimer Taipan Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- EMC
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Bahman Rashidi
- Resource group id
- resource:7e6fe852fc9c610cb739
- Deposit or zone
- Total
Resource Data
- Category
- indicated
- Tonnes
- 169000
- Grade
- 1.35
- Grade Unit
- g/t
- Contained Metal
- 7331
- Contained Unit
- oz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-10-07
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The total Indicated resource represents a significant portion of the project with reasonable geological confidence.
Positive factors
- Total Indicated resource provides a solid base for future economic studies and conversion to reserves.
- Grade of 1.35 g/t Au is moderate to strong for an open-pit gold project.
Evidence · table
“1.35”
Context: 169,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredMt Dimer Taipan Gold Project · goldTonnes: 688000Grade: 1.32Grade Unit: g/tContained Metal: 29198Contained Unit: ozView all detailsHide details
Identity
- Project
- Mt Dimer Taipan Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- EMC
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Bahman Rashidi
- Resource group id
- resource:d501fc564826be7a80f0
- Deposit or zone
- Total
Resource Data
- Category
- inferred
- Tonnes
- 688000
- Grade
- 1.32
- Grade Unit
- g/t
- Contained Metal
- 29198
- Contained Unit
- oz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-10-07
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The substantial Inferred resource indicates significant potential for future resource conversion and project expansion.
Positive factors
- Large Inferred resource provides significant exploration upside and potential for future growth.
- Grade of 1.32 g/t Au is moderate for an open-pit gold project.
Evidence · table
“1.32”
Context: 688,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredMt Dimer Taipan Gold Project · goldTonnes: 975000Grade: 1.37Grade Unit: g/tContained Metal: 42978Contained Unit: ozView all detailsHide details
Identity
- Project
- Mt Dimer Taipan Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- EMC
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Bahman Rashidi
- Resource group id
- resource:0d47b95c7e5da337aa3e
- Deposit or zone
- Total Mineral Resources
Resource Data
- Category
- inferred
- Tonnes
- 975000
- Grade
- 1.37
- Grade Unit
- g/t
- Contained Metal
- 42978
- Contained Unit
- oz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-10-07
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The updated total resource, with newly established Measured and Indicated categories, represents a significant positive step for the project.
Positive factors
- Overall resource size of 975,000 tonnes at 1.37 g/t Au is a solid base for project development.
- Establishment of Measured and Indicated categories for the first time significantly de-risks the project.
Evidence · table
“1.37”
Context: 975,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedMt Edon Critical Minerals Project · rubidiumTonnes: 2700000Grade: 0.23Grade Unit: %Contained Metal: 6300Contained Unit: tHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Mt Edon Critical Minerals Project
- Commodity
- rubidium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- EMC
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Bahman Rashidi
- Resource group id
- resource:8154f2c4e441183137ef
- Deposit or zone
- Mt Edon
Resource Data
- Category
- indicated
- Tonnes
- 2700000
- Grade
- 0.23
- Grade Unit
- %
- Contained Metal
- 6300
- Contained Unit
- t
- Cutoff Grade
- 0.1
- Cutoff Unit
- % Rb2O
Prior Estimate
- Resource Date
- 2026-05-19
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-05-19T00:00:00.000Z
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The re-stated Indicated resource for rubidium confirms a significant, well-defined portion of the project, despite being historical.
Positive factors
- Indicated resource provides reasonable confidence for project planning.
- Grade of 0.23% Rb2O is a good grade for rubidium.
Negative factors
- This is a re-statement of a prior MRE, reducing its novelty.
Evidence · table
“0.23”
Context: 2.7
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredMt Edon Critical Minerals Project · rubidiumTonnes: 1500000Grade: 0.22Grade Unit: %Contained Metal: 3500Contained Unit: tHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Mt Edon Critical Minerals Project
- Commodity
- rubidium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- EMC
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Bahman Rashidi
- Resource group id
- resource:5ed379a72ec6928adeb1
- Deposit or zone
- Mt Edon
Resource Data
- Category
- inferred
- Tonnes
- 1500000
- Grade
- 0.22
- Grade Unit
- %
- Contained Metal
- 3500
- Contained Unit
- t
- Cutoff Grade
- 0.1
- Cutoff Unit
- % Rb2O
Prior Estimate
- Resource Date
- 2026-05-19
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-05-19T00:00:00.000Z
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The re-stated Inferred resource for rubidium indicates further potential, though with lower confidence and reduced novelty.
Positive factors
- Inferred resource adds to the overall project scale and future potential.
- Grade of 0.22% Rb2O is a good grade for rubidium.
Negative factors
- This is a re-statement of a prior MRE, reducing its novelty.
Evidence · table
“0.22”
Context: 1.5
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredMt Edon Critical Minerals Project · rubidiumTonnes: 4300000Grade: 0.23Grade Unit: %Contained Metal: 9800Contained Unit: tHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Mt Edon Critical Minerals Project
- Commodity
- rubidium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- EMC
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Bahman Rashidi
- Resource group id
- resource:8fd371e7059f6a0c8464
- Deposit or zone
- Mt Edon
Resource Data
- Category
- inferred
- Tonnes
- 4300000
- Grade
- 0.23
- Grade Unit
- %
- Contained Metal
- 9800
- Contained Unit
- t
- Cutoff Grade
- 0.1
- Cutoff Unit
- % Rb2O
Prior Estimate
- Resource Date
- 2026-05-19
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-05-19T00:00:00.000Z
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The re-stated total rubidium resource highlights the project's scale and potential, despite being historical.
Positive factors
- Total resource of 4.3 Mt at 0.23% Rb2O represents a significant rubidium endowment.
- Amenability to open pit mining suggests favorable extraction economics.
Negative factors
- This is a re-statement of a prior MRE, reducing its novelty.
Evidence · table
“0.23”
Context: 4.3
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedMt Edon Critical Minerals Project · lithiumTonnes: 2700000Grade: 0.11Grade Unit: %Contained Metal: 2900Contained Unit: tHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Mt Edon Critical Minerals Project
- Commodity
- lithium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- EMC
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Bahman Rashidi
- Resource group id
- resource:8154f2c4e441183137ef
- Deposit or zone
- Mt Edon
Resource Data
- Category
- indicated
- Tonnes
- 2700000
- Grade
- 0.11
- Grade Unit
- %
- Contained Metal
- 2900
- Contained Unit
- t
- Cutoff Grade
- 0.1
- Cutoff Unit
- % Rb2O
Prior Estimate
- Resource Date
- 2026-05-19
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-05-19T00:00:00.000Z
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The re-stated Indicated lithium resource adds byproduct value, though it is historical and lower grade than primary lithium projects.
Positive factors
- Indicated resource for lithium provides additional value to the project.
- Grade of 0.11% Li2O is a byproduct grade, but still contributes to overall economics.
Negative factors
- This is a re-statement of a prior MRE, reducing its novelty.
Evidence · table
“0.11”
Context: 2.7
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredMt Edon Critical Minerals Project · lithiumTonnes: 1500000Grade: 0.09Grade Unit: %Contained Metal: 1500Contained Unit: tHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Mt Edon Critical Minerals Project
- Commodity
- lithium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- EMC
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Bahman Rashidi
- Resource group id
- resource:5ed379a72ec6928adeb1
- Deposit or zone
- Mt Edon
Resource Data
- Category
- inferred
- Tonnes
- 1500000
- Grade
- 0.09
- Grade Unit
- %
- Contained Metal
- 1500
- Contained Unit
- t
- Cutoff Grade
- 0.1
- Cutoff Unit
- % Rb2O
Prior Estimate
- Resource Date
- 2026-05-19
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-05-19T00:00:00.000Z
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The re-stated Inferred lithium resource adds to the project's overall contained metal, but with lower confidence and novelty.
Positive factors
- Inferred resource for lithium contributes to the overall project scale.
- Grade of 0.09% Li2O provides additional byproduct potential.
Negative factors
- This is a re-statement of a prior MRE, reducing its novelty.
Evidence · table
“0.09”
Context: 1.5
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredMt Edon Critical Minerals Project · lithiumTonnes: 4300000Grade: 0.1Grade Unit: %Contained Metal: 4400Contained Unit: tHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Mt Edon Critical Minerals Project
- Commodity
- lithium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- EMC
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Bahman Rashidi
- Resource group id
- resource:8fd371e7059f6a0c8464
- Deposit or zone
- Mt Edon
Resource Data
- Category
- inferred
- Tonnes
- 4300000
- Grade
- 0.1
- Grade Unit
- %
- Contained Metal
- 4400
- Contained Unit
- t
- Cutoff Grade
- 0.1
- Cutoff Unit
- % Rb2O
Prior Estimate
- Resource Date
- 2026-05-19
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-05-19T00:00:00.000Z
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The re-stated total lithium resource contributes to the project's overall value proposition, despite being historical.
Positive factors
- Total lithium resource of 4.3 Mt at 0.10% Li2O adds significant byproduct value to the project.
- Amenability to open pit mining suggests favorable extraction economics.
Negative factors
- This is a re-statement of a prior MRE, reducing its novelty.
Evidence · table
“0.10”
Context: 4.3
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedRevere Gold Project · goldTonnes: 6380000Grade: 0.57Grade Unit: g/tContained Metal: 116520Contained Unit: ozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Revere Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- EMC
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Adriaan du Toit
- Resource group id
- resource:0ad7546ca42da060d3e8
- Deposit or zone
- Big John
Resource Data
- Category
- indicated
- Tonnes
- 6380000
- Grade
- 0.57
- Grade Unit
- g/t
- Contained Metal
- 116520
- Contained Unit
- oz
- Cutoff Grade
- 0.1
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-05-14T00:00:00.000Z
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The re-stated Indicated resource for Big John provides a solid foundation for the project, despite being historical.
Positive factors
- Indicated resource provides reasonable confidence for project planning.
- Grade of 0.57 g/t Au is moderate for an open-pit gold project.
Negative factors
- This is a re-statement of a prior MRE, reducing its novelty.
Evidence · table
“0.57”
Context: 6.38
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredRevere Gold Project · goldTonnes: 6620000Grade: 0.53Grade Unit: g/tContained Metal: 111787Contained Unit: ozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Revere Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- EMC
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Adriaan du Toit
- Resource group id
- resource:738aee201fc9ea74634f
- Deposit or zone
- Big John
Resource Data
- Category
- inferred
- Tonnes
- 6620000
- Grade
- 0.53
- Grade Unit
- g/t
- Contained Metal
- 111787
- Contained Unit
- oz
- Cutoff Grade
- 0.1
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-05-14T00:00:00.000Z
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The re-stated Inferred resource for Big John indicates further potential, though with lower confidence and reduced novelty.
Positive factors
- Inferred resource adds to the overall project scale and future potential.
- Grade of 0.53 g/t Au is moderate for an open-pit gold project.
Negative factors
- This is a re-statement of a prior MRE, reducing its novelty.
Evidence · table
“0.53”
Context: 6.62
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredRevere Gold Project · goldTonnes: 13000000Grade: 0.55Grade Unit: g/tContained Metal: 228307Contained Unit: ozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Revere Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- EMC
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Adriaan du Toit
- Resource group id
- resource:f217ee7dcb2a1acdfcbc
- Deposit or zone
- Big John
Resource Data
- Category
- inferred
- Tonnes
- 13000000
- Grade
- 0.55
- Grade Unit
- g/t
- Contained Metal
- 228307
- Contained Unit
- oz
- Cutoff Grade
- 0.1
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-05-14T00:00:00.000Z
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The re-stated total resource for Big John highlights the project's scale and potential, despite being historical.
Positive factors
- Total resource for Big John of 13.0 Mt at 0.55 g/t Au represents a significant gold endowment.
- The resource is amenable to open pit mining.
Negative factors
- This is a re-statement of a prior MRE, reducing its novelty.
Evidence · table
“0.55”
Context: 13.0
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredRevere Gold Project · goldTonnes: 2010000Grade: 0.5Grade Unit: g/tContained Metal: 32307Contained Unit: ozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Revere Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- EMC
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Adriaan du Toit
- Resource group id
- resource:d10dcc1252adba30c25d
- Deposit or zone
- Armstrong
Resource Data
- Category
- inferred
- Tonnes
- 2010000
- Grade
- 0.5
- Grade Unit
- g/t
- Contained Metal
- 32307
- Contained Unit
- oz
- Cutoff Grade
- 0.1
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-05-14T00:00:00.000Z
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The re-stated Inferred resource for Armstrong indicates further potential, though with lower confidence and reduced novelty.
Positive factors
- Inferred resource for Armstrong adds to the overall project scale and future potential.
- Grade of 0.50 g/t Au is moderate for an open-pit gold project.
Negative factors
- This is a re-statement of a prior MRE, reducing its novelty.
Evidence · table
“0.50”
Context: 2.01
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredRevere Gold Project · goldTonnes: 2010000Grade: 0.5Grade Unit: g/tContained Metal: 32307Contained Unit: ozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Revere Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- EMC
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Adriaan du Toit
- Resource group id
- resource:d10dcc1252adba30c25d
- Deposit or zone
- Armstrong
Resource Data
- Category
- inferred
- Tonnes
- 2010000
- Grade
- 0.5
- Grade Unit
- g/t
- Contained Metal
- 32307
- Contained Unit
- oz
- Cutoff Grade
- 0.1
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-05-14T00:00:00.000Z
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The re-stated total Inferred resource for Armstrong adds to the project's overall contained metal, but with lower confidence and novelty.
Positive factors
- Total Inferred resource for Armstrong contributes to the overall project scale.
- Grade of 0.50 g/t Au is moderate for an open-pit gold project.
Negative factors
- This is a re-statement of a prior MRE, reducing its novelty.
Evidence · table
“0.50”
Context: 2.01
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredRevere Gold Project · goldTonnes: 15000000Grade: 0.54Grade Unit: g/tContained Metal: 260781Contained Unit: ozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Revere Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- EMC
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Adriaan du Toit
- Resource group id
- resource:486c916f3e6b3ac01bef
- Deposit or zone
- Grand Total
Resource Data
- Category
- inferred
- Tonnes
- 15000000
- Grade
- 0.54
- Grade Unit
- g/t
- Contained Metal
- 260781
- Contained Unit
- oz
- Cutoff Grade
- 0.1
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-05-14T00:00:00.000Z
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The re-stated Grand Total resource highlights the project's overall scale and potential, despite being historical.
Positive factors
- Grand Total resource of 15.0 Mt at 0.54 g/t Au represents a significant gold endowment.
- The resource is amenable to open pit mining.
Negative factors
- This is a re-statement of a prior MRE, reducing its novelty.
Evidence · table
“0.54”
Context: 15.0
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Fact 21Revere Gold ProjectView all detailsHide details
Identity
- Project
- Revere Gold Project
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- EMC
Resource scope
- Resource group id
- resource:46e0bef2e0d8e98155da
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: Commencement of a Scoping Study is a positive step in advancing the project's economic evaluation and development planning.
Positive factors
- Appointment of Como Engineers for a Scoping Study indicates progress towards defining potential development pathways.
- The study will provide a technical framework for further evaluation, aiding future decision-making.
Evidence · text
“Como Engineers appointed to undertake a Scoping Study based on the existing 260,780oz gold Mineral Resource1, with completion targeted for the March quarter of 2027”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
Metallurgical Results (3)
batch roasting and leachingMt Edon Critical Minerals Project · rubidiumRecovery: 90 %View all detailsHide details
Identity
- Project
- Mt Edon Critical Minerals Project
- Commodity
- rubidium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- EMC
Test Work
- Program Status
- detailed
- Test Type
- batch roasting and leaching
- Processing Route
- Batch roasting and leaching
- Sample
- Batch roasting and leaching testwork
Recovery
- Recovery
- 90 %
- Recovery Basis
- actual_test
Lab
- Laboratory
- Edith Cowan University (ECU)
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The high recovery and process improvements in batch testwork are very positive for the project's metallurgical viability.
Positive factors
- High rubidium extraction efficiency of 90% achieved in batch testwork, indicating promising metallurgical characteristics.
- Process optimization reduced solution volumes by 60% and enabled ambient-temperature leaching, improving process efficiency and cost.
Evidence · text
“Batch roasting and leaching testwork achieved rubidium extraction efficiencies of up to 90%”
Tags used in scoring
POX/BIOX Routeneutral
Pressure or bio-oxidation for refractory ore — high CAPEX and OPEX.
Why it applies: processing_route matches the pox_biox signal
continuous rotary-kiln trialsMt Edon Critical Minerals Project · rubidiumRecovery: 50 %View all detailsHide details
Identity
- Project
- Mt Edon Critical Minerals Project
- Commodity
- rubidium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- EMC
Test Work
- Program Status
- optimization
- Test Type
- continuous rotary-kiln trials
- Processing Route
- continuous rotary-kiln
- Sample
- Initial continuous rotary-kiln trials
Recovery
- Recovery
- 50 %
- Recovery Basis
- actual_test
Lab
- Laboratory
- Edith Cowan University (ECU)
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The lower recovery in continuous trials and the need for further optimization indicate that the process is still in early development stages and presents a risk.
Negative factors
- Lower recovery of 50% in initial continuous rotary-kiln trials compared to batch testwork, indicating challenges in scaling up the process.
- Further optimization is required, suggesting the process is not yet fully developed or stable.
Evidence · text
“Initial continuous rotary-kiln trials achieved variable extraction efficiencies of 50–60%”
continuous rotary-kiln trialsMt Edon Critical Minerals Project · rubidiumRecovery: 60 %View all detailsHide details
Identity
- Project
- Mt Edon Critical Minerals Project
- Commodity
- rubidium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- EMC
Test Work
- Program Status
- optimization
- Test Type
- continuous rotary-kiln trials
- Processing Route
- continuous rotary-kiln
- Sample
- Initial continuous rotary-kiln trials
Recovery
- Recovery
- 60 %
- Recovery Basis
- actual_test
Lab
- Laboratory
- Edith Cowan University (ECU)
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The variable and lower recovery in continuous trials, along with the need for optimization, highlights the early stage of process development and associated risks.
Negative factors
- Variable extraction efficiencies in initial continuous rotary-kiln trials, indicating process instability or variability.
- Further optimization is required, suggesting the process is not yet fully developed or stable.
Evidence · text
“Initial continuous rotary-kiln trials achieved variable extraction efficiencies of 50–60%”
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.