# EMA: Quarterly Activity and Cashflow Report

Canonical Atlas analysis: https://atlas-aws.minestarters.com/news/ema-quarterly-activity-and-cashflow-report--55e3bc9f-0a7c-43f5-b6a7-3e91193d1e87

Original source: https://www.asx.com.au/asx/v2/statistics/displayAnnouncement.do?display=pdf&idsId=03159936

Publisher: asx

Original announcement: 2026-10-29T22:33:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-10-29T23:45:51.933Z

Atlas analysis updated: 2026-10-29T23:45:51.933Z

- Company: Eminence Minerals Limited

- Ticker: EMA

- Exchange: ASX

- Region: Côte d’Ivoire

- Primary commodity: Unavailable

- Secondary commodities: None reported

- Document categories: Agreement transaction, Permitting, Other, Resource update, Drill results

- Extracted: 2026-10-29 23:34:07 UTC

Narrative sentiment: 0.30 · Bullish

## Minestarters Atlas summary

Eminence Minerals Limited reported on its quarterly activities, highlighting the expansion of its gold exploration portfolio in Côte d’Ivoire through exclusive option agreements. The company also provided updates on ongoing rare earth exploration at its Campo Grande and Tayra projects in Brazil, including the granting of new exploration licenses. Additionally, a judicial review decision is pending for the Hamersley Iron Ore Project in Western Australia, and the company completed a non-core asset divestment.

Reasoning: Eminence Minerals significantly expanded its gold exploration portfolio in Côte d'Ivoire through new option agreements and reported progress on its rare earth projects in Brazil with granted licenses and ongoing exploration. However, a judicial review decision for the Hamersley Iron Ore Project remains pending, and no new assay results were disclosed for current drilling activities.

- Positive factor: Significant expansion of gold exploration portfolio in Côte d'Ivoire through option agreements.

- Positive factor: Non-dilutive funding secured from the divestment of a non-core asset.

- Positive factor: New exploration licenses granted for the Tayra Rare Earth Project in Brazil.

- Positive factor: Ongoing exploration activities at Campo Grande Rare Earth Project.

- Negative factor: Judicial review decision pending for the Hamersley Iron Ore Project, creating uncertainty.

- Negative factor: No new assay results reported for current drilling programs at Campo Grande or Tayra.

- Negative factor: Shareholder approval still required for Tranche 2 of the placement and director participation.

Facts used in scoring: 7

## Classification and evidence

No classification tags are available.

## Extracted facts

Stored fact records: 2. Some facts used in scoring do not have a stored record.

## Drill Results (1)

### CG\_RC24\_031

[Link to this fact](https://atlas-aws.minestarters.com/news/ema-quarterly-activity-and-cashflow-report--55e3bc9f-0a7c-43f5-b6a7-3e91193d1e87#fact-drill-facts-4)

Campo Grande Rare Earth · rare earth elements

Historical result

Needs review: historical\_restatement

#### Identity

- Hole ID: CG\_RC24\_031
- Project: Campo Grande Rare Earth
- Commodity: rare earth elements
- Region: brazil
- Reported Region: brazil
- Ticker: EMA

#### Geometry

- Grade: 3691
- Grade Unit: ppm TREO
- Intercept: 12 m

#### Classification

- Sample Type: drill

#### QA/QC

- QA/QC Methods: standards

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Interp. Status: scored
- Historical: Yes
- Historical Source Date: 2025-10-22T00:00:00.000Z

#### Dates

- Event date: 2026-10-29T00:00:00.000Z

Reasoning: The drill result for hole CG\_RC24\_031 is a restatement of a historical assay from October 2025 and is below the project's best reported grade, offering no new information.

- Negative factor: This is a restatement of a historical drill result, not a new assay.

- Negative factor: The grade is lower than the project's best historical grade \(4335 ppm TREO\).

Evidence · text

> including 12 m at 3,691 ppm TREO recorded in drill hole CG\_RC24\_031 \(Refer ASX announcement dated 22 October 2025\).

#### Tags used in scoring

**No QA/QC Disclosure**

Polarity: negative

Definition: Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc\_disclosed is not true

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

#### Rejected tags

**Stale Data Re-release** — Rejected; excluded from scoring

Polarity: negative

Definition: Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Reason: The drill result is a restatement of a previously reported figure from October 2025.

Evidence · text

> including 12 m at 3,691 ppm TREO recorded in drill hole CG\_RC24\_031 \(Refer ASX announcement dated 22 October 2025\).

## Resource Estimates (1)

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/ema-quarterly-activity-and-cashflow-report--55e3bc9f-0a7c-43f5-b6a7-3e91193d1e87#fact-resource-facts-3)

Hamersley Iron Ore Project · iron\_ore

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Hamersley Iron Ore Project
- Commodity: iron\_ore
- Region: australia\_wa
- Reported Region: Pilbara, Western Australia
- Ticker: EMA

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- Resource group id: resource:5fa8fb5cd63f599dc57f

#### Resource Data

- Category: inferred
- Tonnes: 108500000
- Grade: 58
- Grade Unit: %

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2024-06-06T00:00:00.000Z

#### Dates

- Event date: 2026-10-29T00:00:00.000Z

Reasoning: The stated Inferred Mineral Resource for the Hamersley Iron Ore Project is a restatement of a previously reported estimate, indicating no new information or changes.

- Negative factor: This is a restatement of a prior resource estimate, not a new update.

Evidence · text

> The Hamersley Iron Ore Project contains a current Direct Shipping Ore \(“DSO”\) Inferred Mineral Resource of 108.5 million tonnes at 58% Fe within its broader resource

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**Stale Estimate**

Polarity: negative

Definition: Effective date is &gt;2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.4 years before this release

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
