# DTR: Annual Report to shareholders

Canonical Atlas analysis: https://atlas-aws.minestarters.com/news/dtr-annual-report-to-shareholders--a9dbb28b-25e7-4f79-9fa6-2b1ef861efe2

Original source: https://www.asx.com.au/asx/v2/statistics/displayAnnouncement.do?display=pdf&idsId=03159368

Publisher: asx

Original announcement: 2026-10-29T05:07:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-10-29T06:16:07.257Z

Atlas analysis updated: 2026-10-29T06:16:07.257Z

- Company: Dateline Resources Limited

- Ticker: DTR

- Exchange: ASX

- Region: California, USA

- Primary commodity: Gold

- Secondary commodities: Rare earths, Strontium

- Document categories: Other, Resource update, Capital raise, Drill results

- Extracted: 2026-10-29 06:10:28 UTC

Narrative sentiment: 0.00 · Neutral

## Minestarters Atlas summary

Dateline Resources Limited's annual report highlights the completion of a Bankable Feasibility Study for its Colosseum Gold and Rare Earths Project, defining strong economics and a maiden Ore Reserve. The company also advanced rare earth exploration at Colosseum and Music Valley, and secured significant capital through placements. However, operations at Colosseum were halted post-year-end due to a preliminary injunction from legal proceedings, creating uncertainty for the project's immediate future.

Reasoning: The annual report details strong economic results from the Colosseum BFS and a maiden Ore Reserve, supported by significant capital raises, but these positives are overshadowed by a post-year-end legal injunction that has halted operations at the flagship project.

- Positive factor: Strong BFS economics for Colosseum Gold Project

- Positive factor: Maiden JORC 2012 Ore Reserve reported

- Positive factor: Successful institutional capital raises

- Positive factor: Expansion into heavy rare earths and strontium projects

- Negative factor: Legal injunction halting operations at Colosseum Gold Project

- Negative factor: Uncertainty regarding project restart timeline

- Negative factor: Passing of long-serving Chairman

Facts used in scoring: 19

## Classification and evidence

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: The resource and reserve estimates are explicitly stated as JORC 2012 compliant.

Evidence · text

> reported a maiden JORC 2012 Ore Reserve

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: The resource and reserve estimates are signed off by named Competent Persons \(Simon Tear and John Wyche\) under the JORC Code 2012.

Evidence · text

> The data relating to the Colosseum Mineral Resource Estimate was evaluated by Mr Simon Tear, MAusIMM, a Director of H&amp;S Consultants Pty Ltd. The data relating to the Colosseum Ore Reserve Estimate was based on work conducted or supervised by Mr John Wyche, FAusIMM and Chartered Professional, a Director of Australian Mine Design and Development Pty Ltd. Each was identified in the 11 May 2026 BFS announcement as a Competent Person under the JORC Code 2012 and consented to inclusion of the relevant information in the form and context in which it appeared.

**Maiden Resource**

Polarity: neutral

Definition: First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: The document refers to a 'maiden JORC 2012 Ore Reserve'.

Evidence · text

> reported a maiden JORC 2012 Ore Reserve

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The Mineral Resource Estimate includes an Inferred category of 12.4 Mt at 0.57 g/t Au.

Evidence · table

> Inferred

Context: 12.4

**All Inferred**

Polarity: negative

Definition: 100% of resource is Inferred category — very early stage, no engineering confidence.

Why it applies: The Mineral Resource Estimate is not 100% Inferred, with Measured and Indicated categories also present.

Evidence · table

> Inferred

Context: 12.4

**Stale Data Re-release**

Polarity: negative

Story-specific tag

Definition: Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are 'Selected FY2026 Colosseum gold drill intersections' and refer to prior ASX announcements, indicating they are historical results being re-summarized.

Evidence · text

> Table 2: Selected FY2026 Colosseum gold drill intersections

**Apparent Width Only**

Polarity: negative

Story-specific tag

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: The drill intersections are reported as 'downhole lengths' with no mention of true width.

Evidence · text

> Intercepts are downhole lengths.

## Extracted facts

Stored fact records: 11. Some facts used in scoring do not have a stored record.

## Drill Results (6)

### RC25-035

[Link to this fact](https://atlas-aws.minestarters.com/news/dtr-annual-report-to-shareholders--a9dbb28b-25e7-4f79-9fa6-2b1ef861efe2#fact-drill-facts-6)

Colosseum Gold and Rare Earths · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Hole ID: RC25-035
- Project: Colosseum Gold and Rare Earths
- Commodity: gold
- Region: california, usa
- Reported Region: california, usa
- Ticker: DTR

#### Geometry

- Grade: 1.04
- Grade Unit: g/t
- Intercept: 295.64 m
- From: 0 m
- To: 295.64 m
- Intercept Depth: 0 m

#### Classification

- Sample Type: drill
- Group ID: RC25-035:0-295.64

#### QA/QC

- QA/QC Disclosed: Yes
- QA/QC Methods: standards, blanks

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Interp. Status: scored
- Historical: Yes
- Historical Source Date: 2025-12-15T00:00:00.000Z

#### Dates

- Event date: 2026-10-29T00:00:00.000Z

Reasoning: This historical drill result shows a wide gold intersection extending the North Pit mineralization, but it is not new information and project operations are currently halted.

- Positive factor: Wide gold intersection

- Positive factor: Extends North Pit mineralization

- Negative factor: Historical data, not new assays

- Negative factor: Project operations currently halted

Evidence · table

> 1.04

Context: 295.64

#### Tags used in scoring

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: qaqc\_disclosed is true

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**Stale Data Re-release**

Polarity: negative

Definition: Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: the fact restates a prior release

### RC25-037

[Link to this fact](https://atlas-aws.minestarters.com/news/dtr-annual-report-to-shareholders--a9dbb28b-25e7-4f79-9fa6-2b1ef861efe2#fact-drill-facts-7)

Colosseum Gold and Rare Earths · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Hole ID: RC25-037
- Project: Colosseum Gold and Rare Earths
- Commodity: gold
- Region: california, usa
- Reported Region: california, usa
- Ticker: DTR

#### Geometry

- Grade: 1.24
- Grade Unit: g/t
- Intercept: 105.15 m
- From: 0 m
- To: 105.15 m
- Intercept Depth: 0 m

#### Classification

- Sample Type: drill
- Group ID: RC25-037:0-105.15

#### QA/QC

- QA/QC Disclosed: Yes
- QA/QC Methods: standards, blanks

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Interp. Status: scored
- Historical: Yes
- Historical Source Date: 2025-12-15T00:00:00.000Z

#### Dates

- Event date: 2026-10-29T00:00:00.000Z

Reasoning: This historical drill result shows a wide gold intersection extending the North Pit mineralization, but it is not new information and project operations are currently halted.

- Positive factor: Wide gold intersection

- Positive factor: Extends North Pit mineralization

- Negative factor: Historical data, not new assays

- Negative factor: Project operations currently halted

Evidence · table

> 1.24

Context: 105.15

#### Tags used in scoring

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: qaqc\_disclosed is true

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**Stale Data Re-release**

Polarity: negative

Definition: Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: the fact restates a prior release

### CM25-41

[Link to this fact](https://atlas-aws.minestarters.com/news/dtr-annual-report-to-shareholders--a9dbb28b-25e7-4f79-9fa6-2b1ef861efe2#fact-drill-facts-8)

Colosseum Gold and Rare Earths · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Hole ID: CM25-41
- Project: Colosseum Gold and Rare Earths
- Commodity: gold
- Region: california, usa
- Reported Region: california, usa
- Ticker: DTR

#### Geometry

- Grade: 1.05
- Grade Unit: g/t
- Intercept: 287.3 m
- From: 0 m
- To: 287.3 m
- Intercept Depth: 0 m

#### Classification

- Sample Type: drill
- Group ID: CM25-41:0-287.3

#### QA/QC

- QA/QC Disclosed: Yes
- QA/QC Methods: standards, blanks

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Interp. Status: scored
- Historical: Yes
- Historical Source Date: 2025-12-15T00:00:00.000Z

#### Dates

- Event date: 2026-10-29T00:00:00.000Z

Reasoning: This historical drill result shows a wide gold intersection extending mineralization beyond the resource envelope, but it is not new information and project operations are currently halted.

- Positive factor: Wide gold intersection

- Positive factor: Extends mineralization beyond resource envelope

- Negative factor: Historical data, not new assays

- Negative factor: Project operations currently halted

Evidence · table

> 1.05

Context: 287.3

#### Tags used in scoring

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: qaqc\_disclosed is true

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**Stale Data Re-release**

Polarity: negative

Definition: Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: the fact restates a prior release

### CM25-41

[Link to this fact](https://atlas-aws.minestarters.com/news/dtr-annual-report-to-shareholders--a9dbb28b-25e7-4f79-9fa6-2b1ef861efe2#fact-drill-facts-9)

Colosseum Gold and Rare Earths · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Hole ID: CM25-41
- Project: Colosseum Gold and Rare Earths
- Commodity: gold
- Region: california, usa
- Reported Region: california, usa
- Ticker: DTR

#### Geometry

- Grade: 6.13
- Grade Unit: g/t
- Intercept: 17.7 m

#### Classification

- Sample Type: drill

#### QA/QC

- QA/QC Disclosed: Yes
- QA/QC Methods: standards, blanks

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Interp. Status: scored
- Historical: Yes
- Historical Source Date: 2025-12-15T00:00:00.000Z

#### Dates

- Event date: 2026-10-29T00:00:00.000Z

Reasoning: This historical high-grade sub-interval indicates significant gold mineralization, but it is not new information, from/to depths are not specified, and project operations are currently halted.

- Positive factor: High-grade sub-interval

- Positive factor: Extends mineralization beyond resource envelope

- Negative factor: Historical data, not new assays

- Negative factor: Project operations currently halted

- Negative factor: From/to depths not specified for sub-interval

Evidence · text

> includes 17.7m @ 6.13g/t Au

#### Tags used in scoring

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: qaqc\_disclosed is true

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**Stale Data Re-release**

Polarity: negative

Definition: Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: the fact restates a prior release

### CM26-42

[Link to this fact](https://atlas-aws.minestarters.com/news/dtr-annual-report-to-shareholders--a9dbb28b-25e7-4f79-9fa6-2b1ef861efe2#fact-drill-facts-10)

Colosseum Gold and Rare Earths · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Hole ID: CM26-42
- Project: Colosseum Gold and Rare Earths
- Commodity: gold
- Region: california, usa
- Reported Region: california, usa
- Ticker: DTR

#### Geometry

- Grade: 1.06
- Grade Unit: g/t
- Intercept: 214 m
- From: 0 m
- To: 214 m
- Intercept Depth: 0 m

#### Classification

- Sample Type: drill
- Group ID: CM26-42:0-214

#### QA/QC

- QA/QC Disclosed: Yes
- QA/QC Methods: standards, blanks

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Interp. Status: scored
- Historical: Yes
- Historical Source Date: 2025-12-15T00:00:00.000Z

#### Dates

- Event date: 2026-10-29T00:00:00.000Z

Reasoning: This historical drill result shows a wide gold intersection extending mineralization beyond the resource envelope, but it is not new information and project operations are currently halted.

- Positive factor: Wide gold intersection

- Positive factor: Extends mineralization beyond resource envelope

- Negative factor: Historical data, not new assays

- Negative factor: Project operations currently halted

Evidence · table

> 1.06

Context: 214.0

#### Tags used in scoring

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: qaqc\_disclosed is true

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**Stale Data Re-release**

Polarity: negative

Definition: Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: the fact restates a prior release

### CM26-42

[Link to this fact](https://atlas-aws.minestarters.com/news/dtr-annual-report-to-shareholders--a9dbb28b-25e7-4f79-9fa6-2b1ef861efe2#fact-drill-facts-11)

Colosseum Gold and Rare Earths · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Hole ID: CM26-42
- Project: Colosseum Gold and Rare Earths
- Commodity: gold
- Region: california, usa
- Reported Region: california, usa
- Ticker: DTR

#### Geometry

- Grade: 1.59
- Grade Unit: g/t
- Intercept: 87.9 m

#### Classification

- Sample Type: drill

#### QA/QC

- QA/QC Disclosed: Yes
- QA/QC Methods: standards, blanks

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Interp. Status: scored
- Historical: Yes
- Historical Source Date: 2025-12-15T00:00:00.000Z

#### Dates

- Event date: 2026-10-29T00:00:00.000Z

Reasoning: This historical high-grade sub-interval indicates significant gold mineralization, but it is not new information, from/to depths are not specified, and project operations are currently halted.

- Positive factor: High-grade sub-interval

- Positive factor: Extends mineralization beyond resource envelope

- Negative factor: Historical data, not new assays

- Negative factor: Project operations currently halted

- Negative factor: From/to depths not specified for sub-interval

Evidence · text

> includes 87.9m @ 1.59g/t Au

#### Tags used in scoring

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: qaqc\_disclosed is true

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**Stale Data Re-release**

Polarity: negative

Definition: Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: the fact restates a prior release

## Resource Estimates (5)

### measured

[Link to this fact](https://atlas-aws.minestarters.com/news/dtr-annual-report-to-shareholders--a9dbb28b-25e7-4f79-9fa6-2b1ef861efe2#fact-resource-facts-1)

Colosseum Gold Project · gold

#### Identity

- Project: Colosseum Gold Project
- Commodity: gold
- Region: california, usa
- Reported Region: California, USA
- Ticker: DTR

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Simon Tear, John Wyche
- Resource group id: resource:65b18e9a34aaa3b9446d

#### Resource Data

- Category: measured
- Tonnes: 17500000
- Grade: 1
- Grade Unit: g/t
- Contained Metal: 560
- Contained Unit: koz
- Cutoff Grade: 0.25
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-06-30

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-29T00:00:00.000Z

Reasoning: The Measured Mineral Resource provides a high-confidence estimate for the Colosseum project, forming a strong basis for future development.

- Positive factor: High confidence Measured category

- Positive factor: JORC compliant

- Positive factor: QP signed

Evidence · table

> 1.00

Context: 17.5

#### Tags used in scoring

**Measured Resource**

Polarity: positive

Definition: Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/dtr-annual-report-to-shareholders--a9dbb28b-25e7-4f79-9fa6-2b1ef861efe2#fact-resource-facts-2)

Colosseum Gold Project · gold

#### Identity

- Project: Colosseum Gold Project
- Commodity: gold
- Region: california, usa
- Reported Region: California, USA
- Ticker: DTR

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Simon Tear, John Wyche
- Resource group id: resource:8b02d74d0ff60efc33f6

#### Resource Data

- Category: indicated
- Tonnes: 14600000
- Grade: 0.62
- Grade Unit: g/t
- Contained Metal: 290
- Contained Unit: koz
- Cutoff Grade: 0.25
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-06-30

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-29T00:00:00.000Z

Reasoning: The Indicated Mineral Resource adds to the confidence in the Colosseum project's resource base, supporting further study and development.

- Positive factor: Good confidence Indicated category

- Positive factor: JORC compliant

- Positive factor: QP signed

Evidence · table

> 0.62

Context: 14.6

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/dtr-annual-report-to-shareholders--a9dbb28b-25e7-4f79-9fa6-2b1ef861efe2#fact-resource-facts-3)

Colosseum Gold Project · gold

#### Identity

- Project: Colosseum Gold Project
- Commodity: gold
- Region: california, usa
- Reported Region: California, USA
- Ticker: DTR

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Simon Tear, John Wyche
- Resource group id: resource:76294f8490ea38263df0

#### Resource Data

- Category: inferred
- Tonnes: 12400000
- Grade: 0.57
- Grade Unit: g/t
- Contained Metal: 230
- Contained Unit: koz
- Cutoff Grade: 0.25
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-06-30

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-29T00:00:00.000Z

Reasoning: The Inferred Mineral Resource indicates additional potential for the Colosseum project, though it requires further drilling to upgrade confidence.

- Positive factor: Adds to overall resource potential

- Positive factor: JORC compliant

- Positive factor: QP signed

- Negative factor: Lower confidence Inferred category

Evidence · table

> 0.57

Context: 12.4

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

### proven

[Link to this fact](https://atlas-aws.minestarters.com/news/dtr-annual-report-to-shareholders--a9dbb28b-25e7-4f79-9fa6-2b1ef861efe2#fact-resource-facts-4)

Colosseum Gold Project · gold

#### Identity

- Project: Colosseum Gold Project
- Commodity: gold
- Region: california, usa
- Reported Region: California, USA
- Ticker: DTR

#### Resource scope

- Estimate type: reserve
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Simon Tear, John Wyche
- Resource group id: resource:cffa296895b7e7667170

#### Resource Data

- Category: proven
- Tonnes: 14100000
- Grade: 1.06
- Grade Unit: g/t
- Contained Metal: 480000
- Contained Unit: oz

#### Prior Estimate

- Resource Date: 2026-06-30

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-29T00:00:00.000Z

Reasoning: The Proved Ore Reserve represents a high-confidence, economically viable portion of the Colosseum project, underpinning the Bankable Feasibility Study.

- Positive factor: High confidence Proved Reserve

- Positive factor: JORC compliant

- Positive factor: QP signed

- Positive factor: Forms basis for BFS production target

Evidence · table

> 1.06

Context: 14.1

#### Tags used in scoring

**Proven Reserve**

Polarity: positive

Definition: Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

### probable

[Link to this fact](https://atlas-aws.minestarters.com/news/dtr-annual-report-to-shareholders--a9dbb28b-25e7-4f79-9fa6-2b1ef861efe2#fact-resource-facts-5)

Colosseum Gold Project · gold

#### Identity

- Project: Colosseum Gold Project
- Commodity: gold
- Region: california, usa
- Reported Region: California, USA
- Ticker: DTR

#### Resource scope

- Estimate type: reserve
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Simon Tear, John Wyche
- Resource group id: resource:94a44a7bf384f8038fed

#### Resource Data

- Category: probable
- Tonnes: 6500000
- Grade: 0.72
- Grade Unit: g/t
- Contained Metal: 150000
- Contained Unit: oz

#### Prior Estimate

- Resource Date: 2026-06-30

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-29T00:00:00.000Z

Reasoning: The Probable Ore Reserve adds to the economically viable portion of the Colosseum project, supporting the overall production plan outlined in the BFS.

- Positive factor: Economically viable Probable Reserve

- Positive factor: JORC compliant

- Positive factor: QP signed

- Positive factor: Contributes to BFS production target

Evidence · table

> 0.72

Context: 6.5

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
