Summary

Delta Lithium Limited has released positive outcomes from its Scoping Study for the Mt Ida Lithium Project in Western Australia, projecting an 11-year mine life with a post-tax NPV of A$748 million and an IRR of 33%. The study outlines a 1Mtpa whole ore flotation concentrator producing spodumene, lepidolite (with rubidium), and tantalum concentrates, achieving an overall lithium recovery of 73%. The project is underpinned by 73% Measured & Indicated resources over the life of mine and is fully permitted for both open pit and underground mining.

Reasoning: The Scoping Study demonstrates strong economic potential for the Mt Ida Lithium Project with positive NPV, IRR, and a long mine life, supported by a high-confidence resource and multi-product recovery, despite the preliminary nature of the study and future funding requirements.

Positive factors

  • Strong economic metrics with a post-tax NPV of A$748M and IRR of 33%.
  • Project demonstrates a long mine life of 11 years.
  • High confidence resource base with 73% Measured & Indicated material over LOM and 83% in initial 5 years.
  • Recovery of multiple valuable products: spodumene, lepidolite (with rubidium), and tantalum concentrates.
  • Project is fully permitted for both open pit and underground mining.
  • High overall lithium recovery of 73% achieved through Whole Ore Flotation.
  • Rubidium co-product significantly improves project economics and robustness.

Negative factors

  • The Scoping Study has an accuracy of +/- 40% and is not sufficient to support Ore Reserves.
  • The production target includes 27% Inferred Mineral Resources over the life of mine.
  • Further funding will be required to progress the project to development.

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 55

Atlas analysis — Delta Lithium Limited: DLI: Mt Ida Lithium Scoping Study. indicated 170000 tonnes; 73% recovery

Classification and evidence

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: The document is a Scoping Study, which is an early-stage economic assessment.

Evidence · text

“Scoping Study for Mt Ida Lithium Project”

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: The resource estimate includes 490,000 tonnes of Measured category lithium.

Evidence · table

“490,000”

Context: Total Measured

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The resource estimate includes 7,200,000 tonnes of Indicated category lithium.

Evidence · table

“7,200,000”

Context: Total Indicated

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource estimate includes 7,100,000 tonnes of Inferred category lithium.

Evidence · table

“7,100,000”

Context: Total Inferred

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: The Mineral Resource estimate was prepared by Competent Persons Susan Havlin, Olaf Frederickson, Robert Simmons, and Tom Joseph in accordance with JORC Code.

Evidence · text

“The Mineral Resource underpinning the Scoping Study has been prepared by Competent Persons in accordance with the requirements in the JORC Code.”

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The Mineral Resource Estimate is JORC compliant.

Evidence · text

“JORC compliant Mineral Resource Estimate”

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: The cut-off grades for the resource estimate are clearly stated as 0.3% Li2O for open pit and 0.5% Li2O for underground.

Evidence · table

“Cut Off grade used is 0.3% for Open pit and 0.5% Li2O for Underground”

High Recoverypositive

Recovery at or above the exceptional band for the commodity and processing route.

Why it applies: The overall lithium recovery is expected to be 73%, which is strong for a multi-product flotation circuit.

Evidence · text

“overall lithium recovery of approximately 73%”

Multi-Domain Testedpositive

Variability across ore domains (oxide, transition, fresh) has been addressed.

Why it applies: Metallurgical testwork was conducted on five composites and two subsamples, totaling seven different composites.

Evidence · text

“Five composites were generated from drill core from the Mt Ida Lithium project. Two more composites were generated from subsamples taken from the original drill core composites.”

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: The processing route involves a 'Whole Ore Flotation' lithium concentrator.

Evidence · text

“1Mtpa ‘Whole Ore Flotation’ (WOF) lithium concentrator”

Byproduct Commodityneutral

The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: Tantalum and rubidium are recovered as co-products alongside lithium concentrates.

Evidence · text

“recovery to three products: Spodumene Concentrate (SC5.5%), Lepidolite Concentrate (LC3.0% Li2O, 1.8% Rb2O), Tantalum Concentrate (Ta2O5 5%)”

Gravity Routeneutral

Gravity separation forms a material part of the flowsheet.

Why it applies: the document describes a gravity route ("gravity")

Single Domain Onlynegative

Testing limited to one composite or domain — representativeness not established.

Why it applies: only one composite was tested

Extracted facts

Stored fact records: 55. Some facts used in scoring do not have a stored record.

Resource Estimates (51)

indicatedMt Ida · lithiumTonnes: 170000Grade: 0.95Grade Unit: % Li2OContained Metal: 1600Contained Unit: tView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:33b934227cf6a33c313b
Deposit or zone
Sparrow
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
170000
Grade
0.95
Grade Unit
% Li2O
Contained Metal
1600
Contained Unit
t
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Sparrow open pit Indicated resource provides a moderate-grade, moderate-tonnage component to the overall resource with reasonable geological confidence.

Positive factors

  • Indicated category provides reasonable geological confidence.
  • Grade of 0.95% Li2O is economic for open pit lithium.

Evidence · table

“170,000”

Context: Sparrow OP Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedMt Ida · tantalumTonnes: 170000Grade: 287Grade Unit: ppm Ta2O5View all details
Link to this fact

Identity

Project
Mt Ida
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:33b934227cf6a33c313b
Deposit or zone
Sparrow
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
170000
Grade
287
Grade Unit
ppm Ta2O5
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Sparrow open pit Indicated resource includes a moderate tantalum grade, contributing to the polymetallic nature of the deposit.

Positive factors

  • Indicated category provides reasonable geological confidence for tantalum.

Evidence · table

“287”

Context: Sparrow OP Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedMt Ida · rubidiumTonnes: 170000Grade: 0.42Grade Unit: % Rb2OView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
rubidium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:33b934227cf6a33c313b
Deposit or zone
Sparrow
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
170000
Grade
0.42
Grade Unit
% Rb2O
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Sparrow open pit Indicated resource contains a notable rubidium grade, enhancing the overall economic potential of the polymetallic deposit.

Positive factors

  • Indicated category provides reasonable geological confidence for rubidium.
  • Grade of 0.42% Rb2O is significant for a critical mineral.

Evidence · table

“0.42”

Context: Sparrow OP Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedMt Ida · lithiumTonnes: 1100000Grade: 1.05Grade Unit: % Li2OContained Metal: 11000Contained Unit: tView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:0cd54f961ea728ed6751
Deposit or zone
Sparrow
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
1100000
Grade
1.05
Grade Unit
% Li2O
Contained Metal
11000
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Sparrow underground Indicated resource offers a good-grade, moderate-tonnage component with reasonable geological confidence, suitable for underground extraction.

Positive factors

  • Indicated category provides reasonable geological confidence for underground mining.
  • Grade of 1.05% Li2O is economic for underground lithium.

Evidence · table

“1,100,000”

Context: Sparrow UG Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedMt Ida · tantalumTonnes: 1100000Grade: 176Grade Unit: ppm Ta2O5View all details
Link to this fact

Identity

Project
Mt Ida
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:0cd54f961ea728ed6751
Deposit or zone
Sparrow
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
1100000
Grade
176
Grade Unit
ppm Ta2O5
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Sparrow underground Indicated resource includes a moderate tantalum grade, contributing to the overall polymetallic value.

Positive factors

  • Indicated category provides reasonable geological confidence for tantalum in the underground resource.

Evidence · table

“176”

Context: Sparrow UG Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedMt Ida · rubidiumTonnes: 1100000Grade: 0.43Grade Unit: % Rb2OView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
rubidium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:0cd54f961ea728ed6751
Deposit or zone
Sparrow
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
1100000
Grade
0.43
Grade Unit
% Rb2O
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Sparrow underground Indicated resource contains a notable rubidium grade, further enhancing the economic potential of the polymetallic deposit.

Positive factors

  • Indicated category provides reasonable geological confidence for rubidium in the underground resource.
  • Grade of 0.43% Rb2O is significant for a critical mineral.

Evidence · table

“0.43”

Context: Sparrow UG Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida · lithiumTonnes: 1100000Grade: 0.93Grade Unit: % Li2OContained Metal: 10000Contained Unit: tView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:94a5391bc57612dd296e
Deposit or zone
Sparrow
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1100000
Grade
0.93
Grade Unit
% Li2O
Contained Metal
10000
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Sparrow underground Inferred resource provides additional tonnage at an economic grade, but its lower confidence category requires further drilling for conversion and de-risking.

Positive factors

  • Grade of 0.93% Li2O is economic for underground lithium.

Negative factors

  • Inferred category has lower geological confidence and cannot support economic studies alone.

Evidence · table

“1,100,000”

Context: Sparrow UG Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida · tantalumTonnes: 1100000Grade: 141Grade Unit: ppm Ta2O5View all details
Link to this fact

Identity

Project
Mt Ida
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:94a5391bc57612dd296e
Deposit or zone
Sparrow
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1100000
Grade
141
Grade Unit
ppm Ta2O5
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Sparrow underground Inferred resource includes tantalum, but its lower confidence category requires further work.

Negative factors

  • Inferred category has lower geological confidence for tantalum.

Evidence · table

“141”

Context: Sparrow UG Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida · rubidiumTonnes: 1100000Grade: 0.4Grade Unit: % Rb2OView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
rubidium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:94a5391bc57612dd296e
Deposit or zone
Sparrow
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1100000
Grade
0.4
Grade Unit
% Rb2O
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Sparrow underground Inferred resource contains a notable rubidium grade, but its lower confidence category requires further work for de-risking.

Positive factors

  • Grade of 0.40% Rb2O is significant for a critical mineral.

Negative factors

  • Inferred category has lower geological confidence for rubidium.

Evidence · table

“0.40”

Context: Sparrow UG Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredMt Ida · lithiumTonnes: 270000Grade: 1.3Grade Unit: % Li2OContained Metal: 3500Contained Unit: tView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:4e7d4d7be722a6f3ac51
Deposit or zone
Sister Sam
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
270000
Grade
1.3
Grade Unit
% Li2O
Contained Metal
3500
Contained Unit
t
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Sister Sam open pit Measured resource provides a high-confidence, high-grade component, significantly de-risking the early mine plan.

Positive factors

  • Measured category represents the highest confidence in tonnage and grade.
  • Grade of 1.30% Li2O is strong for open pit lithium.

Evidence · table

“270,000”

Context: Sister Sam OP Measured

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredMt Ida · tantalumTonnes: 270000Grade: 268Grade Unit: ppm Ta2O5View all details
Link to this fact

Identity

Project
Mt Ida
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:4e7d4d7be722a6f3ac51
Deposit or zone
Sister Sam
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
270000
Grade
268
Grade Unit
ppm Ta2O5
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Sister Sam open pit Measured resource includes a moderate tantalum grade with high confidence, contributing to the polymetallic value.

Positive factors

  • Measured category provides high confidence for tantalum in the open pit resource.

Evidence · table

“268”

Context: Sister Sam OP Measured

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredMt Ida · rubidiumTonnes: 270000Grade: 0.44Grade Unit: % Rb2OView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
rubidium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:4e7d4d7be722a6f3ac51
Deposit or zone
Sister Sam
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
270000
Grade
0.44
Grade Unit
% Rb2O
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Sister Sam open pit Measured resource contains a notable rubidium grade with high confidence, further enhancing the economic potential of the polymetallic deposit.

Positive factors

  • Measured category provides high confidence for rubidium in the open pit resource.
  • Grade of 0.44% Rb2O is significant for a critical mineral.

Evidence · table

“0.44”

Context: Sister Sam OP Measured

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedMt Ida · lithiumTonnes: 3200000Grade: 1.45Grade Unit: % Li2OContained Metal: 46000Contained Unit: tView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:bb96bbb4a72cd37f138d
Deposit or zone
Sister Sam
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
3200000
Grade
1.45
Grade Unit
% Li2O
Contained Metal
46000
Contained Unit
t
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Sister Sam open pit Indicated resource is a substantial, high-grade component with reasonable geological confidence, significantly contributing to the project's early value.

Positive factors

  • Indicated category provides reasonable geological confidence for open pit mining.
  • Grade of 1.45% Li2O is very strong for open pit lithium.

Evidence · table

“3,200,000”

Context: Sister Sam OP Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedMt Ida · tantalumTonnes: 3200000Grade: 257Grade Unit: ppm Ta2O5View all details
Link to this fact

Identity

Project
Mt Ida
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:bb96bbb4a72cd37f138d
Deposit or zone
Sister Sam
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
3200000
Grade
257
Grade Unit
ppm Ta2O5
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Sister Sam open pit Indicated resource includes a moderate tantalum grade with reasonable confidence, adding to the polymetallic value.

Positive factors

  • Indicated category provides reasonable geological confidence for tantalum in the open pit resource.

Evidence · table

“257”

Context: Sister Sam OP Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedMt Ida · rubidiumTonnes: 3200000Grade: 0.48Grade Unit: % Rb2OView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
rubidium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:bb96bbb4a72cd37f138d
Deposit or zone
Sister Sam
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
3200000
Grade
0.48
Grade Unit
% Rb2O
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Sister Sam open pit Indicated resource contains a very notable rubidium grade with reasonable confidence, significantly enhancing the economic potential of the polymetallic deposit.

Positive factors

  • Indicated category provides reasonable geological confidence for rubidium in the open pit resource.
  • Grade of 0.48% Rb2O is very significant for a critical mineral.

Evidence · table

“0.48”

Context: Sister Sam OP Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida · lithiumTonnes: 82000Grade: 1.07Grade Unit: % Li2OContained Metal: 880Contained Unit: tView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:9bf2a8c7b79a61ba7cef
Deposit or zone
Sister Sam
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
82000
Grade
1.07
Grade Unit
% Li2O
Contained Metal
880
Contained Unit
t
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Sister Sam open pit Inferred resource provides additional tonnage at an economic grade, but its lower confidence category requires further drilling for conversion and de-risking.

Positive factors

  • Grade of 1.07% Li2O is economic for open pit lithium.

Negative factors

  • Inferred category has lower geological confidence and cannot support economic studies alone.

Evidence · table

“82,000”

Context: Sister Sam OP Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida · tantalumTonnes: 82000Grade: 176Grade Unit: ppm Ta2O5View all details
Link to this fact

Identity

Project
Mt Ida
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:9bf2a8c7b79a61ba7cef
Deposit or zone
Sister Sam
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
82000
Grade
176
Grade Unit
ppm Ta2O5
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Sister Sam open pit Inferred resource includes tantalum, but its lower confidence category requires further work.

Negative factors

  • Inferred category has lower geological confidence for tantalum.

Evidence · table

“176”

Context: Sister Sam OP Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida · rubidiumTonnes: 82000Grade: 0.39Grade Unit: % Rb2OView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
rubidium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:9bf2a8c7b79a61ba7cef
Deposit or zone
Sister Sam
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
82000
Grade
0.39
Grade Unit
% Rb2O
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Sister Sam open pit Inferred resource contains a notable rubidium grade, but its lower confidence category requires further work for de-risking.

Positive factors

  • Grade of 0.39% Rb2O is significant for a critical mineral.

Negative factors

  • Inferred category has lower geological confidence for rubidium.

Evidence · table

“0.39”

Context: Sister Sam OP Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedMt Ida · lithiumTonnes: 2000000Grade: 1.38Grade Unit: % Li2OContained Metal: 27000Contained Unit: tView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:0f2b8f1946714e620ac0
Deposit or zone
Sister Sam
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
2000000
Grade
1.38
Grade Unit
% Li2O
Contained Metal
27000
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Sister Sam underground Indicated resource is a substantial, high-grade component with reasonable geological confidence, significantly contributing to the project's long-term value.

Positive factors

  • Indicated category provides reasonable geological confidence for underground mining.
  • Grade of 1.38% Li2O is very strong for underground lithium.

Evidence · table

“2,000,000”

Context: Sister Sam UG Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedMt Ida · tantalumTonnes: 2000000Grade: 166Grade Unit: ppm Ta2O5View all details
Link to this fact

Identity

Project
Mt Ida
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:0f2b8f1946714e620ac0
Deposit or zone
Sister Sam
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
2000000
Grade
166
Grade Unit
ppm Ta2O5
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Sister Sam underground Indicated resource includes a moderate tantalum grade with reasonable confidence, adding to the polymetallic value.

Positive factors

  • Indicated category provides reasonable geological confidence for tantalum in the underground resource.

Evidence · table

“166”

Context: Sister Sam UG Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedMt Ida · rubidiumTonnes: 2000000Grade: 0.45Grade Unit: % Rb2OView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
rubidium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:0f2b8f1946714e620ac0
Deposit or zone
Sister Sam
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
2000000
Grade
0.45
Grade Unit
% Rb2O
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Sister Sam underground Indicated resource contains a very notable rubidium grade with reasonable confidence, significantly enhancing the economic potential of the polymetallic deposit.

Positive factors

  • Indicated category provides reasonable geological confidence for rubidium in the underground resource.
  • Grade of 0.45% Rb2O is very significant for a critical mineral.

Evidence · table

“0.45”

Context: Sister Sam UG Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida · lithiumTonnes: 4900000Grade: 1.12Grade Unit: % Li2OContained Metal: 55000Contained Unit: tView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:2a26bdeff43833087a79
Deposit or zone
Sister Sam
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
4900000
Grade
1.12
Grade Unit
% Li2O
Contained Metal
55000
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Sister Sam underground Inferred resource provides substantial additional tonnage at an economic grade, but its lower confidence category requires significant further drilling for conversion and de-risking.

Positive factors

  • Grade of 1.12% Li2O is economic for underground lithium.

Negative factors

  • Inferred category has lower geological confidence and cannot support economic studies alone.

Evidence · table

“4,900,000”

Context: Sister Sam UG Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida · tantalumTonnes: 4900000Grade: 119Grade Unit: ppm Ta2O5View all details
Link to this fact

Identity

Project
Mt Ida
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:2a26bdeff43833087a79
Deposit or zone
Sister Sam
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
4900000
Grade
119
Grade Unit
ppm Ta2O5
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Sister Sam underground Inferred resource includes tantalum, but its lower confidence category requires further work.

Negative factors

  • Inferred category has lower geological confidence for tantalum.

Evidence · table

“119”

Context: Sister Sam UG Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida · rubidiumTonnes: 4900000Grade: 0.38Grade Unit: % Rb2OView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
rubidium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:2a26bdeff43833087a79
Deposit or zone
Sister Sam
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
4900000
Grade
0.38
Grade Unit
% Rb2O
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Sister Sam underground Inferred resource contains a notable rubidium grade, but its lower confidence category requires further work for de-risking.

Positive factors

  • Grade of 0.38% Rb2O is significant for a critical mineral.

Negative factors

  • Inferred category has lower geological confidence for rubidium.

Evidence · table

“0.38”

Context: Sister Sam UG Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredMt Ida · lithiumTonnes: 220000Grade: 1.09Grade Unit: % Li2OContained Metal: 2400Contained Unit: tView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:94adea3b299a7dd189e7
Deposit or zone
Timoni
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
220000
Grade
1.09
Grade Unit
% Li2O
Contained Metal
2400
Contained Unit
t
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Timoni open pit Measured resource provides a high-confidence, economic-grade component, contributing to the early mine plan.

Positive factors

  • Measured category represents the highest confidence in tonnage and grade.
  • Grade of 1.09% Li2O is economic for open pit lithium.

Evidence · table

“220,000”

Context: Timoni OP Measured

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredMt Ida · tantalumTonnes: 220000Grade: 240Grade Unit: ppm Ta2O5View all details
Link to this fact

Identity

Project
Mt Ida
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:94adea3b299a7dd189e7
Deposit or zone
Timoni
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
220000
Grade
240
Grade Unit
ppm Ta2O5
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Timoni open pit Measured resource includes a moderate tantalum grade with high confidence, contributing to the polymetallic value.

Positive factors

  • Measured category provides high confidence for tantalum in the open pit resource.

Evidence · table

“240”

Context: Timoni OP Measured

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredMt Ida · rubidiumTonnes: 220000Grade: 0.33Grade Unit: % Rb2OView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
rubidium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:94adea3b299a7dd189e7
Deposit or zone
Timoni
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
220000
Grade
0.33
Grade Unit
% Rb2O
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Timoni open pit Measured resource contains a notable rubidium grade with high confidence, further enhancing the economic potential of the polymetallic deposit.

Positive factors

  • Measured category provides high confidence for rubidium in the open pit resource.
  • Grade of 0.33% Rb2O is significant for a critical mineral.

Evidence · table

“0.33”

Context: Timoni OP Measured

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedMt Ida · lithiumTonnes: 290000Grade: 1.18Grade Unit: % Li2OContained Metal: 3400Contained Unit: tView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:df931c3aa96931be958e
Deposit or zone
Timoni
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
290000
Grade
1.18
Grade Unit
% Li2O
Contained Metal
3400
Contained Unit
t
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Timoni open pit Indicated resource provides a good-grade, moderate-tonnage component with reasonable geological confidence, contributing to the project's early value.

Positive factors

  • Indicated category provides reasonable geological confidence for open pit mining.
  • Grade of 1.18% Li2O is strong for open pit lithium.

Evidence · table

“290,000”

Context: Timoni OP Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedMt Ida · tantalumTonnes: 290000Grade: 216Grade Unit: ppm Ta2O5View all details
Link to this fact

Identity

Project
Mt Ida
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:df931c3aa96931be958e
Deposit or zone
Timoni
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
290000
Grade
216
Grade Unit
ppm Ta2O5
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Timoni open pit Indicated resource includes a moderate tantalum grade with reasonable confidence, adding to the polymetallic value.

Positive factors

  • Indicated category provides reasonable geological confidence for tantalum in the open pit resource.

Evidence · table

“216”

Context: Timoni OP Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedMt Ida · rubidiumTonnes: 290000Grade: 0.41Grade Unit: % Rb2OView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
rubidium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:df931c3aa96931be958e
Deposit or zone
Timoni
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
290000
Grade
0.41
Grade Unit
% Rb2O
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Timoni open pit Indicated resource contains a notable rubidium grade with reasonable confidence, further enhancing the economic potential of the polymetallic deposit.

Positive factors

  • Indicated category provides reasonable geological confidence for rubidium in the open pit resource.
  • Grade of 0.41% Rb2O is significant for a critical mineral.

Evidence · table

“0.41”

Context: Timoni OP Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida · lithiumTonnes: 27000Grade: 0.75Grade Unit: % Li2OContained Metal: 210Contained Unit: tView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:c190a320c8d0b8abae65
Deposit or zone
Timoni
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
27000
Grade
0.75
Grade Unit
% Li2O
Contained Metal
210
Contained Unit
t
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Timoni open pit Inferred resource provides additional tonnage at an economic grade, but its lower confidence category requires further drilling for conversion and de-risking.

Positive factors

  • Grade of 0.75% Li2O is economic for open pit lithium.

Negative factors

  • Inferred category has lower geological confidence and cannot support economic studies alone.

Evidence · table

“27,000”

Context: Timoni OP Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida · tantalumTonnes: 27000Grade: 185Grade Unit: ppm Ta2O5View all details
Link to this fact

Identity

Project
Mt Ida
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:c190a320c8d0b8abae65
Deposit or zone
Timoni
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
27000
Grade
185
Grade Unit
ppm Ta2O5
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Timoni open pit Inferred resource includes tantalum, but its lower confidence category requires further work.

Negative factors

  • Inferred category has lower geological confidence for tantalum.

Evidence · table

“185”

Context: Timoni OP Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida · rubidiumTonnes: 27000Grade: 0.25Grade Unit: % Rb2OView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
rubidium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:c190a320c8d0b8abae65
Deposit or zone
Timoni
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
27000
Grade
0.25
Grade Unit
% Rb2O
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Timoni open pit Inferred resource contains a notable rubidium grade, but its lower confidence category requires further work for de-risking.

Positive factors

  • Grade of 0.25% Rb2O is significant for a critical mineral.

Negative factors

  • Inferred category has lower geological confidence for rubidium.

Evidence · table

“0.25”

Context: Timoni OP Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedMt Ida · lithiumTonnes: 470000Grade: 1.35Grade Unit: % Li2OContained Metal: 6400Contained Unit: tView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:96af2c817e8a3d1c0541
Deposit or zone
Timoni
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
470000
Grade
1.35
Grade Unit
% Li2O
Contained Metal
6400
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Timoni underground Indicated resource provides a high-grade, moderate-tonnage component with reasonable geological confidence, contributing to the project's long-term value.

Positive factors

  • Indicated category provides reasonable geological confidence for underground mining.
  • Grade of 1.35% Li2O is very strong for underground lithium.

Evidence · table

“470,000”

Context: Timoni UG Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedMt Ida · tantalumTonnes: 470000Grade: 191Grade Unit: ppm Ta2O5View all details
Link to this fact

Identity

Project
Mt Ida
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:96af2c817e8a3d1c0541
Deposit or zone
Timoni
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
470000
Grade
191
Grade Unit
ppm Ta2O5
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Timoni underground Indicated resource includes a moderate tantalum grade with reasonable confidence, adding to the polymetallic value.

Positive factors

  • Indicated category provides reasonable geological confidence for tantalum in the underground resource.

Evidence · table

“191”

Context: Timoni UG Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedMt Ida · rubidiumTonnes: 470000Grade: 0.33Grade Unit: % Rb2OView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
rubidium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:96af2c817e8a3d1c0541
Deposit or zone
Timoni
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
470000
Grade
0.33
Grade Unit
% Rb2O
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Timoni underground Indicated resource contains a notable rubidium grade with reasonable confidence, further enhancing the economic potential of the polymetallic deposit.

Positive factors

  • Indicated category provides reasonable geological confidence for rubidium in the underground resource.
  • Grade of 0.33% Rb2O is significant for a critical mineral.

Evidence · table

“0.33”

Context: Timoni UG Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida · lithiumTonnes: 1000000Grade: 0.99Grade Unit: % Li2OContained Metal: 10000Contained Unit: tView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:8c421b4b2d672820efec
Deposit or zone
Timoni
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1000000
Grade
0.99
Grade Unit
% Li2O
Contained Metal
10000
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Timoni underground Inferred resource provides additional tonnage at an economic grade, but its lower confidence category requires further drilling for conversion and de-risking.

Positive factors

  • Grade of 0.99% Li2O is economic for underground lithium.

Negative factors

  • Inferred category has lower geological confidence and cannot support economic studies alone.

Evidence · table

“1,000,000”

Context: Timoni UG Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida · tantalumTonnes: 1000000Grade: 137Grade Unit: ppm Ta2O5View all details
Link to this fact

Identity

Project
Mt Ida
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:8c421b4b2d672820efec
Deposit or zone
Timoni
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1000000
Grade
137
Grade Unit
ppm Ta2O5
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Timoni underground Inferred resource includes tantalum, but its lower confidence category requires further work.

Negative factors

  • Inferred category has lower geological confidence for tantalum.

Evidence · table

“137”

Context: Timoni UG Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida · rubidiumTonnes: 1000000Grade: 0.38Grade Unit: % Rb2OView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
rubidium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:8c421b4b2d672820efec
Deposit or zone
Timoni
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1000000
Grade
0.38
Grade Unit
% Rb2O
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Timoni underground Inferred resource contains a notable rubidium grade, but its lower confidence category requires further work for de-risking.

Positive factors

  • Grade of 0.38% Rb2O is significant for a critical mineral.

Negative factors

  • Inferred category has lower geological confidence for rubidium.

Evidence · table

“0.38”

Context: Timoni UG Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredMt Ida · lithiumTonnes: 490000Grade: 1.2Grade Unit: % Li2OContained Metal: 5900Contained Unit: tView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:30eab74d9b712acee940
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
490000
Grade
1.2
Grade Unit
% Li2O
Contained Metal
5900
Contained Unit
t

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The total Measured resource provides a high-confidence, high-grade component, significantly de-risking the early mine plan.

Positive factors

  • Measured category represents the highest confidence in tonnage and grade.
  • Grade of 1.20% Li2O is strong for lithium.

Evidence · table

“490,000”

Context: Total Measured

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredMt Ida · tantalumTonnes: 490000Grade: 256Grade Unit: ppm Ta2O5View all details
Link to this fact

Identity

Project
Mt Ida
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:30eab74d9b712acee940
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
490000
Grade
256
Grade Unit
ppm Ta2O5

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The total Measured resource includes a moderate tantalum grade with high confidence, contributing to the polymetallic value.

Positive factors

  • Measured category provides high confidence for tantalum.

Evidence · table

“256”

Context: Total Measured

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredMt Ida · rubidiumTonnes: 490000Grade: 0.39Grade Unit: % Rb2OView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
rubidium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:30eab74d9b712acee940
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
490000
Grade
0.39
Grade Unit
% Rb2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The total Measured resource contains a notable rubidium grade with high confidence, further enhancing the economic potential of the polymetallic deposit.

Positive factors

  • Measured category provides high confidence for rubidium.
  • Grade of 0.39% Rb2O is significant for a critical mineral.

Evidence · table

“0.39”

Context: Total Measured

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedMt Ida · lithiumTonnes: 7200000Grade: 1.34Grade Unit: % Li2OContained Metal: 96000Contained Unit: tView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:26ab776a10185a2fb182
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
7200000
Grade
1.34
Grade Unit
% Li2O
Contained Metal
96000
Contained Unit
t

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The total Indicated resource is a very substantial, high-grade component with reasonable geological confidence, forming the backbone of the project's value.

Positive factors

  • Indicated category provides reasonable geological confidence for a substantial tonnage.
  • Grade of 1.34% Li2O is very strong for lithium.

Evidence · table

“7,200,000”

Context: Total Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedMt Ida · tantalumTonnes: 7200000Grade: 215Grade Unit: ppm Ta2O5View all details
Link to this fact

Identity

Project
Mt Ida
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:26ab776a10185a2fb182
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
7200000
Grade
215
Grade Unit
ppm Ta2O5

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The total Indicated resource includes a moderate tantalum grade with reasonable confidence, adding significant polymetallic value.

Positive factors

  • Indicated category provides reasonable geological confidence for tantalum.

Evidence · table

“215”

Context: Total Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedMt Ida · rubidiumTonnes: 7200000Grade: 0.45Grade Unit: % Rb2OView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
rubidium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:26ab776a10185a2fb182
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
7200000
Grade
0.45
Grade Unit
% Rb2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The total Indicated resource contains a very notable rubidium grade with reasonable confidence, significantly enhancing the economic potential of the polymetallic deposit.

Positive factors

  • Indicated category provides reasonable geological confidence for rubidium.
  • Grade of 0.45% Rb2O is very significant for a critical mineral.

Evidence · table

“0.45”

Context: Total Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida · lithiumTonnes: 7100000Grade: 1.07Grade Unit: % Li2OContained Metal: 76000Contained Unit: tView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:40daf1149a5a445c53b5
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
7100000
Grade
1.07
Grade Unit
% Li2O
Contained Metal
76000
Contained Unit
t

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The total Inferred resource provides substantial additional tonnage at an economic grade, but its lower confidence category requires significant further drilling for conversion and de-risking.

Positive factors

  • Grade of 1.07% Li2O is economic for lithium.

Negative factors

  • Inferred category has lower geological confidence and cannot support economic studies alone.

Evidence · table

“7,100,000”

Context: Total Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida · tantalumTonnes: 7100000Grade: 126Grade Unit: ppm Ta2O5View all details
Link to this fact

Identity

Project
Mt Ida
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:40daf1149a5a445c53b5
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
7100000
Grade
126
Grade Unit
ppm Ta2O5

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The total Inferred resource includes tantalum, but its lower confidence category requires further work.

Negative factors

  • Inferred category has lower geological confidence for tantalum.

Evidence · table

“126”

Context: Total Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida · rubidiumTonnes: 7100000Grade: 0.38Grade Unit: % Rb2OView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
rubidium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:40daf1149a5a445c53b5
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
7100000
Grade
0.38
Grade Unit
% Rb2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The total Inferred resource contains a notable rubidium grade, but its lower confidence category requires further work for de-risking.

Positive factors

  • Grade of 0.38% Rb2O is significant for a critical mineral.

Negative factors

  • Inferred category has lower geological confidence for rubidium.

Evidence · table

“0.38”

Context: Total Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 49Mt Ida · lithiumTonnes: 14800000Grade: 1.21Grade Unit: % Li2OContained Metal: 177000Contained Unit: tView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:50b580049222b5c0d36b
Mining method
combined
Ownership percent
100 %

Resource Data

Tonnes
14800000
Grade
1.21
Grade Unit
% Li2O
Contained Metal
177000
Contained Unit
t

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Mt Ida project boasts a significant total lithium resource with a strong average grade, providing a robust foundation for development.

Positive factors

  • Substantial total resource of 14.8 Mt at a strong grade of 1.21% Li2O.
  • High contained metal of 177,000 tonnes Li2O.

Evidence · table

“14,800,000”

Context: Total

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 50Mt Ida · tantalumTonnes: 14800000Grade: 170Grade Unit: ppm Ta2O5View all details
Link to this fact

Identity

Project
Mt Ida
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:50b580049222b5c0d36b
Mining method
combined
Ownership percent
100 %

Resource Data

Tonnes
14800000
Grade
170
Grade Unit
ppm Ta2O5

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Mt Ida project includes a substantial total tantalum resource, adding significant polymetallic value.

Positive factors

  • Significant total tantalum resource at a moderate grade.

Evidence · table

“170”

Context: Total

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 51Mt Ida · rubidiumTonnes: 14800000Grade: 0.42Grade Unit: % Rb2OView all details
Link to this fact

Identity

Project
Mt Ida
Commodity
rubidium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
Resource group id
resource:50b580049222b5c0d36b
Mining method
combined
Ownership percent
100 %

Resource Data

Tonnes
14800000
Grade
0.42
Grade Unit
% Rb2O

Prior Estimate

Resource Date
2025-11-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Mt Ida project contains a substantial total rubidium resource at a notable grade, significantly enhancing its economic potential as a critical mineral.

Positive factors

  • Significant total rubidium resource at a notable grade of 0.42% Rb2O.

Evidence · table

“0.42”

Context: Total

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Metallurgical Results (4)

Fact 1Mt Ida Lithium ProjectView all details
Link to this fact

Identity

Project
Mt Ida Lithium Project
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Recovery

Conc. Grade
5.5
Conc. Grade Unit
% Li2O

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The Scoping Study presents highly positive financial outcomes with a substantial NPV and IRR, supported by a long mine life and multi-product strategy, although the preliminary nature of the study introduces inherent uncertainties.

Positive factors

  • Strong post-tax NPV of A$748M and IRR of 33% indicate robust project economics.
  • Long mine life of 11 years provides sustained production potential.
  • Competitive pre-production capital cost of A$483M for a 1Mtpa operation.
  • Multi-product stream (spodumene, lepidolite, tantalum) diversifies revenue.

Negative factors

  • Scoping Study accuracy of +/- 40% implies significant uncertainty in cost and financial estimates.
  • Production target includes Inferred resources, which carry lower confidence.

Evidence · table

“748”

Context: NPV $M

Tags used in scoring

Byproduct Commodityneutral

The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: the release describes a byproduct credit

flotationMt Ida Lithium Project · lithiumRecovery: 73 %Head Grade: 1.09Head Grade Unit: % Li2OView all details
Link to this fact

Identity

Project
Mt Ida Lithium Project
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Test Work

Test Type
flotation
Processing Route
Whole Ore Flotation
Sample
Five composites and two subsamples from drill core
Grind P80
106 µm

Recovery

Recovery
73 %
Head Grade
1.09
Head Grade Unit
% Li2O
Conc. Grade
5.5
Conc. Grade Unit
% Li2O

Lab

Laboratory
Nagrom laboratories
Consultant
Primero and Sedgman

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The metallurgical testwork demonstrates a strong overall lithium recovery of 73% using a conventional flotation route, producing a saleable spodumene concentrate, supported by variability testing across multiple composites, though pilot-scale validation is pending.

Positive factors

  • High overall lithium recovery of 73% for a multi-product flotation circuit.
  • Successful production of 5.5% Li2O spodumene concentrate.
  • Testwork conducted on multiple composites, indicating good domain coverage.
  • Conventional Whole Ore Flotation (WOF) process is well-established.

Negative factors

  • No bulk sample or pilot scale test work has been completed to date, limiting scale-up confidence.

Evidence · text

“overall lithium recovery of approximately 73%”

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the flotation signal

Byproduct Commodityneutral

The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: the release describes a byproduct credit

flotationMt Ida Lithium Project · tantalumRecovery: 55 %View all details
Link to this fact

Identity

Project
Mt Ida Lithium Project
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Test Work

Test Type
flotation
Processing Route
Whole Ore Flotation (with spirals for tantalum)
Sample
Five composites and two subsamples from drill core

Recovery

Recovery
55 %
Conc. Grade
5
Conc. Grade Unit
% Ta2O5

Lab

Laboratory
Nagrom laboratories
Consultant
Primero and Sedgman

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The study successfully demonstrates a 55% tantalum recovery to a 5% Ta2O5 concentrate, providing a valuable co-product stream, although further scale-up validation is required.

Positive factors

  • Achieved 55% tantalum recovery to a 5% Ta2O5 concentrate, adding byproduct value.
  • Integration of tantalum recovery into the existing WOF flowsheet.

Negative factors

  • No bulk sample or pilot scale test work has been completed to date, limiting scale-up confidence.

Evidence · text

“front-end tantalum recovery of 55%”

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the flotation signal

Byproduct Commodityneutral

The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: the release describes a byproduct credit

flotationMt Ida Lithium Project · rubidiumRecovery: 60 %View all details
Link to this fact

Identity

Project
Mt Ida Lithium Project
Commodity
rubidium
Region
australia_wa
Reported Region
Western Australia
Ticker
DLI

Test Work

Test Type
flotation
Processing Route
Whole Ore Flotation (mica pre-float)
Sample
Five composites and two subsamples from drill core

Recovery

Recovery
60 %
Conc. Grade
1.8
Conc. Grade Unit
% Rb2O

Lab

Laboratory
Nagrom laboratories
Consultant
Primero and Sedgman

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: The metallurgical testwork shows a strong 60% rubidium recovery to a high-grade lepidolite concentrate, significantly enhancing project economics due to rubidium's critical mineral status, pending further scale-up validation.

Positive factors

  • High rubidium recovery of 60% to the lepidolite concentrate, significantly improving project economics.
  • Lepidolite concentrate contains a high grade of 1.8% Rb2O.
  • Rubidium is a critical mineral with strategic importance and pricing premium.

Negative factors

  • No bulk sample or pilot scale test work has been completed to date, limiting scale-up confidence.

Evidence · text

“recovery of approximately 60% which improves the economics and robustness”

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the flotation signal

Byproduct Commodityneutral

The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: the release describes a byproduct credit

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.