DLI: Mt Ida Lithium Scoping Study
Original announcement by asx on
- Company
- Delta Lithium Limited
- Ticker
- DLI
- Exchange
- ASX
- Region
- Western Australia
- Primary commodity
- Lithium
- Secondary commodities
- Tantalum, Rubidium
- Document categories
- Other, Resource update, Metallurgy
- Extracted
- 2026-11-16 23:07:25 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Delta Lithium Limited has released positive outcomes from its Scoping Study for the Mt Ida Lithium Project in Western Australia, projecting an 11-year mine life with a post-tax NPV of A$748 million and an IRR of 33%. The study outlines a 1Mtpa whole ore flotation concentrator producing spodumene, lepidolite (with rubidium), and tantalum concentrates, achieving an overall lithium recovery of 73%. The project is underpinned by 73% Measured & Indicated resources over the life of mine and is fully permitted for both open pit and underground mining.
Reasoning: The Scoping Study demonstrates strong economic potential for the Mt Ida Lithium Project with positive NPV, IRR, and a long mine life, supported by a high-confidence resource and multi-product recovery, despite the preliminary nature of the study and future funding requirements.
Positive factors
- Strong economic metrics with a post-tax NPV of A$748M and IRR of 33%.
- Project demonstrates a long mine life of 11 years.
- High confidence resource base with 73% Measured & Indicated material over LOM and 83% in initial 5 years.
- Recovery of multiple valuable products: spodumene, lepidolite (with rubidium), and tantalum concentrates.
- Project is fully permitted for both open pit and underground mining.
- High overall lithium recovery of 73% achieved through Whole Ore Flotation.
- Rubidium co-product significantly improves project economics and robustness.
Negative factors
- The Scoping Study has an accuracy of +/- 40% and is not sufficient to support Ore Reserves.
- The production target includes 27% Inferred Mineral Resources over the life of mine.
- Further funding will be required to progress the project to development.
Low confidence — this extraction should be reviewed alongside the original source.
Facts used in scoring: 55

Classification and evidence
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: The document is a Scoping Study, which is an early-stage economic assessment.
Evidence · text
“Scoping Study for Mt Ida Lithium Project”
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: The resource estimate includes 490,000 tonnes of Measured category lithium.
Evidence · table
“490,000”
Context: Total Measured
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: The resource estimate includes 7,200,000 tonnes of Indicated category lithium.
Evidence · table
“7,200,000”
Context: Total Indicated
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The resource estimate includes 7,100,000 tonnes of Inferred category lithium.
Evidence · table
“7,100,000”
Context: Total Inferred
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: The Mineral Resource estimate was prepared by Competent Persons Susan Havlin, Olaf Frederickson, Robert Simmons, and Tom Joseph in accordance with JORC Code.
Evidence · text
“The Mineral Resource underpinning the Scoping Study has been prepared by Competent Persons in accordance with the requirements in the JORC Code.”
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: The Mineral Resource Estimate is JORC compliant.
Evidence · text
“JORC compliant Mineral Resource Estimate”
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: The cut-off grades for the resource estimate are clearly stated as 0.3% Li2O for open pit and 0.5% Li2O for underground.
Evidence · table
“Cut Off grade used is 0.3% for Open pit and 0.5% Li2O for Underground”
High Recoverypositive
Recovery at or above the exceptional band for the commodity and processing route.
Why it applies: The overall lithium recovery is expected to be 73%, which is strong for a multi-product flotation circuit.
Evidence · text
“overall lithium recovery of approximately 73%”
Multi-Domain Testedpositive
Variability across ore domains (oxide, transition, fresh) has been addressed.
Why it applies: Metallurgical testwork was conducted on five composites and two subsamples, totaling seven different composites.
Evidence · text
“Five composites were generated from drill core from the Mt Ida Lithium project. Two more composites were generated from subsamples taken from the original drill core composites.”
Mill Routeneutral
Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
Why it applies: The processing route involves a 'Whole Ore Flotation' lithium concentrator.
Evidence · text
“1Mtpa ‘Whole Ore Flotation’ (WOF) lithium concentrator”
Byproduct Commodityneutral
The tested commodity is a byproduct rather than the primary economic driver.
Why it applies: Tantalum and rubidium are recovered as co-products alongside lithium concentrates.
Evidence · text
“recovery to three products: Spodumene Concentrate (SC5.5%), Lepidolite Concentrate (LC3.0% Li2O, 1.8% Rb2O), Tantalum Concentrate (Ta2O5 5%)”
Gravity Routeneutral
Gravity separation forms a material part of the flowsheet.
Why it applies: the document describes a gravity route ("gravity")
Single Domain Onlynegative
Testing limited to one composite or domain — representativeness not established.
Why it applies: only one composite was tested
Extracted facts
Stored fact records: 55. Some facts used in scoring do not have a stored record.
Resource Estimates (51)
indicatedMt Ida · lithiumTonnes: 170000Grade: 0.95Grade Unit: % Li2OContained Metal: 1600Contained Unit: tView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- lithium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:33b934227cf6a33c313b
- Deposit or zone
- Sparrow
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 170000
- Grade
- 0.95
- Grade Unit
- % Li2O
- Contained Metal
- 1600
- Contained Unit
- t
- Cutoff Grade
- 0.3
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Sparrow open pit Indicated resource provides a moderate-grade, moderate-tonnage component to the overall resource with reasonable geological confidence.
Positive factors
- Indicated category provides reasonable geological confidence.
- Grade of 0.95% Li2O is economic for open pit lithium.
Evidence · table
“170,000”
Context: Sparrow OP Indicated
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedMt Ida · tantalumTonnes: 170000Grade: 287Grade Unit: ppm Ta2O5View all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- tantalum
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:33b934227cf6a33c313b
- Deposit or zone
- Sparrow
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 170000
- Grade
- 287
- Grade Unit
- ppm Ta2O5
- Cutoff Grade
- 0.3
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Sparrow open pit Indicated resource includes a moderate tantalum grade, contributing to the polymetallic nature of the deposit.
Positive factors
- Indicated category provides reasonable geological confidence for tantalum.
Evidence · table
“287”
Context: Sparrow OP Indicated
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedMt Ida · rubidiumTonnes: 170000Grade: 0.42Grade Unit: % Rb2OView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- rubidium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:33b934227cf6a33c313b
- Deposit or zone
- Sparrow
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 170000
- Grade
- 0.42
- Grade Unit
- % Rb2O
- Cutoff Grade
- 0.3
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Sparrow open pit Indicated resource contains a notable rubidium grade, enhancing the overall economic potential of the polymetallic deposit.
Positive factors
- Indicated category provides reasonable geological confidence for rubidium.
- Grade of 0.42% Rb2O is significant for a critical mineral.
Evidence · table
“0.42”
Context: Sparrow OP Indicated
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedMt Ida · lithiumTonnes: 1100000Grade: 1.05Grade Unit: % Li2OContained Metal: 11000Contained Unit: tView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- lithium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:0cd54f961ea728ed6751
- Deposit or zone
- Sparrow
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 1100000
- Grade
- 1.05
- Grade Unit
- % Li2O
- Contained Metal
- 11000
- Contained Unit
- t
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Sparrow underground Indicated resource offers a good-grade, moderate-tonnage component with reasonable geological confidence, suitable for underground extraction.
Positive factors
- Indicated category provides reasonable geological confidence for underground mining.
- Grade of 1.05% Li2O is economic for underground lithium.
Evidence · table
“1,100,000”
Context: Sparrow UG Indicated
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedMt Ida · tantalumTonnes: 1100000Grade: 176Grade Unit: ppm Ta2O5View all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- tantalum
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:0cd54f961ea728ed6751
- Deposit or zone
- Sparrow
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 1100000
- Grade
- 176
- Grade Unit
- ppm Ta2O5
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Sparrow underground Indicated resource includes a moderate tantalum grade, contributing to the overall polymetallic value.
Positive factors
- Indicated category provides reasonable geological confidence for tantalum in the underground resource.
Evidence · table
“176”
Context: Sparrow UG Indicated
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedMt Ida · rubidiumTonnes: 1100000Grade: 0.43Grade Unit: % Rb2OView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- rubidium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:0cd54f961ea728ed6751
- Deposit or zone
- Sparrow
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 1100000
- Grade
- 0.43
- Grade Unit
- % Rb2O
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Sparrow underground Indicated resource contains a notable rubidium grade, further enhancing the economic potential of the polymetallic deposit.
Positive factors
- Indicated category provides reasonable geological confidence for rubidium in the underground resource.
- Grade of 0.43% Rb2O is significant for a critical mineral.
Evidence · table
“0.43”
Context: Sparrow UG Indicated
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida · lithiumTonnes: 1100000Grade: 0.93Grade Unit: % Li2OContained Metal: 10000Contained Unit: tView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- lithium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:94a5391bc57612dd296e
- Deposit or zone
- Sparrow
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1100000
- Grade
- 0.93
- Grade Unit
- % Li2O
- Contained Metal
- 10000
- Contained Unit
- t
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Sparrow underground Inferred resource provides additional tonnage at an economic grade, but its lower confidence category requires further drilling for conversion and de-risking.
Positive factors
- Grade of 0.93% Li2O is economic for underground lithium.
Negative factors
- Inferred category has lower geological confidence and cannot support economic studies alone.
Evidence · table
“1,100,000”
Context: Sparrow UG Inferred
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida · tantalumTonnes: 1100000Grade: 141Grade Unit: ppm Ta2O5View all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- tantalum
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:94a5391bc57612dd296e
- Deposit or zone
- Sparrow
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1100000
- Grade
- 141
- Grade Unit
- ppm Ta2O5
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Sparrow underground Inferred resource includes tantalum, but its lower confidence category requires further work.
Negative factors
- Inferred category has lower geological confidence for tantalum.
Evidence · table
“141”
Context: Sparrow UG Inferred
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida · rubidiumTonnes: 1100000Grade: 0.4Grade Unit: % Rb2OView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- rubidium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:94a5391bc57612dd296e
- Deposit or zone
- Sparrow
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1100000
- Grade
- 0.4
- Grade Unit
- % Rb2O
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Sparrow underground Inferred resource contains a notable rubidium grade, but its lower confidence category requires further work for de-risking.
Positive factors
- Grade of 0.40% Rb2O is significant for a critical mineral.
Negative factors
- Inferred category has lower geological confidence for rubidium.
Evidence · table
“0.40”
Context: Sparrow UG Inferred
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
measuredMt Ida · lithiumTonnes: 270000Grade: 1.3Grade Unit: % Li2OContained Metal: 3500Contained Unit: tView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- lithium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:4e7d4d7be722a6f3ac51
- Deposit or zone
- Sister Sam
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- measured
- Tonnes
- 270000
- Grade
- 1.3
- Grade Unit
- % Li2O
- Contained Metal
- 3500
- Contained Unit
- t
- Cutoff Grade
- 0.3
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Sister Sam open pit Measured resource provides a high-confidence, high-grade component, significantly de-risking the early mine plan.
Positive factors
- Measured category represents the highest confidence in tonnage and grade.
- Grade of 1.30% Li2O is strong for open pit lithium.
Evidence · table
“270,000”
Context: Sister Sam OP Measured
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
measuredMt Ida · tantalumTonnes: 270000Grade: 268Grade Unit: ppm Ta2O5View all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- tantalum
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:4e7d4d7be722a6f3ac51
- Deposit or zone
- Sister Sam
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- measured
- Tonnes
- 270000
- Grade
- 268
- Grade Unit
- ppm Ta2O5
- Cutoff Grade
- 0.3
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Sister Sam open pit Measured resource includes a moderate tantalum grade with high confidence, contributing to the polymetallic value.
Positive factors
- Measured category provides high confidence for tantalum in the open pit resource.
Evidence · table
“268”
Context: Sister Sam OP Measured
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
measuredMt Ida · rubidiumTonnes: 270000Grade: 0.44Grade Unit: % Rb2OView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- rubidium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:4e7d4d7be722a6f3ac51
- Deposit or zone
- Sister Sam
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- measured
- Tonnes
- 270000
- Grade
- 0.44
- Grade Unit
- % Rb2O
- Cutoff Grade
- 0.3
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Sister Sam open pit Measured resource contains a notable rubidium grade with high confidence, further enhancing the economic potential of the polymetallic deposit.
Positive factors
- Measured category provides high confidence for rubidium in the open pit resource.
- Grade of 0.44% Rb2O is significant for a critical mineral.
Evidence · table
“0.44”
Context: Sister Sam OP Measured
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedMt Ida · lithiumTonnes: 3200000Grade: 1.45Grade Unit: % Li2OContained Metal: 46000Contained Unit: tView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- lithium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:bb96bbb4a72cd37f138d
- Deposit or zone
- Sister Sam
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 3200000
- Grade
- 1.45
- Grade Unit
- % Li2O
- Contained Metal
- 46000
- Contained Unit
- t
- Cutoff Grade
- 0.3
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Sister Sam open pit Indicated resource is a substantial, high-grade component with reasonable geological confidence, significantly contributing to the project's early value.
Positive factors
- Indicated category provides reasonable geological confidence for open pit mining.
- Grade of 1.45% Li2O is very strong for open pit lithium.
Evidence · table
“3,200,000”
Context: Sister Sam OP Indicated
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedMt Ida · tantalumTonnes: 3200000Grade: 257Grade Unit: ppm Ta2O5View all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- tantalum
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:bb96bbb4a72cd37f138d
- Deposit or zone
- Sister Sam
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 3200000
- Grade
- 257
- Grade Unit
- ppm Ta2O5
- Cutoff Grade
- 0.3
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Sister Sam open pit Indicated resource includes a moderate tantalum grade with reasonable confidence, adding to the polymetallic value.
Positive factors
- Indicated category provides reasonable geological confidence for tantalum in the open pit resource.
Evidence · table
“257”
Context: Sister Sam OP Indicated
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedMt Ida · rubidiumTonnes: 3200000Grade: 0.48Grade Unit: % Rb2OView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- rubidium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:bb96bbb4a72cd37f138d
- Deposit or zone
- Sister Sam
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 3200000
- Grade
- 0.48
- Grade Unit
- % Rb2O
- Cutoff Grade
- 0.3
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Sister Sam open pit Indicated resource contains a very notable rubidium grade with reasonable confidence, significantly enhancing the economic potential of the polymetallic deposit.
Positive factors
- Indicated category provides reasonable geological confidence for rubidium in the open pit resource.
- Grade of 0.48% Rb2O is very significant for a critical mineral.
Evidence · table
“0.48”
Context: Sister Sam OP Indicated
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida · lithiumTonnes: 82000Grade: 1.07Grade Unit: % Li2OContained Metal: 880Contained Unit: tView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- lithium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:9bf2a8c7b79a61ba7cef
- Deposit or zone
- Sister Sam
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 82000
- Grade
- 1.07
- Grade Unit
- % Li2O
- Contained Metal
- 880
- Contained Unit
- t
- Cutoff Grade
- 0.3
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Sister Sam open pit Inferred resource provides additional tonnage at an economic grade, but its lower confidence category requires further drilling for conversion and de-risking.
Positive factors
- Grade of 1.07% Li2O is economic for open pit lithium.
Negative factors
- Inferred category has lower geological confidence and cannot support economic studies alone.
Evidence · table
“82,000”
Context: Sister Sam OP Inferred
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida · tantalumTonnes: 82000Grade: 176Grade Unit: ppm Ta2O5View all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- tantalum
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:9bf2a8c7b79a61ba7cef
- Deposit or zone
- Sister Sam
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 82000
- Grade
- 176
- Grade Unit
- ppm Ta2O5
- Cutoff Grade
- 0.3
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Sister Sam open pit Inferred resource includes tantalum, but its lower confidence category requires further work.
Negative factors
- Inferred category has lower geological confidence for tantalum.
Evidence · table
“176”
Context: Sister Sam OP Inferred
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida · rubidiumTonnes: 82000Grade: 0.39Grade Unit: % Rb2OView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- rubidium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:9bf2a8c7b79a61ba7cef
- Deposit or zone
- Sister Sam
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 82000
- Grade
- 0.39
- Grade Unit
- % Rb2O
- Cutoff Grade
- 0.3
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Sister Sam open pit Inferred resource contains a notable rubidium grade, but its lower confidence category requires further work for de-risking.
Positive factors
- Grade of 0.39% Rb2O is significant for a critical mineral.
Negative factors
- Inferred category has lower geological confidence for rubidium.
Evidence · table
“0.39”
Context: Sister Sam OP Inferred
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedMt Ida · lithiumTonnes: 2000000Grade: 1.38Grade Unit: % Li2OContained Metal: 27000Contained Unit: tView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- lithium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:0f2b8f1946714e620ac0
- Deposit or zone
- Sister Sam
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 2000000
- Grade
- 1.38
- Grade Unit
- % Li2O
- Contained Metal
- 27000
- Contained Unit
- t
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Sister Sam underground Indicated resource is a substantial, high-grade component with reasonable geological confidence, significantly contributing to the project's long-term value.
Positive factors
- Indicated category provides reasonable geological confidence for underground mining.
- Grade of 1.38% Li2O is very strong for underground lithium.
Evidence · table
“2,000,000”
Context: Sister Sam UG Indicated
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedMt Ida · tantalumTonnes: 2000000Grade: 166Grade Unit: ppm Ta2O5View all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- tantalum
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:0f2b8f1946714e620ac0
- Deposit or zone
- Sister Sam
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 2000000
- Grade
- 166
- Grade Unit
- ppm Ta2O5
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Sister Sam underground Indicated resource includes a moderate tantalum grade with reasonable confidence, adding to the polymetallic value.
Positive factors
- Indicated category provides reasonable geological confidence for tantalum in the underground resource.
Evidence · table
“166”
Context: Sister Sam UG Indicated
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedMt Ida · rubidiumTonnes: 2000000Grade: 0.45Grade Unit: % Rb2OView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- rubidium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:0f2b8f1946714e620ac0
- Deposit or zone
- Sister Sam
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 2000000
- Grade
- 0.45
- Grade Unit
- % Rb2O
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Sister Sam underground Indicated resource contains a very notable rubidium grade with reasonable confidence, significantly enhancing the economic potential of the polymetallic deposit.
Positive factors
- Indicated category provides reasonable geological confidence for rubidium in the underground resource.
- Grade of 0.45% Rb2O is very significant for a critical mineral.
Evidence · table
“0.45”
Context: Sister Sam UG Indicated
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida · lithiumTonnes: 4900000Grade: 1.12Grade Unit: % Li2OContained Metal: 55000Contained Unit: tView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- lithium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:2a26bdeff43833087a79
- Deposit or zone
- Sister Sam
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 4900000
- Grade
- 1.12
- Grade Unit
- % Li2O
- Contained Metal
- 55000
- Contained Unit
- t
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Sister Sam underground Inferred resource provides substantial additional tonnage at an economic grade, but its lower confidence category requires significant further drilling for conversion and de-risking.
Positive factors
- Grade of 1.12% Li2O is economic for underground lithium.
Negative factors
- Inferred category has lower geological confidence and cannot support economic studies alone.
Evidence · table
“4,900,000”
Context: Sister Sam UG Inferred
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida · tantalumTonnes: 4900000Grade: 119Grade Unit: ppm Ta2O5View all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- tantalum
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:2a26bdeff43833087a79
- Deposit or zone
- Sister Sam
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 4900000
- Grade
- 119
- Grade Unit
- ppm Ta2O5
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Sister Sam underground Inferred resource includes tantalum, but its lower confidence category requires further work.
Negative factors
- Inferred category has lower geological confidence for tantalum.
Evidence · table
“119”
Context: Sister Sam UG Inferred
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida · rubidiumTonnes: 4900000Grade: 0.38Grade Unit: % Rb2OView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- rubidium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:2a26bdeff43833087a79
- Deposit or zone
- Sister Sam
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 4900000
- Grade
- 0.38
- Grade Unit
- % Rb2O
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Sister Sam underground Inferred resource contains a notable rubidium grade, but its lower confidence category requires further work for de-risking.
Positive factors
- Grade of 0.38% Rb2O is significant for a critical mineral.
Negative factors
- Inferred category has lower geological confidence for rubidium.
Evidence · table
“0.38”
Context: Sister Sam UG Inferred
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
measuredMt Ida · lithiumTonnes: 220000Grade: 1.09Grade Unit: % Li2OContained Metal: 2400Contained Unit: tView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- lithium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:94adea3b299a7dd189e7
- Deposit or zone
- Timoni
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- measured
- Tonnes
- 220000
- Grade
- 1.09
- Grade Unit
- % Li2O
- Contained Metal
- 2400
- Contained Unit
- t
- Cutoff Grade
- 0.3
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Timoni open pit Measured resource provides a high-confidence, economic-grade component, contributing to the early mine plan.
Positive factors
- Measured category represents the highest confidence in tonnage and grade.
- Grade of 1.09% Li2O is economic for open pit lithium.
Evidence · table
“220,000”
Context: Timoni OP Measured
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
measuredMt Ida · tantalumTonnes: 220000Grade: 240Grade Unit: ppm Ta2O5View all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- tantalum
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:94adea3b299a7dd189e7
- Deposit or zone
- Timoni
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- measured
- Tonnes
- 220000
- Grade
- 240
- Grade Unit
- ppm Ta2O5
- Cutoff Grade
- 0.3
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Timoni open pit Measured resource includes a moderate tantalum grade with high confidence, contributing to the polymetallic value.
Positive factors
- Measured category provides high confidence for tantalum in the open pit resource.
Evidence · table
“240”
Context: Timoni OP Measured
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
measuredMt Ida · rubidiumTonnes: 220000Grade: 0.33Grade Unit: % Rb2OView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- rubidium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:94adea3b299a7dd189e7
- Deposit or zone
- Timoni
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- measured
- Tonnes
- 220000
- Grade
- 0.33
- Grade Unit
- % Rb2O
- Cutoff Grade
- 0.3
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Timoni open pit Measured resource contains a notable rubidium grade with high confidence, further enhancing the economic potential of the polymetallic deposit.
Positive factors
- Measured category provides high confidence for rubidium in the open pit resource.
- Grade of 0.33% Rb2O is significant for a critical mineral.
Evidence · table
“0.33”
Context: Timoni OP Measured
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedMt Ida · lithiumTonnes: 290000Grade: 1.18Grade Unit: % Li2OContained Metal: 3400Contained Unit: tView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- lithium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:df931c3aa96931be958e
- Deposit or zone
- Timoni
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 290000
- Grade
- 1.18
- Grade Unit
- % Li2O
- Contained Metal
- 3400
- Contained Unit
- t
- Cutoff Grade
- 0.3
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Timoni open pit Indicated resource provides a good-grade, moderate-tonnage component with reasonable geological confidence, contributing to the project's early value.
Positive factors
- Indicated category provides reasonable geological confidence for open pit mining.
- Grade of 1.18% Li2O is strong for open pit lithium.
Evidence · table
“290,000”
Context: Timoni OP Indicated
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedMt Ida · tantalumTonnes: 290000Grade: 216Grade Unit: ppm Ta2O5View all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- tantalum
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:df931c3aa96931be958e
- Deposit or zone
- Timoni
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 290000
- Grade
- 216
- Grade Unit
- ppm Ta2O5
- Cutoff Grade
- 0.3
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Timoni open pit Indicated resource includes a moderate tantalum grade with reasonable confidence, adding to the polymetallic value.
Positive factors
- Indicated category provides reasonable geological confidence for tantalum in the open pit resource.
Evidence · table
“216”
Context: Timoni OP Indicated
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedMt Ida · rubidiumTonnes: 290000Grade: 0.41Grade Unit: % Rb2OView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- rubidium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:df931c3aa96931be958e
- Deposit or zone
- Timoni
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 290000
- Grade
- 0.41
- Grade Unit
- % Rb2O
- Cutoff Grade
- 0.3
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Timoni open pit Indicated resource contains a notable rubidium grade with reasonable confidence, further enhancing the economic potential of the polymetallic deposit.
Positive factors
- Indicated category provides reasonable geological confidence for rubidium in the open pit resource.
- Grade of 0.41% Rb2O is significant for a critical mineral.
Evidence · table
“0.41”
Context: Timoni OP Indicated
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida · lithiumTonnes: 27000Grade: 0.75Grade Unit: % Li2OContained Metal: 210Contained Unit: tView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- lithium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:c190a320c8d0b8abae65
- Deposit or zone
- Timoni
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 27000
- Grade
- 0.75
- Grade Unit
- % Li2O
- Contained Metal
- 210
- Contained Unit
- t
- Cutoff Grade
- 0.3
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Timoni open pit Inferred resource provides additional tonnage at an economic grade, but its lower confidence category requires further drilling for conversion and de-risking.
Positive factors
- Grade of 0.75% Li2O is economic for open pit lithium.
Negative factors
- Inferred category has lower geological confidence and cannot support economic studies alone.
Evidence · table
“27,000”
Context: Timoni OP Inferred
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida · tantalumTonnes: 27000Grade: 185Grade Unit: ppm Ta2O5View all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- tantalum
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:c190a320c8d0b8abae65
- Deposit or zone
- Timoni
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 27000
- Grade
- 185
- Grade Unit
- ppm Ta2O5
- Cutoff Grade
- 0.3
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Timoni open pit Inferred resource includes tantalum, but its lower confidence category requires further work.
Negative factors
- Inferred category has lower geological confidence for tantalum.
Evidence · table
“185”
Context: Timoni OP Inferred
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida · rubidiumTonnes: 27000Grade: 0.25Grade Unit: % Rb2OView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- rubidium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:c190a320c8d0b8abae65
- Deposit or zone
- Timoni
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 27000
- Grade
- 0.25
- Grade Unit
- % Rb2O
- Cutoff Grade
- 0.3
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Timoni open pit Inferred resource contains a notable rubidium grade, but its lower confidence category requires further work for de-risking.
Positive factors
- Grade of 0.25% Rb2O is significant for a critical mineral.
Negative factors
- Inferred category has lower geological confidence for rubidium.
Evidence · table
“0.25”
Context: Timoni OP Inferred
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedMt Ida · lithiumTonnes: 470000Grade: 1.35Grade Unit: % Li2OContained Metal: 6400Contained Unit: tView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- lithium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:96af2c817e8a3d1c0541
- Deposit or zone
- Timoni
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 470000
- Grade
- 1.35
- Grade Unit
- % Li2O
- Contained Metal
- 6400
- Contained Unit
- t
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Timoni underground Indicated resource provides a high-grade, moderate-tonnage component with reasonable geological confidence, contributing to the project's long-term value.
Positive factors
- Indicated category provides reasonable geological confidence for underground mining.
- Grade of 1.35% Li2O is very strong for underground lithium.
Evidence · table
“470,000”
Context: Timoni UG Indicated
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedMt Ida · tantalumTonnes: 470000Grade: 191Grade Unit: ppm Ta2O5View all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- tantalum
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:96af2c817e8a3d1c0541
- Deposit or zone
- Timoni
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 470000
- Grade
- 191
- Grade Unit
- ppm Ta2O5
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Timoni underground Indicated resource includes a moderate tantalum grade with reasonable confidence, adding to the polymetallic value.
Positive factors
- Indicated category provides reasonable geological confidence for tantalum in the underground resource.
Evidence · table
“191”
Context: Timoni UG Indicated
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedMt Ida · rubidiumTonnes: 470000Grade: 0.33Grade Unit: % Rb2OView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- rubidium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:96af2c817e8a3d1c0541
- Deposit or zone
- Timoni
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 470000
- Grade
- 0.33
- Grade Unit
- % Rb2O
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Timoni underground Indicated resource contains a notable rubidium grade with reasonable confidence, further enhancing the economic potential of the polymetallic deposit.
Positive factors
- Indicated category provides reasonable geological confidence for rubidium in the underground resource.
- Grade of 0.33% Rb2O is significant for a critical mineral.
Evidence · table
“0.33”
Context: Timoni UG Indicated
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida · lithiumTonnes: 1000000Grade: 0.99Grade Unit: % Li2OContained Metal: 10000Contained Unit: tView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- lithium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:8c421b4b2d672820efec
- Deposit or zone
- Timoni
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1000000
- Grade
- 0.99
- Grade Unit
- % Li2O
- Contained Metal
- 10000
- Contained Unit
- t
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Timoni underground Inferred resource provides additional tonnage at an economic grade, but its lower confidence category requires further drilling for conversion and de-risking.
Positive factors
- Grade of 0.99% Li2O is economic for underground lithium.
Negative factors
- Inferred category has lower geological confidence and cannot support economic studies alone.
Evidence · table
“1,000,000”
Context: Timoni UG Inferred
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida · tantalumTonnes: 1000000Grade: 137Grade Unit: ppm Ta2O5View all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- tantalum
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:8c421b4b2d672820efec
- Deposit or zone
- Timoni
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1000000
- Grade
- 137
- Grade Unit
- ppm Ta2O5
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Timoni underground Inferred resource includes tantalum, but its lower confidence category requires further work.
Negative factors
- Inferred category has lower geological confidence for tantalum.
Evidence · table
“137”
Context: Timoni UG Inferred
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida · rubidiumTonnes: 1000000Grade: 0.38Grade Unit: % Rb2OView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- rubidium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:8c421b4b2d672820efec
- Deposit or zone
- Timoni
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1000000
- Grade
- 0.38
- Grade Unit
- % Rb2O
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Timoni underground Inferred resource contains a notable rubidium grade, but its lower confidence category requires further work for de-risking.
Positive factors
- Grade of 0.38% Rb2O is significant for a critical mineral.
Negative factors
- Inferred category has lower geological confidence for rubidium.
Evidence · table
“0.38”
Context: Timoni UG Inferred
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
measuredMt Ida · lithiumTonnes: 490000Grade: 1.2Grade Unit: % Li2OContained Metal: 5900Contained Unit: tView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- lithium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:30eab74d9b712acee940
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- measured
- Tonnes
- 490000
- Grade
- 1.2
- Grade Unit
- % Li2O
- Contained Metal
- 5900
- Contained Unit
- t
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The total Measured resource provides a high-confidence, high-grade component, significantly de-risking the early mine plan.
Positive factors
- Measured category represents the highest confidence in tonnage and grade.
- Grade of 1.20% Li2O is strong for lithium.
Evidence · table
“490,000”
Context: Total Measured
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
measuredMt Ida · tantalumTonnes: 490000Grade: 256Grade Unit: ppm Ta2O5View all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- tantalum
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:30eab74d9b712acee940
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- measured
- Tonnes
- 490000
- Grade
- 256
- Grade Unit
- ppm Ta2O5
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The total Measured resource includes a moderate tantalum grade with high confidence, contributing to the polymetallic value.
Positive factors
- Measured category provides high confidence for tantalum.
Evidence · table
“256”
Context: Total Measured
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
measuredMt Ida · rubidiumTonnes: 490000Grade: 0.39Grade Unit: % Rb2OView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- rubidium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:30eab74d9b712acee940
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- measured
- Tonnes
- 490000
- Grade
- 0.39
- Grade Unit
- % Rb2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The total Measured resource contains a notable rubidium grade with high confidence, further enhancing the economic potential of the polymetallic deposit.
Positive factors
- Measured category provides high confidence for rubidium.
- Grade of 0.39% Rb2O is significant for a critical mineral.
Evidence · table
“0.39”
Context: Total Measured
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedMt Ida · lithiumTonnes: 7200000Grade: 1.34Grade Unit: % Li2OContained Metal: 96000Contained Unit: tView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- lithium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:26ab776a10185a2fb182
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 7200000
- Grade
- 1.34
- Grade Unit
- % Li2O
- Contained Metal
- 96000
- Contained Unit
- t
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The total Indicated resource is a very substantial, high-grade component with reasonable geological confidence, forming the backbone of the project's value.
Positive factors
- Indicated category provides reasonable geological confidence for a substantial tonnage.
- Grade of 1.34% Li2O is very strong for lithium.
Evidence · table
“7,200,000”
Context: Total Indicated
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedMt Ida · tantalumTonnes: 7200000Grade: 215Grade Unit: ppm Ta2O5View all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- tantalum
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:26ab776a10185a2fb182
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 7200000
- Grade
- 215
- Grade Unit
- ppm Ta2O5
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The total Indicated resource includes a moderate tantalum grade with reasonable confidence, adding significant polymetallic value.
Positive factors
- Indicated category provides reasonable geological confidence for tantalum.
Evidence · table
“215”
Context: Total Indicated
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedMt Ida · rubidiumTonnes: 7200000Grade: 0.45Grade Unit: % Rb2OView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- rubidium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:26ab776a10185a2fb182
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 7200000
- Grade
- 0.45
- Grade Unit
- % Rb2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The total Indicated resource contains a very notable rubidium grade with reasonable confidence, significantly enhancing the economic potential of the polymetallic deposit.
Positive factors
- Indicated category provides reasonable geological confidence for rubidium.
- Grade of 0.45% Rb2O is very significant for a critical mineral.
Evidence · table
“0.45”
Context: Total Indicated
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida · lithiumTonnes: 7100000Grade: 1.07Grade Unit: % Li2OContained Metal: 76000Contained Unit: tView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- lithium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:40daf1149a5a445c53b5
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 7100000
- Grade
- 1.07
- Grade Unit
- % Li2O
- Contained Metal
- 76000
- Contained Unit
- t
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The total Inferred resource provides substantial additional tonnage at an economic grade, but its lower confidence category requires significant further drilling for conversion and de-risking.
Positive factors
- Grade of 1.07% Li2O is economic for lithium.
Negative factors
- Inferred category has lower geological confidence and cannot support economic studies alone.
Evidence · table
“7,100,000”
Context: Total Inferred
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida · tantalumTonnes: 7100000Grade: 126Grade Unit: ppm Ta2O5View all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- tantalum
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:40daf1149a5a445c53b5
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 7100000
- Grade
- 126
- Grade Unit
- ppm Ta2O5
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The total Inferred resource includes tantalum, but its lower confidence category requires further work.
Negative factors
- Inferred category has lower geological confidence for tantalum.
Evidence · table
“126”
Context: Total Inferred
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida · rubidiumTonnes: 7100000Grade: 0.38Grade Unit: % Rb2OView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- rubidium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:40daf1149a5a445c53b5
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 7100000
- Grade
- 0.38
- Grade Unit
- % Rb2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The total Inferred resource contains a notable rubidium grade, but its lower confidence category requires further work for de-risking.
Positive factors
- Grade of 0.38% Rb2O is significant for a critical mineral.
Negative factors
- Inferred category has lower geological confidence for rubidium.
Evidence · table
“0.38”
Context: Total Inferred
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Fact 49Mt Ida · lithiumTonnes: 14800000Grade: 1.21Grade Unit: % Li2OContained Metal: 177000Contained Unit: tView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- lithium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:50b580049222b5c0d36b
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Tonnes
- 14800000
- Grade
- 1.21
- Grade Unit
- % Li2O
- Contained Metal
- 177000
- Contained Unit
- t
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Mt Ida project boasts a significant total lithium resource with a strong average grade, providing a robust foundation for development.
Positive factors
- Substantial total resource of 14.8 Mt at a strong grade of 1.21% Li2O.
- High contained metal of 177,000 tonnes Li2O.
Evidence · table
“14,800,000”
Context: Total
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Fact 50Mt Ida · tantalumTonnes: 14800000Grade: 170Grade Unit: ppm Ta2O5View all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- tantalum
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:50b580049222b5c0d36b
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Tonnes
- 14800000
- Grade
- 170
- Grade Unit
- ppm Ta2O5
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Mt Ida project includes a substantial total tantalum resource, adding significant polymetallic value.
Positive factors
- Significant total tantalum resource at a moderate grade.
Evidence · table
“170”
Context: Total
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Fact 51Mt Ida · rubidiumTonnes: 14800000Grade: 0.42Grade Unit: % Rb2OView all detailsHide details
Identity
- Project
- Mt Ida
- Commodity
- rubidium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Susan Havlin, Olaf Frederickson, Robert Simmons, Tom Joseph
- Resource group id
- resource:50b580049222b5c0d36b
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Tonnes
- 14800000
- Grade
- 0.42
- Grade Unit
- % Rb2O
Prior Estimate
- Resource Date
- 2025-11-13
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Mt Ida project contains a substantial total rubidium resource at a notable grade, significantly enhancing its economic potential as a critical mineral.
Positive factors
- Significant total rubidium resource at a notable grade of 0.42% Rb2O.
Evidence · table
“0.42”
Context: Total
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Metallurgical Results (4)
Fact 1Mt Ida Lithium ProjectView all detailsHide details
Identity
- Project
- Mt Ida Lithium Project
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Recovery
- Conc. Grade
- 5.5
- Conc. Grade Unit
- % Li2O
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The Scoping Study presents highly positive financial outcomes with a substantial NPV and IRR, supported by a long mine life and multi-product strategy, although the preliminary nature of the study introduces inherent uncertainties.
Positive factors
- Strong post-tax NPV of A$748M and IRR of 33% indicate robust project economics.
- Long mine life of 11 years provides sustained production potential.
- Competitive pre-production capital cost of A$483M for a 1Mtpa operation.
- Multi-product stream (spodumene, lepidolite, tantalum) diversifies revenue.
Negative factors
- Scoping Study accuracy of +/- 40% implies significant uncertainty in cost and financial estimates.
- Production target includes Inferred resources, which carry lower confidence.
Evidence · table
“748”
Context: NPV $M
Tags used in scoring
Byproduct Commodityneutral
The tested commodity is a byproduct rather than the primary economic driver.
Why it applies: the release describes a byproduct credit
flotationMt Ida Lithium Project · lithiumRecovery: 73 %Head Grade: 1.09Head Grade Unit: % Li2OView all detailsHide details
Identity
- Project
- Mt Ida Lithium Project
- Commodity
- lithium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Test Work
- Test Type
- flotation
- Processing Route
- Whole Ore Flotation
- Sample
- Five composites and two subsamples from drill core
- Grind P80
- 106 µm
Recovery
- Recovery
- 73 %
- Head Grade
- 1.09
- Head Grade Unit
- % Li2O
- Conc. Grade
- 5.5
- Conc. Grade Unit
- % Li2O
Lab
- Laboratory
- Nagrom laboratories
- Consultant
- Primero and Sedgman
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The metallurgical testwork demonstrates a strong overall lithium recovery of 73% using a conventional flotation route, producing a saleable spodumene concentrate, supported by variability testing across multiple composites, though pilot-scale validation is pending.
Positive factors
- High overall lithium recovery of 73% for a multi-product flotation circuit.
- Successful production of 5.5% Li2O spodumene concentrate.
- Testwork conducted on multiple composites, indicating good domain coverage.
- Conventional Whole Ore Flotation (WOF) process is well-established.
Negative factors
- No bulk sample or pilot scale test work has been completed to date, limiting scale-up confidence.
Evidence · text
“overall lithium recovery of approximately 73%”
Tags used in scoring
Mill Routeneutral
Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
Why it applies: processing_route matches the flotation signal
Byproduct Commodityneutral
The tested commodity is a byproduct rather than the primary economic driver.
Why it applies: the release describes a byproduct credit
flotationMt Ida Lithium Project · tantalumRecovery: 55 %View all detailsHide details
Identity
- Project
- Mt Ida Lithium Project
- Commodity
- tantalum
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Test Work
- Test Type
- flotation
- Processing Route
- Whole Ore Flotation (with spirals for tantalum)
- Sample
- Five composites and two subsamples from drill core
Recovery
- Recovery
- 55 %
- Conc. Grade
- 5
- Conc. Grade Unit
- % Ta2O5
Lab
- Laboratory
- Nagrom laboratories
- Consultant
- Primero and Sedgman
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The study successfully demonstrates a 55% tantalum recovery to a 5% Ta2O5 concentrate, providing a valuable co-product stream, although further scale-up validation is required.
Positive factors
- Achieved 55% tantalum recovery to a 5% Ta2O5 concentrate, adding byproduct value.
- Integration of tantalum recovery into the existing WOF flowsheet.
Negative factors
- No bulk sample or pilot scale test work has been completed to date, limiting scale-up confidence.
Evidence · text
“front-end tantalum recovery of 55%”
Tags used in scoring
Mill Routeneutral
Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
Why it applies: processing_route matches the flotation signal
Byproduct Commodityneutral
The tested commodity is a byproduct rather than the primary economic driver.
Why it applies: the release describes a byproduct credit
flotationMt Ida Lithium Project · rubidiumRecovery: 60 %View all detailsHide details
Identity
- Project
- Mt Ida Lithium Project
- Commodity
- rubidium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- DLI
Test Work
- Test Type
- flotation
- Processing Route
- Whole Ore Flotation (mica pre-float)
- Sample
- Five composites and two subsamples from drill core
Recovery
- Recovery
- 60 %
- Conc. Grade
- 1.8
- Conc. Grade Unit
- % Rb2O
Lab
- Laboratory
- Nagrom laboratories
- Consultant
- Primero and Sedgman
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: The metallurgical testwork shows a strong 60% rubidium recovery to a high-grade lepidolite concentrate, significantly enhancing project economics due to rubidium's critical mineral status, pending further scale-up validation.
Positive factors
- High rubidium recovery of 60% to the lepidolite concentrate, significantly improving project economics.
- Lepidolite concentrate contains a high grade of 1.8% Rb2O.
- Rubidium is a critical mineral with strategic importance and pricing premium.
Negative factors
- No bulk sample or pilot scale test work has been completed to date, limiting scale-up confidence.
Evidence · text
“recovery of approximately 60% which improves the economics and robustness”
Tags used in scoring
Mill Routeneutral
Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
Why it applies: processing_route matches the flotation signal
Byproduct Commodityneutral
The tested commodity is a byproduct rather than the primary economic driver.
Why it applies: the release describes a byproduct credit
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.