# Colossus Rare Earth Project, Brazil

Canonical Atlas analysis: https://atlas-aws.minestarters.com/news/colossus-rare-earth-project-brazil--a2d91d15-0c89-4dbb-a578-2d31d3a11f7c

Original source: https://www.mining-technology.com/projects/colossus-rare-earth-project-brazil/

Publisher: miningtechnology

Original announcement: 2026-10-26T10:16:08.696Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-10-26T10:32:07.485Z

Atlas analysis updated: 2026-10-26T10:32:07.485Z

- Company: Viridis Mining &amp; Minerals

- Ticker: Unavailable

- Exchange: Unavailable

- Region: Minas Gerais, Brazil

- Primary commodity: Rare earth

- Secondary commodities: Magnetic rare earth oxides

- Document categories: Resource update, Other

- Extracted: 2026-10-26 10:17:12 UTC

Narrative sentiment: 0.60 · Bullish

## Minestarters Atlas summary

Viridis Mining &amp; Minerals has completed a Definitive Feasibility Study for the Colossus Rare Earth Project in Brazil, reporting 200.1 Mt of proven and probable reserves. The open-pit project is expected to commence commercial operations in H2 2028 with a 25-year mine life.

Reasoning: The document reports significant proven and probable reserves for a project that has recently completed a DFS, indicating high project maturity and scale.

- Positive factor: Large reserve tonnage of 200.1 Mt

- Positive factor: Definitive Feasibility Study completed in August 2026

- Positive factor: Low stripping ratio of 0.52:1

- Positive factor: Strategic inclusion in Brazil Climate and Ecological Transformation Investment Platform

Facts used in scoring: 2

## Classification and evidence

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The document explicitly states proven and probable reserves of 200.1mt.

Evidence · text

> The proven and probable reserves at the Colossus rare earth project are estimated to be 200.1 million tonnes \(mt\)

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: The project has completed a Definitive Feasibility Study as of August 2026.

Evidence · text

> a definitive feasibility study was completed in August 2026

## Extracted facts

Stored fact records: 2. Some facts used in scoring do not have a stored record.

## Resource Estimates (2)

### probable

[Link to this fact](https://atlas-aws.minestarters.com/news/colossus-rare-earth-project-brazil--a2d91d15-0c89-4dbb-a578-2d31d3a11f7c#fact-resource-facts-0)

Colossus Rare Earth Project · rare earth

#### Identity

- Project: Colossus Rare Earth Project
- Commodity: rare earth
- Region: brazil
- Reported Region: Minas Gerais, Brazil

#### Resource scope

- Estimate type: resource
- Resource group id: resource:0a0f60943567b2850593
- Deposit or zone: Colossus
- Mining method: combined
- Material type: clay
- Resource basis: gross

#### Resource Data

- Category: probable
- Tonnes: 200100000
- Grade: 2894
- Grade Unit: ppm

#### Prior Estimate

- Resource Date: 2026-07-01

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-26T00:00:00.000Z

Reasoning: Large scale reserve estimate.

- Positive factor: Significant tonnage

Evidence · text

> 200.1 million tonnes \(mt\) grading 2,894 parts per million \(ppm\) total rare earth oxides

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**No QP/CP Disclosure**

Polarity: negative

Definition: No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.

Why it applies: no Qualified or Competent Person is named anywhere in the release

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### probable

[Link to this fact](https://atlas-aws.minestarters.com/news/colossus-rare-earth-project-brazil--a2d91d15-0c89-4dbb-a578-2d31d3a11f7c#fact-resource-facts-1)

Colossus Rare Earth Project · magnetic rare earth oxides

#### Identity

- Project: Colossus Rare Earth Project
- Commodity: magnetic rare earth oxides
- Region: brazil
- Reported Region: Minas Gerais, Brazil

#### Resource scope

- Estimate type: resource
- Resource group id: resource:0a0f60943567b2850593
- Deposit or zone: Colossus
- Mining method: combined
- Material type: clay
- Resource basis: gross

#### Resource Data

- Category: probable
- Tonnes: 200100000
- Grade: 715
- Grade Unit: ppm

#### Prior Estimate

- Resource Date: 2026-07-01

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-26T00:00:00.000Z

Reasoning: Secondary metal grade reported within the same reserve estimate.

- Positive factor: Significant byproduct grade

Evidence · text

> 715ppm MREO

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**No QP/CP Disclosure**

Polarity: negative

Definition: No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.

Why it applies: no Qualified or Competent Person is named anywhere in the release

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
