COD: Coda Minerals AGM Presentation - November 2026
Original announcement by asx on
- Company
- Coda Minerals
- Ticker
- COD
- Exchange
- ASX
- Region
- South Australia
- Primary commodity
- Copper
- Secondary commodities
- Silver, Cobalt, Zinc
- Document categories
- Resource update, Metallurgy, Other
- Extracted
- 2026-11-11 03:09:01 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Coda Minerals presented a positive AGM update for its Elizabeth Creek project, highlighting a significant JORC-compliant copper-silver resource of 65.5Mt at 1.6% CuEq. Metallurgical testwork shows high recoveries of 94.8% copper and 98.2% silver via a whole-ore chloride leach, with ongoing work to optimize cobalt recovery. The company is advancing a Pre-Feasibility Study to refine project economics and secure funding for on-site finished metal production.
Reasoning: The AGM presentation provides a positive update on the Elizabeth Creek project, showcasing substantial JORC-compliant copper-silver resources, strong metallurgical recoveries for key metals, and clear progress towards a Pre-Feasibility Study in a favorable mining jurisdiction.
Positive factors
- Large JORC-compliant copper-silver resource base (65.5Mt @ 1.6% CuEq)
- High metallurgical recoveries for copper (94.8%) and silver (98.2%) via whole-ore chloride leach
- Progress towards Pre-Feasibility Study (PFS) with detailed workstreams outlined
- Project located in a Tier 1 mining jurisdiction (South Australia)
- Production of finished metals (copper cathode, silver doré) on site
Negative factors
- Cobalt recovery (40%) is significantly lower than copper and silver, requiring further optimization
- PFS is still underway, meaning final project economics are not yet determined
- A notable portion of the resource is in the Inferred category, indicating lower geological confidence
- Resource figures are aggregated from previous releases, not entirely new to this document
Facts used in scoring: 39

Classification and evidence
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: Resource estimates are explicitly stated as JORC 2012 compliant.
Evidence · text
“JORC RESOURCE SUMMARY”
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: Competent Persons are named and their qualifications under JORC Code are stated.
Evidence · text
“Competent Person Statement for JORC 2012 Mineral Resources”
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: A significant portion of the resource is classified as Indicated, indicating reasonable geological confidence.
Evidence · table
“Indicated”
Context: 1.8
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: A portion of the resource is classified as Inferred, indicating lower geological confidence.
Evidence · table
“Inferred”
Context: 5.8
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: Cut-off grades for individual resource estimates are clearly stated.
Evidence · text
“cut-off grade of 1% CuEq”
High Recoverypositive
Recovery at or above the exceptional band for the commodity and processing route.
Why it applies: Copper recovery of 94.8% and silver recovery of 98.2% are exceptional for their respective processing routes.
Evidence · text
“94.8% Copper extraction”
Mill Routeneutral
Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
Why it applies: The base case processing route involves whole-ore chloride leach, which is a mill-based process.
Evidence · text
“WHOLE ORE LEACH”
Refractory Orenegative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Why it applies: The flotation-Albion route involves oxidative acid leach, suggesting some refractory characteristics for the concentrate.
Evidence · text
“OXIDATIVE ACID LEACH”
Byproduct Commodityneutral
The tested commodity is a byproduct rather than the primary economic driver.
Why it applies: Cobalt and zinc are presented as byproduct commodities alongside primary copper and silver.
Evidence · text
“Cobalt Upside opportunity from growing battery demand”
Low Recoverynegative
Recovery below the weak band for the commodity and processing route.
Why it applies: Cobalt recovery of 40% via whole-ore chloride leach is low compared to other metals and requires optimization.
Evidence · text
“40% Cobalt extraction”
POX/BIOX Routeneutral
Pressure or bio-oxidation for refractory ore — high CAPEX and OPEX.
Why it applies: the document describes a pox_biox route ("albion")
Single Domain Onlynegative
Testing limited to one composite or domain — representativeness not established.
Why it applies: only one composite was tested
Extracted facts
Stored fact records: 39. Some facts used in scoring do not have a stored record.
Resource Estimates (33)
indicatedElizabeth Creek · copperTonnes: 1800000Grade: 1.2Grade Unit: %Contained Metal: 22700Contained Unit: tView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- copper
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:c1ee746ab2a00cf63e28
- Deposit or zone
- MG14
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 1800000
- Grade
- 1.2
- Grade Unit
- %
- Contained Metal
- 22700
- Contained Unit
- t
- Cutoff Grade
- 0.5
- Cutoff Unit
- % CuEq
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Metal Eq. Grade
- 1.7
- Metal Eq. Unit
- % CuEq
- Assumptions Disclosed
- Yes
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: The MG14 deposit shows a good copper grade in the Indicated category, contributing to the overall resource base.
Positive factors
- Indicated category
- Good copper grade for open pit
- JORC compliant
- QP signed
Evidence · table
“1.2%”
Context: 1.8
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
indicatedElizabeth Creek · cobaltTonnes: 1800000Grade: 330Grade Unit: ppmContained Metal: 600Contained Unit: tView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- cobalt
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:c1ee746ab2a00cf63e28
- Deposit or zone
- MG14
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 1800000
- Grade
- 330
- Grade Unit
- ppm
- Contained Metal
- 600
- Contained Unit
- t
- Cutoff Grade
- 0.5
- Cutoff Unit
- % CuEq
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Metal Eq. Grade
- 1.7
- Metal Eq. Unit
- % CuEq
- Assumptions Disclosed
- Yes
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: Cobalt is present as a byproduct in the MG14 Indicated resource, adding to the polymetallic nature of the deposit.
Positive factors
- Indicated category
- JORC compliant
- QP signed
Evidence · table
“330”
Context: 1.8
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
indicatedElizabeth Creek · silverTonnes: 1800000Grade: 14Grade Unit: g/tContained Metal: 0.8Contained Unit: mozView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- silver
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:c1ee746ab2a00cf63e28
- Deposit or zone
- MG14
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 1800000
- Grade
- 14
- Grade Unit
- g/t
- Contained Metal
- 0.8
- Contained Unit
- moz
- Cutoff Grade
- 0.5
- Cutoff Unit
- % CuEq
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Metal Eq. Grade
- 1.7
- Metal Eq. Unit
- % CuEq
- Assumptions Disclosed
- Yes
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: Silver contributes to the overall value of the MG14 Indicated resource.
Positive factors
- Indicated category
- JORC compliant
- QP signed
Evidence · table
“14”
Context: 1.8
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
inferredElizabeth Creek · copperTonnes: 5800000Grade: 0.6Grade Unit: %Contained Metal: 36000Contained Unit: tView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- copper
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:0e482301d7124d959019
- Deposit or zone
- Cattle Grid South
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 5800000
- Grade
- 0.6
- Grade Unit
- %
- Contained Metal
- 36000
- Contained Unit
- t
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Assumptions Disclosed
- No
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: The Cattle Grid South deposit provides additional copper resources, though currently in the Inferred category.
Positive factors
- Good copper grade for open pit
Negative factors
- Inferred category
- No CuEq calculated
Evidence · table
“0.6%”
Context: 5.8
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
inferredElizabeth Creek · cobaltTonnes: 5800000Grade: 120Grade Unit: ppmContained Metal: 700Contained Unit: tView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- cobalt
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:0e482301d7124d959019
- Deposit or zone
- Cattle Grid South
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 5800000
- Grade
- 120
- Grade Unit
- ppm
- Contained Metal
- 700
- Contained Unit
- t
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Assumptions Disclosed
- No
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: Cobalt is present as a minor byproduct in the Cattle Grid South Inferred resource.
Negative factors
- Inferred category
- Low cobalt grade
Evidence · table
“120”
Context: 5.8
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
inferredElizabeth Creek · silverTonnes: 5800000Grade: 3.5Grade Unit: g/tContained Metal: 0.7Contained Unit: mozView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- silver
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:0e482301d7124d959019
- Deposit or zone
- Cattle Grid South
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 5800000
- Grade
- 3.5
- Grade Unit
- g/t
- Contained Metal
- 0.7
- Contained Unit
- moz
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Assumptions Disclosed
- No
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: Silver is present as a minor byproduct in the Cattle Grid South Inferred resource.
Negative factors
- Inferred category
- Low silver grade
Evidence · table
“3.5”
Context: 5.8
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
inferredElizabeth Creek · zincTonnes: 5800000Grade: 684Grade Unit: ppmContained Metal: 4000Contained Unit: tView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- zinc
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:0e482301d7124d959019
- Deposit or zone
- Cattle Grid South
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 5800000
- Grade
- 684
- Grade Unit
- ppm
- Contained Metal
- 4000
- Contained Unit
- t
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Assumptions Disclosed
- No
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: Zinc is present as a minor byproduct in the Cattle Grid South Inferred resource.
Negative factors
- Inferred category
- Low zinc grade
Evidence · table
“684”
Context: 5.8
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
indicatedElizabeth Creek · copperTonnes: 17700000Grade: 0.8Grade Unit: %Contained Metal: 136100Contained Unit: tView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- copper
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:c09fcec3723ce6809d82
- Deposit or zone
- Windabout
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 17700000
- Grade
- 0.8
- Grade Unit
- %
- Contained Metal
- 136100
- Contained Unit
- t
- Cutoff Grade
- 0.5
- Cutoff Unit
- % CuEq
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Metal Eq. Grade
- 1.4
- Metal Eq. Unit
- % CuEq
- Assumptions Disclosed
- Yes
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: The Windabout deposit contributes a significant Indicated copper resource to the project.
Positive factors
- Indicated category
- Good copper grade for open pit
- JORC compliant
- QP signed
Evidence · table
“0.8%”
Context: 17.7
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
indicatedElizabeth Creek · cobaltTonnes: 17700000Grade: 490Grade Unit: ppmContained Metal: 8700Contained Unit: tView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- cobalt
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:c09fcec3723ce6809d82
- Deposit or zone
- Windabout
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 17700000
- Grade
- 490
- Grade Unit
- ppm
- Contained Metal
- 8700
- Contained Unit
- t
- Cutoff Grade
- 0.5
- Cutoff Unit
- % CuEq
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Metal Eq. Grade
- 1.4
- Metal Eq. Unit
- % CuEq
- Assumptions Disclosed
- Yes
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: Cobalt is a significant byproduct in the Windabout Indicated resource.
Positive factors
- Indicated category
- JORC compliant
- QP signed
Evidence · table
“490”
Context: 17.7
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
indicatedElizabeth Creek · silverTonnes: 17700000Grade: 8Grade Unit: g/tContained Metal: 4.6Contained Unit: mozView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- silver
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:c09fcec3723ce6809d82
- Deposit or zone
- Windabout
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 17700000
- Grade
- 8
- Grade Unit
- g/t
- Contained Metal
- 4.6
- Contained Unit
- moz
- Cutoff Grade
- 0.5
- Cutoff Unit
- % CuEq
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Metal Eq. Grade
- 1.4
- Metal Eq. Unit
- % CuEq
- Assumptions Disclosed
- Yes
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: Silver is a significant byproduct in the Windabout Indicated resource.
Positive factors
- Indicated category
- JORC compliant
- QP signed
Evidence · table
“8”
Context: 17.7
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
indicatedElizabeth Creek · copperTonnes: 19500000Grade: 0.8Grade Unit: %Contained Metal: 158800Contained Unit: tView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- copper
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:6866299816ef04f04b2c
- Deposit or zone
- Sub Totals (Open Pit)
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 19500000
- Grade
- 0.8
- Grade Unit
- %
- Contained Metal
- 158800
- Contained Unit
- t
- Cutoff Grade
- 0.5
- Cutoff Unit
- % CuEq
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Metal Eq. Grade
- 1.4
- Metal Eq. Unit
- % CuEq
- Assumptions Disclosed
- No
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: The aggregated Indicated open pit resource provides a substantial copper base for the project.
Positive factors
- Significant Indicated tonnage for open pit
- JORC compliant
- QP signed
Negative factors
- Aggregated total, not a single estimate
Evidence · table
“0.8%”
Context: 19.5
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
indicatedElizabeth Creek · cobaltTonnes: 19500000Grade: 480Grade Unit: ppmContained Metal: 9300Contained Unit: tView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- cobalt
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:6866299816ef04f04b2c
- Deposit or zone
- Sub Totals (Open Pit)
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 19500000
- Grade
- 480
- Grade Unit
- ppm
- Contained Metal
- 9300
- Contained Unit
- t
- Cutoff Grade
- 0.5
- Cutoff Unit
- % CuEq
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Metal Eq. Grade
- 1.4
- Metal Eq. Unit
- % CuEq
- Assumptions Disclosed
- No
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: The aggregated Indicated open pit resource includes a notable amount of byproduct cobalt.
Positive factors
- Significant Indicated tonnage for open pit
- JORC compliant
- QP signed
Negative factors
- Aggregated total, not a single estimate
Evidence · table
“480”
Context: 19.5
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
indicatedElizabeth Creek · silverTonnes: 19500000Grade: 8.5Grade Unit: g/tContained Metal: 5.4Contained Unit: mozView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- silver
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:6866299816ef04f04b2c
- Deposit or zone
- Sub Totals (Open Pit)
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 19500000
- Grade
- 8.5
- Grade Unit
- g/t
- Contained Metal
- 5.4
- Contained Unit
- moz
- Cutoff Grade
- 0.5
- Cutoff Unit
- % CuEq
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Metal Eq. Grade
- 1.4
- Metal Eq. Unit
- % CuEq
- Assumptions Disclosed
- No
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: The aggregated Indicated open pit resource includes a notable amount of byproduct silver.
Positive factors
- Significant Indicated tonnage for open pit
- JORC compliant
- QP signed
Negative factors
- Aggregated total, not a single estimate
Evidence · table
“8.5”
Context: 19.5
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
inferredElizabeth Creek · copperTonnes: 5800000Grade: 0.6Grade Unit: %Contained Metal: 36000Contained Unit: tView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- copper
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:ef7e29cb6287273437cf
- Deposit or zone
- Sub Totals (Open Pit)
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 5800000
- Grade
- 0.6
- Grade Unit
- %
- Contained Metal
- 36000
- Contained Unit
- t
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Assumptions Disclosed
- No
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: The aggregated Inferred open pit resource provides additional copper, but with lower confidence.
Positive factors
- Good copper grade for open pit
Negative factors
- Inferred category
- Aggregated total, not a single estimate
- No CuEq calculated
Evidence · table
“0.6%”
Context: 5.8
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
inferredElizabeth Creek · cobaltTonnes: 5800000Grade: 120Grade Unit: ppmContained Metal: 700Contained Unit: tView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- cobalt
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:ef7e29cb6287273437cf
- Deposit or zone
- Sub Totals (Open Pit)
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 5800000
- Grade
- 120
- Grade Unit
- ppm
- Contained Metal
- 700
- Contained Unit
- t
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Assumptions Disclosed
- No
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: The aggregated Inferred open pit resource includes minor byproduct cobalt.
Negative factors
- Inferred category
- Aggregated total, not a single estimate
- Low cobalt grade
Evidence · table
“120”
Context: 5.8
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
inferredElizabeth Creek · silverTonnes: 5800000Grade: 3.5Grade Unit: g/tContained Metal: 1Contained Unit: mozView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- silver
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:ef7e29cb6287273437cf
- Deposit or zone
- Sub Totals (Open Pit)
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 5800000
- Grade
- 3.5
- Grade Unit
- g/t
- Contained Metal
- 1
- Contained Unit
- moz
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Assumptions Disclosed
- No
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: The aggregated Inferred open pit resource includes minor byproduct silver.
Negative factors
- Inferred category
- Aggregated total, not a single estimate
- Low silver grade
Evidence · table
“3.5”
Context: 5.8
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
inferredElizabeth Creek · zincTonnes: 5800000Grade: 684Grade Unit: ppmContained Metal: 4000Contained Unit: tView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- zinc
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:ef7e29cb6287273437cf
- Deposit or zone
- Sub Totals (Open Pit)
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 5800000
- Grade
- 684
- Grade Unit
- ppm
- Contained Metal
- 4000
- Contained Unit
- t
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Cu
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Assumptions Disclosed
- No
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: The aggregated Inferred open pit resource includes minor byproduct zinc.
Negative factors
- Inferred category
- Aggregated total, not a single estimate
- Low zinc grade
Evidence · table
“684”
Context: 5.8
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
indicatedElizabeth Creek · copperTonnes: 37500000Grade: 1.3Grade Unit: %Contained Metal: 485000Contained Unit: tView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- copper
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:115de45792149f67237c
- Deposit or zone
- Emmie Bluff
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 37500000
- Grade
- 1.3
- Grade Unit
- %
- Contained Metal
- 485000
- Contained Unit
- t
- Cutoff Grade
- 1
- Cutoff Unit
- % CuEq
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Metal Eq. Grade
- 1.9
- Metal Eq. Unit
- % CuEq
- Assumptions Disclosed
- Yes
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: Emmie Bluff represents a substantial Indicated underground copper resource with high grades.
Positive factors
- Large Indicated tonnage for underground
- High copper grade
- JORC compliant
- QP signed
Evidence · table
“1.3%”
Context: 37.5
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
indicatedElizabeth Creek · cobaltTonnes: 37500000Grade: 590Grade Unit: ppmContained Metal: 22000Contained Unit: tView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- cobalt
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:115de45792149f67237c
- Deposit or zone
- Emmie Bluff
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 37500000
- Grade
- 590
- Grade Unit
- ppm
- Contained Metal
- 22000
- Contained Unit
- t
- Cutoff Grade
- 1
- Cutoff Unit
- % CuEq
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Metal Eq. Grade
- 1.9
- Metal Eq. Unit
- % CuEq
- Assumptions Disclosed
- Yes
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: Emmie Bluff's Indicated resource includes a substantial amount of byproduct cobalt.
Positive factors
- Large Indicated tonnage for underground
- Significant cobalt byproduct
- JORC compliant
- QP signed
Evidence · table
“590”
Context: 37.5
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
indicatedElizabeth Creek · silverTonnes: 37500000Grade: 17Grade Unit: g/tContained Metal: 20.6Contained Unit: mozView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- silver
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:115de45792149f67237c
- Deposit or zone
- Emmie Bluff
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 37500000
- Grade
- 17
- Grade Unit
- g/t
- Contained Metal
- 20.6
- Contained Unit
- moz
- Cutoff Grade
- 1
- Cutoff Unit
- % CuEq
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Metal Eq. Grade
- 1.9
- Metal Eq. Unit
- % CuEq
- Assumptions Disclosed
- Yes
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: Emmie Bluff's Indicated resource includes a substantial amount of byproduct silver.
Positive factors
- Large Indicated tonnage for underground
- Significant silver byproduct
- JORC compliant
- QP signed
Evidence · table
“17”
Context: 37.5
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
indicatedElizabeth Creek · zincTonnes: 37500000Grade: 1800Grade Unit: ppmContained Metal: 66000Contained Unit: tView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- zinc
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:115de45792149f67237c
- Deposit or zone
- Emmie Bluff
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 37500000
- Grade
- 1800
- Grade Unit
- ppm
- Contained Metal
- 66000
- Contained Unit
- t
- Cutoff Grade
- 1
- Cutoff Unit
- % CuEq
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Metal Eq. Grade
- 1.9
- Metal Eq. Unit
- % CuEq
- Assumptions Disclosed
- Yes
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: Emmie Bluff's Indicated resource includes a substantial amount of byproduct zinc.
Positive factors
- Large Indicated tonnage for underground
- Significant zinc byproduct
- JORC compliant
- QP signed
Evidence · table
“1800”
Context: 37.5
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
inferredElizabeth Creek · copperTonnes: 2700000Grade: 0.9Grade Unit: %Contained Metal: 26000Contained Unit: tView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- copper
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:cb4d6b2f5c67e879c211
- Deposit or zone
- Emmie Bluff
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 2700000
- Grade
- 0.9
- Grade Unit
- %
- Contained Metal
- 26000
- Contained Unit
- t
- Cutoff Grade
- 1
- Cutoff Unit
- % CuEq
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Metal Eq. Grade
- 1.3
- Metal Eq. Unit
- % CuEq
- Assumptions Disclosed
- Yes
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: Emmie Bluff's Inferred resource provides additional copper, but with lower confidence.
Positive factors
- Good copper grade for underground
Negative factors
- Inferred category
Evidence · table
“0.9%”
Context: 2.7
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
inferredElizabeth Creek · cobaltTonnes: 2700000Grade: 280Grade Unit: ppmContained Metal: 1000Contained Unit: tView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- cobalt
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:cb4d6b2f5c67e879c211
- Deposit or zone
- Emmie Bluff
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 2700000
- Grade
- 280
- Grade Unit
- ppm
- Contained Metal
- 1000
- Contained Unit
- t
- Cutoff Grade
- 1
- Cutoff Unit
- % CuEq
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Metal Eq. Grade
- 1.3
- Metal Eq. Unit
- % CuEq
- Assumptions Disclosed
- Yes
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: Emmie Bluff's Inferred resource includes byproduct cobalt, but with lower confidence.
Negative factors
- Inferred category
- Lower cobalt grade
Evidence · table
“280”
Context: 2.7
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
inferredElizabeth Creek · silverTonnes: 2700000Grade: 12Grade Unit: g/tContained Metal: 1.1Contained Unit: mozView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- silver
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:cb4d6b2f5c67e879c211
- Deposit or zone
- Emmie Bluff
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 2700000
- Grade
- 12
- Grade Unit
- g/t
- Contained Metal
- 1.1
- Contained Unit
- moz
- Cutoff Grade
- 1
- Cutoff Unit
- % CuEq
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Metal Eq. Grade
- 1.3
- Metal Eq. Unit
- % CuEq
- Assumptions Disclosed
- Yes
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: Emmie Bluff's Inferred resource includes byproduct silver, but with lower confidence.
Negative factors
- Inferred category
Evidence · table
“12”
Context: 2.7
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
inferredElizabeth Creek · zincTonnes: 2700000Grade: 1700Grade Unit: ppmContained Metal: 5000Contained Unit: tView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- zinc
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:cb4d6b2f5c67e879c211
- Deposit or zone
- Emmie Bluff
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 2700000
- Grade
- 1700
- Grade Unit
- ppm
- Contained Metal
- 5000
- Contained Unit
- t
- Cutoff Grade
- 1
- Cutoff Unit
- % CuEq
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Metal Eq. Grade
- 1.3
- Metal Eq. Unit
- % CuEq
- Assumptions Disclosed
- Yes
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: Emmie Bluff's Inferred resource includes byproduct zinc, but with lower confidence.
Negative factors
- Inferred category
Evidence · table
“1700”
Context: 2.7
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
inferredElizabeth Creek · copperTonnes: 40200000Grade: 1.3Grade Unit: %Contained Metal: 511000Contained Unit: tView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- copper
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:f2e0b1cd89d5a87ebba1
- Deposit or zone
- Sub Total (Underground)
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 40200000
- Grade
- 1.3
- Grade Unit
- %
- Contained Metal
- 511000
- Contained Unit
- t
- Cutoff Grade
- 1
- Cutoff Unit
- % CuEq
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Metal Eq. Grade
- 1.9
- Metal Eq. Unit
- % CuEq
- Assumptions Disclosed
- No
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: The aggregated underground resource provides a very substantial copper base, though it includes an Inferred component.
Positive factors
- Large underground resource
- High copper grade
- JORC compliant
- QP signed
Negative factors
- Aggregated total, not a single estimate
- Includes Inferred category
Evidence · table
“1.3%”
Context: 40.2
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
inferredElizabeth Creek · cobaltTonnes: 40200000Grade: 570Grade Unit: ppmContained Metal: 23000Contained Unit: tView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- cobalt
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:f2e0b1cd89d5a87ebba1
- Deposit or zone
- Sub Total (Underground)
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 40200000
- Grade
- 570
- Grade Unit
- ppm
- Contained Metal
- 23000
- Contained Unit
- t
- Cutoff Grade
- 1
- Cutoff Unit
- % CuEq
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Metal Eq. Grade
- 1.9
- Metal Eq. Unit
- % CuEq
- Assumptions Disclosed
- No
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: The aggregated underground resource includes a substantial amount of byproduct cobalt.
Positive factors
- Large underground resource
- Significant cobalt byproduct
- JORC compliant
- QP signed
Negative factors
- Aggregated total, not a single estimate
- Includes Inferred category
Evidence · table
“570”
Context: 40.2
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
inferredElizabeth Creek · silverTonnes: 40200000Grade: 16.8Grade Unit: g/tContained Metal: 21.7Contained Unit: mozView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- silver
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:f2e0b1cd89d5a87ebba1
- Deposit or zone
- Sub Total (Underground)
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 40200000
- Grade
- 16.8
- Grade Unit
- g/t
- Contained Metal
- 21.7
- Contained Unit
- moz
- Cutoff Grade
- 1
- Cutoff Unit
- % CuEq
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Metal Eq. Grade
- 1.9
- Metal Eq. Unit
- % CuEq
- Assumptions Disclosed
- No
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: The aggregated underground resource includes a substantial amount of byproduct silver.
Positive factors
- Large underground resource
- Significant silver byproduct
- JORC compliant
- QP signed
Negative factors
- Aggregated total, not a single estimate
- Includes Inferred category
Evidence · table
“16.8”
Context: 40.2
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
inferredElizabeth Creek · zincTonnes: 40200000Grade: 1700Grade Unit: ppmContained Metal: 70000Contained Unit: tView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- zinc
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:f2e0b1cd89d5a87ebba1
- Deposit or zone
- Sub Total (Underground)
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 40200000
- Grade
- 1700
- Grade Unit
- ppm
- Contained Metal
- 70000
- Contained Unit
- t
- Cutoff Grade
- 1
- Cutoff Unit
- % CuEq
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Metal Eq. Grade
- 1.9
- Metal Eq. Unit
- % CuEq
- Assumptions Disclosed
- No
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: The aggregated underground resource includes a substantial amount of byproduct zinc.
Positive factors
- Large underground resource
- Significant zinc byproduct
- JORC compliant
- QP signed
Negative factors
- Aggregated total, not a single estimate
- Includes Inferred category
Evidence · table
“1700”
Context: 40.2
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
inferredElizabeth Creek · copperTonnes: 65500000Contained Metal: 705800Contained Unit: tView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- copper
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:cad1e3a7ed797e7f31dc
- Deposit or zone
- Project Wide Total
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 65500000
- Contained Metal
- 705800
- Contained Unit
- t
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Assumptions Disclosed
- No
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: The project-wide total represents a very significant contained copper resource, underpinning the project's scale.
Positive factors
- Very large total contained copper
- JORC compliant
- QP signed
Negative factors
- Aggregated total, not a single estimate
- Includes Inferred category
- No specific grade provided for total
Evidence · table
“705,800t”
Context: 65.5
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
inferredElizabeth Creek · cobaltTonnes: 65500000Contained Metal: 33000Contained Unit: tView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- cobalt
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:cad1e3a7ed797e7f31dc
- Deposit or zone
- Project Wide Total
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 65500000
- Contained Metal
- 33000
- Contained Unit
- t
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Assumptions Disclosed
- No
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: The project-wide total includes a very significant contained cobalt resource, adding to the polymetallic value.
Positive factors
- Very large total contained cobalt
- JORC compliant
- QP signed
Negative factors
- Aggregated total, not a single estimate
- Includes Inferred category
- No specific grade provided for total
Evidence · table
“33,000t”
Context: 65.5
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
inferredElizabeth Creek · silverTonnes: 65500000Contained Metal: 28Contained Unit: mozView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- silver
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:cad1e3a7ed797e7f31dc
- Deposit or zone
- Project Wide Total
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 65500000
- Contained Metal
- 28
- Contained Unit
- moz
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Assumptions Disclosed
- No
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: The project-wide total includes a very significant contained silver resource, adding to the polymetallic value.
Positive factors
- Very large total contained silver
- JORC compliant
- QP signed
Negative factors
- Aggregated total, not a single estimate
- Includes Inferred category
- No specific grade provided for total
Evidence · table
“28 Moz”
Context: 65.5
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
inferredElizabeth Creek · zincTonnes: 65500000Contained Metal: 75000Contained Unit: tView all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- zinc
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Tim Callaghan, Dr Michael Cunningham, Mr Matthew Weber
- Resource group id
- resource:cad1e3a7ed797e7f31dc
- Deposit or zone
- Project Wide Total
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 65500000
- Contained Metal
- 75000
- Contained Unit
- t
Prior Estimate
- Resource Date
- 2026-10-29
Metal Equivalent
- Assumptions Disclosed
- No
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: The project-wide total includes a very significant contained zinc resource, adding to the polymetallic value.
Positive factors
- Very large total contained zinc
- JORC compliant
- QP signed
Negative factors
- Aggregated total, not a single estimate
- Includes Inferred category
- No specific grade provided for total
Evidence · table
“75,000t”
Context: 65.5
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
Metallurgical Results (6)
leachElizabeth Creek · copperRecovery: 94.8 %View all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- copper
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Test Work
- Program Status
- preliminary
- Test Type
- leach
- Processing Route
- whole-ore chloride leach
- Sample
- Emmie Bluff deposit
- Grind P80
- 75 µm
Recovery
- Recovery
- 94.8 %
- Recovery Basis
- actual_test
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: The whole-ore chloride leach process demonstrates exceptional copper recovery, which is highly positive for project economics.
Positive factors
- Exceptional copper recovery
- Low grind size (75μm) for high recovery
- Whole-ore leach simplifies process
Evidence · text
“94.8% Copper extraction”
Tags used in scoring
High Recoverypositive
Recovery at or above the exceptional band for the commodity and processing route.
Why it applies: 94.8% is at or above the exceptional band (92%)
leachElizabeth Creek · silverRecovery: 98.2 %View all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- silver
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Test Work
- Program Status
- preliminary
- Test Type
- leach
- Processing Route
- whole-ore chloride leach
- Sample
- Emmie Bluff deposit
- Grind P80
- 75 µm
Recovery
- Recovery
- 98.2 %
- Recovery Basis
- actual_test
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: The whole-ore chloride leach process demonstrates exceptional silver recovery, which is highly positive for project economics.
Positive factors
- Exceptional silver recovery
- Low grind size (75μm) for high recovery
- Whole-ore leach simplifies process
Evidence · text
“98.2% Silver extraction”
Tags used in scoring
High Recoverypositive
Recovery at or above the exceptional band for the commodity and processing route.
Why it applies: 98.2% is at or above the exceptional band (90%)
leachElizabeth Creek · cobaltRecovery: 40 %View all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- cobalt
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Test Work
- Program Status
- preliminary
- Test Type
- leach
- Processing Route
- whole-ore chloride leach
- Sample
- Emmie Bluff deposit
- Grind P80
- 75 µm
Recovery
- Recovery
- 40 %
- Recovery Basis
- actual_test
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: Cobalt recovery is currently low, indicating a need for further process optimization to realize its full economic potential.
Negative factors
- Low cobalt recovery
- Ongoing testwork needed for optimization
Evidence · text
“40% Cobalt extraction”
flotation, oxidative acid leachElizabeth Creek · copperRecovery: 83 %View all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- copper
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Test Work
- Program Status
- preliminary
- Test Type
- flotation, oxidative acid leach
- Processing Route
- flotation to a copper-cobalt concentrate, then an Albion oxidative leach of that concentrate
- Grind P80
- 58 µm
Recovery
- Recovery
- 83 %
- Recovery Basis
- actual_test
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: The flotation-Albion route shows strong copper recovery, offering an alternative processing option.
Positive factors
- Strong copper recovery for flotation-leach route
- Lower grind size (58μm) for improved liberation
Evidence · text
“83% Cu”
Tags used in scoring
Mill Routeneutral
Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
Why it applies: processing_route matches the flotation signal
POX/BIOX Routeneutral
Pressure or bio-oxidation for refractory ore — high CAPEX and OPEX.
Why it applies: processing_route matches the pox_biox signal
flotation, oxidative acid leachElizabeth Creek · silverRecovery: 82 %View all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- silver
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Test Work
- Program Status
- preliminary
- Test Type
- flotation, oxidative acid leach
- Processing Route
- flotation to a copper-cobalt concentrate, then an Albion oxidative leach of that concentrate
- Grind P80
- 58 µm
Recovery
- Recovery
- 82 %
- Recovery Basis
- actual_test
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: The flotation-Albion route shows strong silver recovery, offering an alternative processing option.
Positive factors
- Strong silver recovery for flotation-leach route
- Lower grind size (58μm) for improved liberation
Evidence · text
“82% Ag”
Tags used in scoring
Mill Routeneutral
Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
Why it applies: processing_route matches the flotation signal
POX/BIOX Routeneutral
Pressure or bio-oxidation for refractory ore — high CAPEX and OPEX.
Why it applies: processing_route matches the pox_biox signal
flotation, oxidative acid leachElizabeth Creek · cobaltRecovery: 86 %View all detailsHide details
Identity
- Project
- Elizabeth Creek
- Commodity
- cobalt
- Region
- australia_sa
- Reported Region
- South Australia
- Ticker
- COD
Test Work
- Program Status
- preliminary
- Test Type
- flotation, oxidative acid leach
- Processing Route
- flotation to a copper-cobalt concentrate, then an Albion oxidative leach of that concentrate
- Grind P80
- 58 µm
Recovery
- Recovery
- 86 %
- Recovery Basis
- actual_test
Location
- Loc. Confidence
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: The flotation-Albion route demonstrates very strong cobalt recovery, which is a significant improvement over the chloride leach base case for cobalt.
Positive factors
- Very strong cobalt recovery for flotation-leach route
- Lower grind size (58μm) for improved liberation
Evidence · text
“86% Co”
Tags used in scoring
Mill Routeneutral
Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
Why it applies: processing_route matches the flotation signal
POX/BIOX Routeneutral
Pressure or bio-oxidation for refractory ore — high CAPEX and OPEX.
Why it applies: processing_route matches the pox_biox signal
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.