Summary

The updated Scoping Study for the Halls Creek Project outlines a robust development strategy for copper, zinc, and silver production, yielding a pre-tax NPV10 of A$317 million and an IRR of 47%. The study incorporates silver recovery for the first time, establishing a third revenue stream, and proposes a capital-efficient common processing plant with an initial capital cost of A$75 million and a three-year payback. The project targets average annual production of 4,000 t copper, 13,000 t zinc, and 130,000 oz silver over an 11-year mine life, with a Preliminary Feasibility Study planned for H1 2028.

Reasoning: The updated Scoping Study presents robust economics for the Halls Creek Project, driven by the integration of silver recovery, a capital-efficient common processing plant, and strong commodity price assumptions, de-risking the project's development pathway. While preliminary, the results are highly positive, though silver recovery requires further optimization.

Positive factors

  • Strong pre-tax NPV10 of A$317 million and IRR of 47%.
  • Low initial capital of A$75 million with a quick 3-year payback.
  • Silver recovery incorporated for the first time, adding a significant third revenue stream.
  • Capital-efficient common processing plant for three saleable metals.
  • District-scale growth potential with capacity for additional regional feedstock.
  • Exceptional copper recovery (82.5%) and strong zinc recovery (85%) for Onedin.

Negative factors

  • Study is at a preliminary Scoping Study level of accuracy (+/-35%).
  • Metallurgical recoveries are based on bench-scale testwork only.
  • Low silver recovery (30%) indicates a need for significant optimization.
  • Limited domain coverage for Sandiego in metallurgical testwork.

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 28

Atlas analysis — Cobalt Blue Holdings Limited: COB: Updated Halls Creek Scoping Study. indicated 1500000 tonnes; 65% recovery

Classification and evidence

JORC Compliantpositive · Story-specific tag

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The underlying Mineral Resource Estimates for the production target were prepared in accordance with the 2012 JORC Code.

Evidence · text

“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves 2012 edition (2012 JORC Code)”

QP/CP Signedpositive · Story-specific tag

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: The Mineral Resource Estimates underpinning the production target were prepared by a competent person in accordance with the JORC Code.

Evidence · text

“prepared by a competent person in accordance with the requirements of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves 2012 edition (2012 JORC Code)”

PEA-Supportingneutral · Story-specific tag

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: The document is a Scoping Study, which is a preliminary technical and economic study to assess project viability and justify further study phases.

Evidence · text

“The Scoping Study referenced in this announcement has been undertaken to assess the potential viability of the Halls Creek Project”

Heap Leach Routeneutral

Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.

Why it applies: The proposed processing method for copper, zinc, and silver recovery is a heap leach process.

Evidence · text

“Cobalt Blue has developed a single heap leach process that treats both oxide and sulphide mineralisation to recover copper, zinc and silver products.”

Bench Scale Onlynegative

Only preliminary bench tests completed — no locked-cycle or pilot work.

Why it applies: The metallurgical recoveries are based on bench scale testwork, indicating preliminary test maturity.

Evidence · text

“bench scale testwork completed by Cobalt Blue using historical drill core samples”

Multi-Domain Testedpositive

Variability across ore domains (oxide, transition, fresh) has been addressed.

Why it applies: Testwork included multiple composites covering oxide, transition, and fresh material for Onedin.

Evidence · text

“Seven composites assessed selected Onedin oxide and transition cases, a fresh-material diagnostic case”

Single Domain Onlynegative

Testing limited to one composite or domain — representativeness not established.

Why it applies: Sample availability constrained coverage for Sandiego, which was only represented in combined Onedin and Sandiego blends, limiting specific domain variability testing.

Evidence · text

“Sample availability constrained coverage, particularly at Sandiego, which was represented only in combined Onedin and Sandiego blends.”

High Recoverypositive

Recovery at or above the exceptional band for the commodity and processing route.

Why it applies: Copper recovery of 82.5% for Onedin via heap leach exceeds the exceptional threshold of 80% for this processing route.

Evidence · table

“82.5”

Context: Onedin

High Recoverypositive

Recovery at or above the exceptional band for the commodity and processing route.

Why it applies: Zinc recovery of 85% for Onedin/Sandiego meets the strong threshold for this commodity.

Evidence · table

“85”

Context: Onedin

High Recoverypositive

Recovery at or above the exceptional band for the commodity and processing route.

Why it applies: Zinc recovery of 85% for Onedin/Sandiego meets the strong threshold for this commodity.

Evidence · table

“85”

Context: Sandiego

Low Recoverynegative

Recovery below the weak band for the commodity and processing route.

Why it applies: Silver recovery of 30% for Onedin/Sandiego via heap leach is below the weak threshold of 45% for this processing route.

Evidence · table

“30”

Context: Onedin

Low Recoverynegative

Recovery below the weak band for the commodity and processing route.

Why it applies: Silver recovery of 30% for Onedin/Sandiego via heap leach is below the weak threshold of 45% for this processing route.

Evidence · table

“30”

Context: Sandiego

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: the document describes a mill_cil route ("concentrator")

Extracted facts

Stored fact records: 27. Some facts used in scoring do not have a stored record.

Resource Estimates (24)

indicatedcopperTonnes: 1500000Grade: 1.1Grade Unit: %Contained Metal: 16.5Contained Unit: ktView all details
Link to this fact

Identity

Commodity
copper
Ticker
COB

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:83cd4946ad1cc5fda502
Mining method
combined

Resource Data

Category
indicated
Tonnes
1500000
Grade
1.1
Grade Unit
%
Contained Metal
16.5
Contained Unit
kt

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-10T00:00:00.000Z

Reasoning: Expanded from multi-commodity resource table for completeness.

Negative factors

  • Fact expanded from resource table columns (model omitted this commodity).

Evidence · table

“1.1”

Context: 1.5

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedzincTonnes: 1500000Grade: 9Grade Unit: ktView all details
Link to this fact

Identity

Commodity
zinc
Ticker
COB

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:83cd4946ad1cc5fda502
Mining method
combined

Resource Data

Category
indicated
Tonnes
1500000
Grade
9
Grade Unit
kt

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-10T00:00:00.000Z

Reasoning: Expanded from multi-commodity resource table for completeness.

Negative factors

  • Fact expanded from resource table columns (model omitted this commodity).

Evidence · table

“9.0”

Context: 1.5

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedsilverTonnes: 1500000Grade: 2.27Grade Unit: mozView all details
Link to this fact

Identity

Commodity
silver
Ticker
COB

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:83cd4946ad1cc5fda502
Mining method
combined

Resource Data

Category
indicated
Tonnes
1500000
Grade
2.27
Grade Unit
moz

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-10T00:00:00.000Z

Reasoning: Expanded from multi-commodity resource table for completeness.

Negative factors

  • Fact expanded from resource table columns (model omitted this commodity).

Evidence · table

“2.27”

Context: 1.5

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedcopperTonnes: 3300000Grade: 0.5Grade Unit: %Contained Metal: 16.5Contained Unit: ktView all details
Link to this fact

Identity

Commodity
copper
Ticker
COB

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:6be6b95d5a2110f02a19
Mining method
combined

Resource Data

Category
indicated
Tonnes
3300000
Grade
0.5
Grade Unit
%
Contained Metal
16.5
Contained Unit
kt

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-10T00:00:00.000Z

Reasoning: Expanded from multi-commodity resource table for completeness.

Negative factors

  • Fact expanded from resource table columns (model omitted this commodity).

Evidence · table

“0.5”

Context: 3.3

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedzincTonnes: 3300000Grade: 141.9Grade Unit: ktView all details
Link to this fact

Identity

Commodity
zinc
Ticker
COB

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:6be6b95d5a2110f02a19
Mining method
combined

Resource Data

Category
indicated
Tonnes
3300000
Grade
141.9
Grade Unit
kt

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-10T00:00:00.000Z

Reasoning: Expanded from multi-commodity resource table for completeness.

Negative factors

  • Fact expanded from resource table columns (model omitted this commodity).

Evidence · table

“141.9”

Context: 3.3

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedsilverTonnes: 3300000Grade: 3.61Grade Unit: mozView all details
Link to this fact

Identity

Commodity
silver
Ticker
COB

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:6be6b95d5a2110f02a19
Mining method
combined

Resource Data

Category
indicated
Tonnes
3300000
Grade
3.61
Grade Unit
moz

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-10T00:00:00.000Z

Reasoning: Expanded from multi-commodity resource table for completeness.

Negative factors

  • Fact expanded from resource table columns (model omitted this commodity).

Evidence · table

“3.61”

Context: 3.3

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedcopperTonnes: 1700000Grade: 2.3Grade Unit: %Contained Metal: 39.1Contained Unit: ktView all details
Link to this fact

Identity

Commodity
copper
Ticker
COB

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:e9b2086022303cd7bbfb
Mining method
combined

Resource Data

Category
indicated
Tonnes
1700000
Grade
2.3
Grade Unit
%
Contained Metal
39.1
Contained Unit
kt

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-10T00:00:00.000Z

Reasoning: Expanded from multi-commodity resource table for completeness.

Negative factors

  • Fact expanded from resource table columns (model omitted this commodity).

Evidence · table

“2.3”

Context: 1.7

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedzincTonnes: 1700000Grade: 13.6Grade Unit: ktView all details
Link to this fact

Identity

Commodity
zinc
Ticker
COB

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:e9b2086022303cd7bbfb
Mining method
combined

Resource Data

Category
indicated
Tonnes
1700000
Grade
13.6
Grade Unit
kt

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-10T00:00:00.000Z

Reasoning: Expanded from multi-commodity resource table for completeness.

Negative factors

  • Fact expanded from resource table columns (model omitted this commodity).

Evidence · table

“13.6”

Context: 1.7

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedsilverTonnes: 1700000Grade: 0.98Grade Unit: mozView all details
Link to this fact

Identity

Commodity
silver
Ticker
COB

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:e9b2086022303cd7bbfb
Mining method
combined

Resource Data

Category
indicated
Tonnes
1700000
Grade
0.98
Grade Unit
moz

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-10T00:00:00.000Z

Reasoning: Expanded from multi-commodity resource table for completeness.

Negative factors

  • Fact expanded from resource table columns (model omitted this commodity).

Evidence · table

“0.98”

Context: 1.7

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredcopperTonnes: 300000Grade: 1.6Grade Unit: %Contained Metal: 4.8Contained Unit: ktView all details
Link to this fact

Identity

Commodity
copper
Ticker
COB

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:831e896cd94b4b87403b
Mining method
combined

Resource Data

Category
inferred
Tonnes
300000
Grade
1.6
Grade Unit
%
Contained Metal
4.8
Contained Unit
kt

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-10T00:00:00.000Z

Reasoning: Expanded from multi-commodity resource table for completeness.

Negative factors

  • Fact expanded from resource table columns (model omitted this commodity).

Evidence · table

“1.6”

Context: 0.3

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredzincTonnes: 300000Grade: 9Grade Unit: ktView all details
Link to this fact

Identity

Commodity
zinc
Ticker
COB

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:831e896cd94b4b87403b
Mining method
combined

Resource Data

Category
inferred
Tonnes
300000
Grade
9
Grade Unit
kt

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-10T00:00:00.000Z

Reasoning: Expanded from multi-commodity resource table for completeness.

Negative factors

  • Fact expanded from resource table columns (model omitted this commodity).

Evidence · table

“9.0”

Context: 0.3

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredsilverTonnes: 300000Grade: 0.05Grade Unit: mozView all details
Link to this fact

Identity

Commodity
silver
Ticker
COB

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:831e896cd94b4b87403b
Mining method
combined

Resource Data

Category
inferred
Tonnes
300000
Grade
0.05
Grade Unit
moz

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-10T00:00:00.000Z

Reasoning: Expanded from multi-commodity resource table for completeness.

Negative factors

  • Fact expanded from resource table columns (model omitted this commodity).

Evidence · table

“0.05”

Context: 0.3

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredcopperTonnes: 2000000Grade: 2.2Grade Unit: %Contained Metal: 43.9Contained Unit: ktView all details
Link to this fact

Identity

Commodity
copper
Ticker
COB

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:4849faabc3a13f963672
Mining method
combined

Resource Data

Category
inferred
Tonnes
2000000
Grade
2.2
Grade Unit
%
Contained Metal
43.9
Contained Unit
kt

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-10T00:00:00.000Z

Reasoning: Expanded from multi-commodity resource table for completeness.

Negative factors

  • Fact expanded from resource table columns (model omitted this commodity).

Evidence · table

“2.2”

Context: 2.0

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredzincTonnes: 2000000Grade: 22.6Grade Unit: ktView all details
Link to this fact

Identity

Commodity
zinc
Ticker
COB

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:4849faabc3a13f963672
Mining method
combined

Resource Data

Category
inferred
Tonnes
2000000
Grade
22.6
Grade Unit
kt

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-10T00:00:00.000Z

Reasoning: Expanded from multi-commodity resource table for completeness.

Negative factors

  • Fact expanded from resource table columns (model omitted this commodity).

Evidence · table

“22.6”

Context: 2.0

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredsilverTonnes: 2000000Grade: 1.03Grade Unit: mozView all details
Link to this fact

Identity

Commodity
silver
Ticker
COB

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:4849faabc3a13f963672
Mining method
combined

Resource Data

Category
inferred
Tonnes
2000000
Grade
1.03
Grade Unit
moz

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-10T00:00:00.000Z

Reasoning: Expanded from multi-commodity resource table for completeness.

Negative factors

  • Fact expanded from resource table columns (model omitted this commodity).

Evidence · table

“1.03”

Context: 2.0

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedcopperTonnes: 2000000Grade: 0.6Grade Unit: %Contained Metal: 12Contained Unit: ktView all details
Link to this fact

Identity

Commodity
copper
Ticker
COB

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:916c5fbc7cbee11917ba
Mining method
combined

Resource Data

Category
indicated
Tonnes
2000000
Grade
0.6
Grade Unit
%
Contained Metal
12
Contained Unit
kt

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-10T00:00:00.000Z

Reasoning: Expanded from multi-commodity resource table for completeness.

Negative factors

  • Fact expanded from resource table columns (model omitted this commodity).

Evidence · table

“0.6”

Context: 2.0

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedzincTonnes: 2000000Grade: 146Grade Unit: ktView all details
Link to this fact

Identity

Commodity
zinc
Ticker
COB

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:916c5fbc7cbee11917ba
Mining method
combined

Resource Data

Category
indicated
Tonnes
2000000
Grade
146
Grade Unit
kt

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-10T00:00:00.000Z

Reasoning: Expanded from multi-commodity resource table for completeness.

Negative factors

  • Fact expanded from resource table columns (model omitted this commodity).

Evidence · table

“146.0”

Context: 2.0

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedsilverTonnes: 2000000Grade: 2.25Grade Unit: mozView all details
Link to this fact

Identity

Commodity
silver
Ticker
COB

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:916c5fbc7cbee11917ba
Mining method
combined

Resource Data

Category
indicated
Tonnes
2000000
Grade
2.25
Grade Unit
moz

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-10T00:00:00.000Z

Reasoning: Expanded from multi-commodity resource table for completeness.

Negative factors

  • Fact expanded from resource table columns (model omitted this commodity).

Evidence · table

“2.25”

Context: 2.0

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredcopperTonnes: 100000Grade: 0.2Grade Unit: %Contained Metal: 0.2Contained Unit: ktView all details
Link to this fact

Identity

Commodity
copper
Ticker
COB

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:b8e58556bcd50cfad7c0
Mining method
combined

Resource Data

Category
inferred
Tonnes
100000
Grade
0.2
Grade Unit
%
Contained Metal
0.2
Contained Unit
kt

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-10T00:00:00.000Z

Reasoning: Expanded from multi-commodity resource table for completeness.

Negative factors

  • Fact expanded from resource table columns (model omitted this commodity).

Evidence · table

“0.2”

Context: 0.1

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredzincTonnes: 100000Grade: 6.1Grade Unit: ktView all details
Link to this fact

Identity

Commodity
zinc
Ticker
COB

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:b8e58556bcd50cfad7c0
Mining method
combined

Resource Data

Category
inferred
Tonnes
100000
Grade
6.1
Grade Unit
kt

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-10T00:00:00.000Z

Reasoning: Expanded from multi-commodity resource table for completeness.

Negative factors

  • Fact expanded from resource table columns (model omitted this commodity).

Evidence · table

“6.1”

Context: 0.1

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredsilverTonnes: 100000Grade: 0.03Grade Unit: mozView all details
Link to this fact

Identity

Commodity
silver
Ticker
COB

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:b8e58556bcd50cfad7c0
Mining method
combined

Resource Data

Category
inferred
Tonnes
100000
Grade
0.03
Grade Unit
moz

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-10T00:00:00.000Z

Reasoning: Expanded from multi-commodity resource table for completeness.

Negative factors

  • Fact expanded from resource table columns (model omitted this commodity).

Evidence · table

“0.03”

Context: 0.1

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredcopperTonnes: 2100000Grade: 0.6Grade Unit: %Contained Metal: 12.2Contained Unit: ktView all details
Link to this fact

Identity

Commodity
copper
Ticker
COB

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:fdd577acb38773967ce1
Mining method
combined

Resource Data

Category
inferred
Tonnes
2100000
Grade
0.6
Grade Unit
%
Contained Metal
12.2
Contained Unit
kt

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-10T00:00:00.000Z

Reasoning: Expanded from multi-commodity resource table for completeness.

Negative factors

  • Fact expanded from resource table columns (model omitted this commodity).

Evidence · table

“0.6”

Context: 2.1

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredzincTonnes: 2100000Grade: 152.1Grade Unit: ktView all details
Link to this fact

Identity

Commodity
zinc
Ticker
COB

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:fdd577acb38773967ce1
Mining method
combined

Resource Data

Category
inferred
Tonnes
2100000
Grade
152.1
Grade Unit
kt

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-10T00:00:00.000Z

Reasoning: Expanded from multi-commodity resource table for completeness.

Negative factors

  • Fact expanded from resource table columns (model omitted this commodity).

Evidence · table

“152.1”

Context: 2.1

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredsilverTonnes: 2100000Grade: 2.28Grade Unit: mozView all details
Link to this fact

Identity

Commodity
silver
Ticker
COB

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:fdd577acb38773967ce1
Mining method
combined

Resource Data

Category
inferred
Tonnes
2100000
Grade
2.28
Grade Unit
moz

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-10T00:00:00.000Z

Reasoning: Expanded from multi-commodity resource table for completeness.

Negative factors

  • Fact expanded from resource table columns (model omitted this commodity).

Evidence · table

“2.28”

Context: 2.1

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Metallurgical Results (3)

column leachHalls Creek Project · copperRecovery: 65 %View all details
Link to this fact

Identity

Project
Halls Creek Project
Commodity
copper
Region
australia_wa
Reported Region
Western Australia
Ticker
COB

Test Work

Program Status
preliminary
Test Type
column leach
Processing Route
saline acid leach under oxidising conditions
Sample
selected Onedin oxide and transition cases, a fresh-material diagnostic case and two Onedin–Sandiego blends

Recovery

Recovery
65 %

Lab

Laboratory
Bureau Veritas and Cobalt Blue's Broken Hill Technology Centre (BHTC)

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-10T00:00:00.000Z

Reasoning: The moderate copper recovery of 65% from Sandiego is acceptable for a heap leach operation, but further work is needed to confirm variability given the limited domain coverage.

Positive factors

  • Moderate copper recovery (65%) is acceptable for heap leach.

Negative factors

  • Recoveries are based on bench-scale testwork only.
  • Limited domain coverage for Sandiego in testwork.

Evidence · table

“65”

Context: Sandiego

Tags used in scoring

Heap Leach Routeneutral

Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.

Why it applies: processing_route matches the heap_leach signal

Byproduct Commodityneutral

The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: the release describes a byproduct credit

column leachHalls Creek Project · zincRecovery: 85 %View all details
Link to this fact

Identity

Project
Halls Creek Project
Commodity
zinc
Region
australia_wa
Reported Region
Western Australia
Ticker
COB

Test Work

Program Status
preliminary
Test Type
column leach
Processing Route
saline acid leach under oxidising conditions
Sample
selected Onedin oxide and transition cases, a fresh-material diagnostic case and two Onedin–Sandiego blends

Recovery

Recovery
85 %

Lab

Laboratory
Bureau Veritas and Cobalt Blue's Broken Hill Technology Centre (BHTC)

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-10T00:00:00.000Z

Reasoning: The strong zinc recovery of 85% from Sandiego is positive for the project, but further work is needed to confirm variability given the limited domain coverage.

Positive factors

  • Strong zinc recovery (85%) for heap leach.

Negative factors

  • Recoveries are based on bench-scale testwork only.
  • Limited domain coverage for Sandiego in testwork.

Evidence · table

“85”

Context: Sandiego

Tags used in scoring

Heap Leach Routeneutral

Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.

Why it applies: processing_route matches the heap_leach signal

Byproduct Commodityneutral

The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: the release describes a byproduct credit

column leachHalls Creek Project · silverRecovery: 30 %View all details
Link to this fact

Identity

Project
Halls Creek Project
Commodity
silver
Region
australia_wa
Reported Region
Western Australia
Ticker
COB

Test Work

Program Status
preliminary
Test Type
column leach
Processing Route
saline acid leach under oxidising conditions
Sample
selected Onedin oxide and transition cases, a fresh-material diagnostic case and two Onedin–Sandiego blends

Recovery

Recovery
30 %

Lab

Laboratory
Bureau Veritas and Cobalt Blue's Broken Hill Technology Centre (BHTC)

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-10T00:00:00.000Z

Reasoning: The low silver recovery of 30% from Sandiego indicates a need for significant metallurgical optimization, especially given the limited domain coverage in the testwork.

Positive factors

  • Silver recovery incorporated for the first time, adding a new revenue stream.

Negative factors

  • Low silver recovery (30%) for heap leach.
  • Recoveries are based on bench-scale testwork only.
  • Limited domain coverage for Sandiego in testwork.

Evidence · table

“30”

Context: Sandiego

Tags used in scoring

Heap Leach Routeneutral

Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.

Why it applies: processing_route matches the heap_leach signal

Low Recoverynegative

Recovery below the weak band for the commodity and processing route.

Why it applies: 30% is below the weak band (75%)

Byproduct Commodityneutral

The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: the release describes a byproduct credit

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.