Summary
The updated Scoping Study for the Halls Creek Project outlines a robust development strategy for copper, zinc, and silver production, yielding a pre-tax NPV10 of A$317 million and an IRR of 47%. The study incorporates silver recovery for the first time, establishing a third revenue stream, and proposes a capital-efficient common processing plant with an initial capital cost of A$75 million and a three-year payback. The project targets average annual production of 4,000 t copper, 13,000 t zinc, and 130,000 oz silver over an 11-year mine life, with a Preliminary Feasibility Study planned for H1 2028.
Reasoning: The updated Scoping Study presents robust economics for the Halls Creek Project, driven by the integration of silver recovery, a capital-efficient common processing plant, and strong commodity price assumptions, de-risking the project's development pathway. While preliminary, the results are highly positive, though silver recovery requires further optimization.
Positive factors
- Strong pre-tax NPV10 of A$317 million and IRR of 47%.
- Low initial capital of A$75 million with a quick 3-year payback.
- Silver recovery incorporated for the first time, adding a significant third revenue stream.
- Capital-efficient common processing plant for three saleable metals.
- District-scale growth potential with capacity for additional regional feedstock.
- Exceptional copper recovery (82.5%) and strong zinc recovery (85%) for Onedin.
Negative factors
- Study is at a preliminary Scoping Study level of accuracy (+/-35%).
- Metallurgical recoveries are based on bench-scale testwork only.
- Low silver recovery (30%) indicates a need for significant optimization.
- Limited domain coverage for Sandiego in metallurgical testwork.
Low confidence — this extraction should be reviewed alongside the original source.
Facts used in scoring: 28

Classification and evidence
JORC Compliantpositive · Story-specific tag
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: The underlying Mineral Resource Estimates for the production target were prepared in accordance with the 2012 JORC Code.
Evidence · text
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves 2012 edition (2012 JORC Code)”
QP/CP Signedpositive · Story-specific tag
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: The Mineral Resource Estimates underpinning the production target were prepared by a competent person in accordance with the JORC Code.
Evidence · text
“prepared by a competent person in accordance with the requirements of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves 2012 edition (2012 JORC Code)”
PEA-Supportingneutral · Story-specific tag
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: The document is a Scoping Study, which is a preliminary technical and economic study to assess project viability and justify further study phases.
Evidence · text
“The Scoping Study referenced in this announcement has been undertaken to assess the potential viability of the Halls Creek Project”
Heap Leach Routeneutral
Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.
Why it applies: The proposed processing method for copper, zinc, and silver recovery is a heap leach process.
Evidence · text
“Cobalt Blue has developed a single heap leach process that treats both oxide and sulphide mineralisation to recover copper, zinc and silver products.”
Bench Scale Onlynegative
Only preliminary bench tests completed — no locked-cycle or pilot work.
Why it applies: The metallurgical recoveries are based on bench scale testwork, indicating preliminary test maturity.
Evidence · text
“bench scale testwork completed by Cobalt Blue using historical drill core samples”
Multi-Domain Testedpositive
Variability across ore domains (oxide, transition, fresh) has been addressed.
Why it applies: Testwork included multiple composites covering oxide, transition, and fresh material for Onedin.
Evidence · text
“Seven composites assessed selected Onedin oxide and transition cases, a fresh-material diagnostic case”
Single Domain Onlynegative
Testing limited to one composite or domain — representativeness not established.
Why it applies: Sample availability constrained coverage for Sandiego, which was only represented in combined Onedin and Sandiego blends, limiting specific domain variability testing.
Evidence · text
“Sample availability constrained coverage, particularly at Sandiego, which was represented only in combined Onedin and Sandiego blends.”
High Recoverypositive
Recovery at or above the exceptional band for the commodity and processing route.
Why it applies: Copper recovery of 82.5% for Onedin via heap leach exceeds the exceptional threshold of 80% for this processing route.
Evidence · table
“82.5”
Context: Onedin
High Recoverypositive
Recovery at or above the exceptional band for the commodity and processing route.
Why it applies: Zinc recovery of 85% for Onedin/Sandiego meets the strong threshold for this commodity.
Evidence · table
“85”
Context: Onedin
High Recoverypositive
Recovery at or above the exceptional band for the commodity and processing route.
Why it applies: Zinc recovery of 85% for Onedin/Sandiego meets the strong threshold for this commodity.
Evidence · table
“85”
Context: Sandiego
Low Recoverynegative
Recovery below the weak band for the commodity and processing route.
Why it applies: Silver recovery of 30% for Onedin/Sandiego via heap leach is below the weak threshold of 45% for this processing route.
Evidence · table
“30”
Context: Onedin
Low Recoverynegative
Recovery below the weak band for the commodity and processing route.
Why it applies: Silver recovery of 30% for Onedin/Sandiego via heap leach is below the weak threshold of 45% for this processing route.
Evidence · table
“30”
Context: Sandiego
Mill Routeneutral
Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
Why it applies: the document describes a mill_cil route ("concentrator")
Extracted facts
Stored fact records: 27. Some facts used in scoring do not have a stored record.
Resource Estimates (24)
indicatedcopperTonnes: 1500000Grade: 1.1Grade Unit: %Contained Metal: 16.5Contained Unit: ktView all detailsHide details
Identity
- Commodity
- copper
- Ticker
- COB
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:83cd4946ad1cc5fda502
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 1500000
- Grade
- 1.1
- Grade Unit
- %
- Contained Metal
- 16.5
- Contained Unit
- kt
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: Expanded from multi-commodity resource table for completeness.
Negative factors
- Fact expanded from resource table columns (model omitted this commodity).
Evidence · table
“1.1”
Context: 1.5
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedzincTonnes: 1500000Grade: 9Grade Unit: ktView all detailsHide details
Identity
- Commodity
- zinc
- Ticker
- COB
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:83cd4946ad1cc5fda502
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 1500000
- Grade
- 9
- Grade Unit
- kt
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: Expanded from multi-commodity resource table for completeness.
Negative factors
- Fact expanded from resource table columns (model omitted this commodity).
Evidence · table
“9.0”
Context: 1.5
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedsilverTonnes: 1500000Grade: 2.27Grade Unit: mozView all detailsHide details
Identity
- Commodity
- silver
- Ticker
- COB
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:83cd4946ad1cc5fda502
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 1500000
- Grade
- 2.27
- Grade Unit
- moz
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: Expanded from multi-commodity resource table for completeness.
Negative factors
- Fact expanded from resource table columns (model omitted this commodity).
Evidence · table
“2.27”
Context: 1.5
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedcopperTonnes: 3300000Grade: 0.5Grade Unit: %Contained Metal: 16.5Contained Unit: ktView all detailsHide details
Identity
- Commodity
- copper
- Ticker
- COB
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:6be6b95d5a2110f02a19
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 3300000
- Grade
- 0.5
- Grade Unit
- %
- Contained Metal
- 16.5
- Contained Unit
- kt
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: Expanded from multi-commodity resource table for completeness.
Negative factors
- Fact expanded from resource table columns (model omitted this commodity).
Evidence · table
“0.5”
Context: 3.3
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedzincTonnes: 3300000Grade: 141.9Grade Unit: ktView all detailsHide details
Identity
- Commodity
- zinc
- Ticker
- COB
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:6be6b95d5a2110f02a19
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 3300000
- Grade
- 141.9
- Grade Unit
- kt
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: Expanded from multi-commodity resource table for completeness.
Negative factors
- Fact expanded from resource table columns (model omitted this commodity).
Evidence · table
“141.9”
Context: 3.3
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedsilverTonnes: 3300000Grade: 3.61Grade Unit: mozView all detailsHide details
Identity
- Commodity
- silver
- Ticker
- COB
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:6be6b95d5a2110f02a19
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 3300000
- Grade
- 3.61
- Grade Unit
- moz
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: Expanded from multi-commodity resource table for completeness.
Negative factors
- Fact expanded from resource table columns (model omitted this commodity).
Evidence · table
“3.61”
Context: 3.3
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedcopperTonnes: 1700000Grade: 2.3Grade Unit: %Contained Metal: 39.1Contained Unit: ktView all detailsHide details
Identity
- Commodity
- copper
- Ticker
- COB
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:e9b2086022303cd7bbfb
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 1700000
- Grade
- 2.3
- Grade Unit
- %
- Contained Metal
- 39.1
- Contained Unit
- kt
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: Expanded from multi-commodity resource table for completeness.
Negative factors
- Fact expanded from resource table columns (model omitted this commodity).
Evidence · table
“2.3”
Context: 1.7
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedzincTonnes: 1700000Grade: 13.6Grade Unit: ktView all detailsHide details
Identity
- Commodity
- zinc
- Ticker
- COB
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:e9b2086022303cd7bbfb
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 1700000
- Grade
- 13.6
- Grade Unit
- kt
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: Expanded from multi-commodity resource table for completeness.
Negative factors
- Fact expanded from resource table columns (model omitted this commodity).
Evidence · table
“13.6”
Context: 1.7
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedsilverTonnes: 1700000Grade: 0.98Grade Unit: mozView all detailsHide details
Identity
- Commodity
- silver
- Ticker
- COB
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:e9b2086022303cd7bbfb
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 1700000
- Grade
- 0.98
- Grade Unit
- moz
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: Expanded from multi-commodity resource table for completeness.
Negative factors
- Fact expanded from resource table columns (model omitted this commodity).
Evidence · table
“0.98”
Context: 1.7
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredcopperTonnes: 300000Grade: 1.6Grade Unit: %Contained Metal: 4.8Contained Unit: ktView all detailsHide details
Identity
- Commodity
- copper
- Ticker
- COB
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:831e896cd94b4b87403b
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 300000
- Grade
- 1.6
- Grade Unit
- %
- Contained Metal
- 4.8
- Contained Unit
- kt
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: Expanded from multi-commodity resource table for completeness.
Negative factors
- Fact expanded from resource table columns (model omitted this commodity).
Evidence · table
“1.6”
Context: 0.3
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredzincTonnes: 300000Grade: 9Grade Unit: ktView all detailsHide details
Identity
- Commodity
- zinc
- Ticker
- COB
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:831e896cd94b4b87403b
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 300000
- Grade
- 9
- Grade Unit
- kt
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: Expanded from multi-commodity resource table for completeness.
Negative factors
- Fact expanded from resource table columns (model omitted this commodity).
Evidence · table
“9.0”
Context: 0.3
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredsilverTonnes: 300000Grade: 0.05Grade Unit: mozView all detailsHide details
Identity
- Commodity
- silver
- Ticker
- COB
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:831e896cd94b4b87403b
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 300000
- Grade
- 0.05
- Grade Unit
- moz
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: Expanded from multi-commodity resource table for completeness.
Negative factors
- Fact expanded from resource table columns (model omitted this commodity).
Evidence · table
“0.05”
Context: 0.3
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredcopperTonnes: 2000000Grade: 2.2Grade Unit: %Contained Metal: 43.9Contained Unit: ktView all detailsHide details
Identity
- Commodity
- copper
- Ticker
- COB
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:4849faabc3a13f963672
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 2000000
- Grade
- 2.2
- Grade Unit
- %
- Contained Metal
- 43.9
- Contained Unit
- kt
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: Expanded from multi-commodity resource table for completeness.
Negative factors
- Fact expanded from resource table columns (model omitted this commodity).
Evidence · table
“2.2”
Context: 2.0
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredzincTonnes: 2000000Grade: 22.6Grade Unit: ktView all detailsHide details
Identity
- Commodity
- zinc
- Ticker
- COB
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:4849faabc3a13f963672
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 2000000
- Grade
- 22.6
- Grade Unit
- kt
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: Expanded from multi-commodity resource table for completeness.
Negative factors
- Fact expanded from resource table columns (model omitted this commodity).
Evidence · table
“22.6”
Context: 2.0
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredsilverTonnes: 2000000Grade: 1.03Grade Unit: mozView all detailsHide details
Identity
- Commodity
- silver
- Ticker
- COB
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:4849faabc3a13f963672
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 2000000
- Grade
- 1.03
- Grade Unit
- moz
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: Expanded from multi-commodity resource table for completeness.
Negative factors
- Fact expanded from resource table columns (model omitted this commodity).
Evidence · table
“1.03”
Context: 2.0
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedcopperTonnes: 2000000Grade: 0.6Grade Unit: %Contained Metal: 12Contained Unit: ktView all detailsHide details
Identity
- Commodity
- copper
- Ticker
- COB
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:916c5fbc7cbee11917ba
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 2000000
- Grade
- 0.6
- Grade Unit
- %
- Contained Metal
- 12
- Contained Unit
- kt
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: Expanded from multi-commodity resource table for completeness.
Negative factors
- Fact expanded from resource table columns (model omitted this commodity).
Evidence · table
“0.6”
Context: 2.0
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedzincTonnes: 2000000Grade: 146Grade Unit: ktView all detailsHide details
Identity
- Commodity
- zinc
- Ticker
- COB
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:916c5fbc7cbee11917ba
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 2000000
- Grade
- 146
- Grade Unit
- kt
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: Expanded from multi-commodity resource table for completeness.
Negative factors
- Fact expanded from resource table columns (model omitted this commodity).
Evidence · table
“146.0”
Context: 2.0
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedsilverTonnes: 2000000Grade: 2.25Grade Unit: mozView all detailsHide details
Identity
- Commodity
- silver
- Ticker
- COB
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:916c5fbc7cbee11917ba
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 2000000
- Grade
- 2.25
- Grade Unit
- moz
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: Expanded from multi-commodity resource table for completeness.
Negative factors
- Fact expanded from resource table columns (model omitted this commodity).
Evidence · table
“2.25”
Context: 2.0
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredcopperTonnes: 100000Grade: 0.2Grade Unit: %Contained Metal: 0.2Contained Unit: ktView all detailsHide details
Identity
- Commodity
- copper
- Ticker
- COB
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:b8e58556bcd50cfad7c0
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 100000
- Grade
- 0.2
- Grade Unit
- %
- Contained Metal
- 0.2
- Contained Unit
- kt
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: Expanded from multi-commodity resource table for completeness.
Negative factors
- Fact expanded from resource table columns (model omitted this commodity).
Evidence · table
“0.2”
Context: 0.1
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredzincTonnes: 100000Grade: 6.1Grade Unit: ktView all detailsHide details
Identity
- Commodity
- zinc
- Ticker
- COB
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:b8e58556bcd50cfad7c0
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 100000
- Grade
- 6.1
- Grade Unit
- kt
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: Expanded from multi-commodity resource table for completeness.
Negative factors
- Fact expanded from resource table columns (model omitted this commodity).
Evidence · table
“6.1”
Context: 0.1
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredsilverTonnes: 100000Grade: 0.03Grade Unit: mozView all detailsHide details
Identity
- Commodity
- silver
- Ticker
- COB
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:b8e58556bcd50cfad7c0
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 100000
- Grade
- 0.03
- Grade Unit
- moz
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: Expanded from multi-commodity resource table for completeness.
Negative factors
- Fact expanded from resource table columns (model omitted this commodity).
Evidence · table
“0.03”
Context: 0.1
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredcopperTonnes: 2100000Grade: 0.6Grade Unit: %Contained Metal: 12.2Contained Unit: ktView all detailsHide details
Identity
- Commodity
- copper
- Ticker
- COB
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:fdd577acb38773967ce1
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 2100000
- Grade
- 0.6
- Grade Unit
- %
- Contained Metal
- 12.2
- Contained Unit
- kt
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: Expanded from multi-commodity resource table for completeness.
Negative factors
- Fact expanded from resource table columns (model omitted this commodity).
Evidence · table
“0.6”
Context: 2.1
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredzincTonnes: 2100000Grade: 152.1Grade Unit: ktView all detailsHide details
Identity
- Commodity
- zinc
- Ticker
- COB
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:fdd577acb38773967ce1
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 2100000
- Grade
- 152.1
- Grade Unit
- kt
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: Expanded from multi-commodity resource table for completeness.
Negative factors
- Fact expanded from resource table columns (model omitted this commodity).
Evidence · table
“152.1”
Context: 2.1
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredsilverTonnes: 2100000Grade: 2.28Grade Unit: mozView all detailsHide details
Identity
- Commodity
- silver
- Ticker
- COB
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- Resource group id
- resource:fdd577acb38773967ce1
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 2100000
- Grade
- 2.28
- Grade Unit
- moz
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: Expanded from multi-commodity resource table for completeness.
Negative factors
- Fact expanded from resource table columns (model omitted this commodity).
Evidence · table
“2.28”
Context: 2.1
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Metallurgical Results (3)
column leachHalls Creek Project · copperRecovery: 65 %View all detailsHide details
Identity
- Project
- Halls Creek Project
- Commodity
- copper
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- COB
Test Work
- Program Status
- preliminary
- Test Type
- column leach
- Processing Route
- saline acid leach under oxidising conditions
- Sample
- selected Onedin oxide and transition cases, a fresh-material diagnostic case and two Onedin–Sandiego blends
Recovery
- Recovery
- 65 %
Lab
- Laboratory
- Bureau Veritas and Cobalt Blue's Broken Hill Technology Centre (BHTC)
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: The moderate copper recovery of 65% from Sandiego is acceptable for a heap leach operation, but further work is needed to confirm variability given the limited domain coverage.
Positive factors
- Moderate copper recovery (65%) is acceptable for heap leach.
Negative factors
- Recoveries are based on bench-scale testwork only.
- Limited domain coverage for Sandiego in testwork.
Evidence · table
“65”
Context: Sandiego
Tags used in scoring
Heap Leach Routeneutral
Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.
Why it applies: processing_route matches the heap_leach signal
Byproduct Commodityneutral
The tested commodity is a byproduct rather than the primary economic driver.
Why it applies: the release describes a byproduct credit
column leachHalls Creek Project · zincRecovery: 85 %View all detailsHide details
Identity
- Project
- Halls Creek Project
- Commodity
- zinc
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- COB
Test Work
- Program Status
- preliminary
- Test Type
- column leach
- Processing Route
- saline acid leach under oxidising conditions
- Sample
- selected Onedin oxide and transition cases, a fresh-material diagnostic case and two Onedin–Sandiego blends
Recovery
- Recovery
- 85 %
Lab
- Laboratory
- Bureau Veritas and Cobalt Blue's Broken Hill Technology Centre (BHTC)
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: The strong zinc recovery of 85% from Sandiego is positive for the project, but further work is needed to confirm variability given the limited domain coverage.
Positive factors
- Strong zinc recovery (85%) for heap leach.
Negative factors
- Recoveries are based on bench-scale testwork only.
- Limited domain coverage for Sandiego in testwork.
Evidence · table
“85”
Context: Sandiego
Tags used in scoring
Heap Leach Routeneutral
Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.
Why it applies: processing_route matches the heap_leach signal
Byproduct Commodityneutral
The tested commodity is a byproduct rather than the primary economic driver.
Why it applies: the release describes a byproduct credit
column leachHalls Creek Project · silverRecovery: 30 %View all detailsHide details
Identity
- Project
- Halls Creek Project
- Commodity
- silver
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- COB
Test Work
- Program Status
- preliminary
- Test Type
- column leach
- Processing Route
- saline acid leach under oxidising conditions
- Sample
- selected Onedin oxide and transition cases, a fresh-material diagnostic case and two Onedin–Sandiego blends
Recovery
- Recovery
- 30 %
Lab
- Laboratory
- Bureau Veritas and Cobalt Blue's Broken Hill Technology Centre (BHTC)
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: The low silver recovery of 30% from Sandiego indicates a need for significant metallurgical optimization, especially given the limited domain coverage in the testwork.
Positive factors
- Silver recovery incorporated for the first time, adding a new revenue stream.
Negative factors
- Low silver recovery (30%) for heap leach.
- Recoveries are based on bench-scale testwork only.
- Limited domain coverage for Sandiego in testwork.
Evidence · table
“30”
Context: Sandiego
Tags used in scoring
Heap Leach Routeneutral
Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.
Why it applies: processing_route matches the heap_leach signal
Low Recoverynegative
Recovery below the weak band for the commodity and processing route.
Why it applies: 30% is below the weak band (75%)
Byproduct Commodityneutral
The tested commodity is a byproduct rather than the primary economic driver.
Why it applies: the release describes a byproduct credit
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.