# BTR: Drilling to Commence at Priority Sandstone TMH-style Targets

Canonical Atlas analysis: https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1

Original source: https://www.asx.com.au/asx/v2/statistics/displayAnnouncement.do?display=pdf&idsId=03161863

Publisher: asx

Original announcement: 2026-11-03T22:40:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-11-03T23:30:45.323Z

Atlas analysis updated: 2026-11-03T23:30:45.323Z

- Company: Brightstar Resources Limited

- Ticker: BTR

- Exchange: ASX

- Region: Western Australia

- Primary commodity: Unavailable

- Secondary commodities: None reported

- Document categories: Other, Resource update, Drill results

- Extracted: 2026-11-03 23:15:48 UTC

Narrative sentiment: 0.20 · Bullish

## Minestarters Atlas summary

Brightstar Resources has identified 11 new priority gold targets at its Sandstone Gold Project, analogous to the Two Mile Hill and Bull Oak deposits. An RC drilling program is scheduled to commence in November 2026 to test the highest priority, drill-ready targets, with a broader corridor-wide program planned for 2027. The company also presented its consolidated JORC Mineral Resources, which have grown to 3.6Moz at Sandstone and 5.2Moz group-wide, and detailed historical drill results from the project.

Reasoning: The company has identified 11 new priority targets analogous to existing deposits and plans to commence RC drilling in November 2026, indicating future exploration activity. The document also provides an updated consolidated JORC Mineral Resource Estimate and historical drill results.

- Positive factor: New targets identified

- Positive factor: Drilling program planned

- Negative factor: No immediate drill results

Facts used in scoring: 53

## Classification and evidence

No classification tags are available.

## Extracted facts

Stored fact records: 52. Some facts used in scoring do not have a stored record.

## Resource Estimates (52)

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-1)

Laverton Gold Project · gold

#### Identity

- Project: Laverton Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:2898eb68ea3a44db87ad
- Deposit or zone: Alpha

#### Resource Data

- Category: indicated
- Tonnes: 371000
- Grade: 1.9
- Grade Unit: g/t
- Contained Metal: 22
- Contained Unit: koz
- Cutoff Grade: 0.5
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant indicated resource estimate for the Alpha deposit, with 371 kt at 1.9 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

Evidence · table

> 1.9

Context: 371

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-2)

Laverton Gold Project · gold

#### Identity

- Project: Laverton Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:b45d058350eda8b794b9
- Deposit or zone: Alpha

#### Resource Data

- Category: inferred
- Tonnes: 1028000
- Grade: 2.8
- Grade Unit: g/t
- Contained Metal: 92
- Contained Unit: koz
- Cutoff Grade: 0.5
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant inferred resource estimate for the Alpha deposit, with 1,028 kt at 2.8 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Negative factor: Inferred Resource

Evidence · table

> 2.8

Context: 1,028

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### measured

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-3)

Laverton Gold Project · gold

#### Identity

- Project: Laverton Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:a2ecde40194f83304bfb
- Deposit or zone: Beta

#### Resource Data

- Category: measured
- Tonnes: 345000
- Grade: 1.7
- Grade Unit: g/t
- Contained Metal: 19
- Contained Unit: koz
- Cutoff Grade: 0.5
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant measured resource estimate for the Beta deposit, with 345 kt at 1.7 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Positive factor: Measured Resource

Evidence · table

> 1.7

Context: 345

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-4)

Laverton Gold Project · gold

#### Identity

- Project: Laverton Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:97360ca9a8fc88bbbae9
- Deposit or zone: Beta

#### Resource Data

- Category: indicated
- Tonnes: 576000
- Grade: 1.6
- Grade Unit: g/t
- Contained Metal: 29
- Contained Unit: koz
- Cutoff Grade: 0.5
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant indicated resource estimate for the Beta deposit, with 576 kt at 1.6 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

Evidence · table

> 1.6

Context: 576

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-5)

Laverton Gold Project · gold

#### Identity

- Project: Laverton Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:fbe517035c647f62da71
- Deposit or zone: Beta

#### Resource Data

- Category: inferred
- Tonnes: 961000
- Grade: 1.7
- Grade Unit: g/t
- Contained Metal: 54
- Contained Unit: koz
- Cutoff Grade: 0.5
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant inferred resource estimate for the Beta deposit, with 961 kt at 1.7 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Negative factor: Inferred Resource

Evidence · table

> 1.7

Context: 961

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-6)

Laverton Gold Project · gold

#### Identity

- Project: Laverton Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:8bce3f4f66c2ad9802d1
- Deposit or zone: Cork Tree Well

#### Resource Data

- Category: indicated
- Tonnes: 3264000
- Grade: 1.6
- Grade Unit: g/t
- Contained Metal: 166
- Contained Unit: koz
- Cutoff Grade: 0.5
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant indicated resource estimate for the Cork Tree Well deposit, with 3,264 kt at 1.6 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

Evidence · table

> 1.6

Context: 3,264

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-7)

Laverton Gold Project · gold

#### Identity

- Project: Laverton Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:e044a95fa6db4029678e
- Deposit or zone: Cork Tree Well

#### Resource Data

- Category: inferred
- Tonnes: 3198000
- Grade: 1.2
- Grade Unit: g/t
- Contained Metal: 126
- Contained Unit: koz
- Cutoff Grade: 0.5
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant inferred resource estimate for the Cork Tree Well deposit, with 3,198 kt at 1.2 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Negative factor: Inferred Resource

Evidence · table

> 1.2

Context: 3,198

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### measured

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-8)

Laverton Gold Project · gold

#### Identity

- Project: Laverton Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:64b0f38b51b6374ca7a5
- Deposit or zone: Lord Byron

#### Resource Data

- Category: measured
- Tonnes: 311000
- Grade: 1.7
- Grade Unit: g/t
- Contained Metal: 17
- Contained Unit: koz
- Cutoff Grade: 0.5
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant measured resource estimate for the Lord Byron deposit, with 311 kt at 1.7 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Positive factor: Measured Resource

Evidence · table

> 1.7

Context: 311

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-9)

Laverton Gold Project · gold

#### Identity

- Project: Laverton Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:0899807f59741fbcc021
- Deposit or zone: Lord Byron

#### Resource Data

- Category: indicated
- Tonnes: 2104000
- Grade: 1.5
- Grade Unit: g/t
- Contained Metal: 105
- Contained Unit: koz
- Cutoff Grade: 0.5
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant indicated resource estimate for the Lord Byron deposit, with 2,104 kt at 1.5 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

Evidence · table

> 1.5

Context: 2,104

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-10)

Laverton Gold Project · gold

#### Identity

- Project: Laverton Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:32c09bb6a65cce02cf23
- Deposit or zone: Lord Byron

#### Resource Data

- Category: inferred
- Tonnes: 2974000
- Grade: 1.5
- Grade Unit: g/t
- Contained Metal: 145
- Contained Unit: koz
- Cutoff Grade: 0.5
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant inferred resource estimate for the Lord Byron deposit, with 2,974 kt at 1.5 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Negative factor: Inferred Resource

Evidence · table

> 1.5

Context: 2,974

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### measured

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-11)

Laverton Gold Project · gold

#### Identity

- Project: Laverton Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:4bb10ffd5bcc11e8f1c2
- Deposit or zone: Fish

#### Resource Data

- Category: measured
- Tonnes: 25000
- Grade: 5.4
- Grade Unit: g/t
- Contained Metal: 4
- Contained Unit: koz
- Cutoff Grade: 1.6
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant measured resource estimate for the Fish deposit, with 25 kt at 5.4 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Positive factor: Measured Resource

Evidence · table

> 5.4

Context: 25

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-12)

Laverton Gold Project · gold

#### Identity

- Project: Laverton Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:1a14e72c60485f2fb503
- Deposit or zone: Fish

#### Resource Data

- Category: indicated
- Tonnes: 199000
- Grade: 4.5
- Grade Unit: g/t
- Contained Metal: 29
- Contained Unit: koz
- Cutoff Grade: 1.6
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant indicated resource estimate for the Fish deposit, with 199 kt at 4.5 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

Evidence · table

> 4.5

Context: 199

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-13)

Laverton Gold Project · gold

#### Identity

- Project: Laverton Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:353966581f88e6fa2a5b
- Deposit or zone: Fish

#### Resource Data

- Category: inferred
- Tonnes: 153000
- Grade: 3.2
- Grade Unit: g/t
- Contained Metal: 16
- Contained Unit: koz
- Cutoff Grade: 1.6
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant inferred resource estimate for the Fish deposit, with 153 kt at 3.2 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Negative factor: Inferred Resource

Evidence · table

> 3.2

Context: 153

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-14)

Laverton Gold Project · gold

#### Identity

- Project: Laverton Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:a7d1956a0e02ecdda86f
- Deposit or zone: Gilt Key

#### Resource Data

- Category: indicated
- Tonnes: 15000
- Grade: 2.2
- Grade Unit: g/t
- Contained Metal: 1
- Contained Unit: koz
- Cutoff Grade: 0.5
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant indicated resource estimate for the Gilt Key deposit, with 15 kt at 2.2 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

Evidence · table

> 2.2

Context: 15

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-15)

Laverton Gold Project · gold

#### Identity

- Project: Laverton Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:647f876b65c1b817f173
- Deposit or zone: Gilt Key

#### Resource Data

- Category: inferred
- Tonnes: 153000
- Grade: 1.3
- Grade Unit: g/t
- Contained Metal: 6
- Contained Unit: koz
- Cutoff Grade: 0.5
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant inferred resource estimate for the Gilt Key deposit, with 153 kt at 1.3 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Negative factor: Inferred Resource

Evidence · table

> 1.3

Context: 153

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### measured

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-16)

Laverton Gold Project · gold

#### Identity

- Project: Laverton Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:065877e49140ee9b01e6
- Deposit or zone: Second Fortune \(UG\)

#### Resource Data

- Category: measured
- Tonnes: 24000
- Grade: 15.3
- Grade Unit: g/t
- Contained Metal: 12
- Contained Unit: koz
- Cutoff Grade: 2.5
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant measured resource estimate for the Second Fortune \(UG\) deposit, with 24 kt at 15.3 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Positive factor: Measured Resource

Evidence · table

> 15.3

Context: 24

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-17)

Laverton Gold Project · gold

#### Identity

- Project: Laverton Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:7fac4af2370c4bb84dd8
- Deposit or zone: Second Fortune \(UG\)

#### Resource Data

- Category: indicated
- Tonnes: 34000
- Grade: 13.7
- Grade Unit: g/t
- Contained Metal: 15
- Contained Unit: koz
- Cutoff Grade: 2.5
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant indicated resource estimate for the Second Fortune \(UG\) deposit, with 34 kt at 13.7 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

Evidence · table

> 13.7

Context: 34

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-18)

Laverton Gold Project · gold

#### Identity

- Project: Laverton Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:1f3f9d443f8d5445248c
- Deposit or zone: Second Fortune \(UG\)

#### Resource Data

- Category: inferred
- Tonnes: 34000
- Grade: 11.7
- Grade Unit: g/t
- Contained Metal: 13
- Contained Unit: koz
- Cutoff Grade: 2.5
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant inferred resource estimate for the Second Fortune \(UG\) deposit, with 34 kt at 11.7 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Negative factor: Inferred Resource

Evidence · table

> 11.7

Context: 34

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-19)

Menzies Gold Project · gold

#### Identity

- Project: Menzies Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:6fce92f74f564950d578
- Deposit or zone: Lady Shenton System

#### Resource Data

- Category: indicated
- Tonnes: 3725000
- Grade: 1.4
- Grade Unit: g/t
- Contained Metal: 168
- Contained Unit: koz
- Cutoff Grade: 0.5
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant indicated resource estimate for the Lady Shenton System deposit, with 3,725 kt at 1.4 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

Evidence · table

> 1.4

Context: 3,725

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-20)

Menzies Gold Project · gold

#### Identity

- Project: Menzies Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:a9e9e49227fdf19e3224
- Deposit or zone: Lady Shenton System

#### Resource Data

- Category: inferred
- Tonnes: 4349000
- Grade: 1.3
- Grade Unit: g/t
- Contained Metal: 184
- Contained Unit: koz
- Cutoff Grade: 0.5
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant inferred resource estimate for the Lady Shenton System deposit, with 4,349 kt at 1.3 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Negative factor: Inferred Resource

Evidence · table

> 1.3

Context: 4,349

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-21)

Menzies Gold Project · gold

#### Identity

- Project: Menzies Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:4e3427d638cad221babf
- Deposit or zone: Yunndaga

#### Resource Data

- Category: indicated
- Tonnes: 2172000
- Grade: 2.2
- Grade Unit: g/t
- Contained Metal: 152
- Contained Unit: koz
- Cutoff Grade: 0.5
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant indicated resource estimate for the Yunndaga deposit, with 2,172 kt at 2.2 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

Evidence · table

> 2.2

Context: 2,172

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-22)

Menzies Gold Project · gold

#### Identity

- Project: Menzies Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:52436f9db23b84c6f68e
- Deposit or zone: Yunndaga

#### Resource Data

- Category: inferred
- Tonnes: 923000
- Grade: 1.8
- Grade Unit: g/t
- Contained Metal: 54
- Contained Unit: koz
- Cutoff Grade: 0.5
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant inferred resource estimate for the Yunndaga deposit, with 923 kt at 1.8 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Negative factor: Inferred Resource

Evidence · table

> 1.8

Context: 923

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-23)

Menzies Gold Project · gold

#### Identity

- Project: Menzies Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:2b933a1618fef2505dfb
- Deposit or zone: Aspacia

#### Resource Data

- Category: indicated
- Tonnes: 137000
- Grade: 1.7
- Grade Unit: g/t
- Contained Metal: 7
- Contained Unit: koz
- Cutoff Grade: 0.5
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant indicated resource estimate for the Aspacia deposit, with 137 kt at 1.7 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

Evidence · table

> 1.7

Context: 137

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-24)

Menzies Gold Project · gold

#### Identity

- Project: Menzies Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:febb1f7f203e4194ea82
- Deposit or zone: Aspacia

#### Resource Data

- Category: inferred
- Tonnes: 1238000
- Grade: 1.6
- Grade Unit: g/t
- Contained Metal: 62
- Contained Unit: koz
- Cutoff Grade: 0.5
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant inferred resource estimate for the Aspacia deposit, with 1,238 kt at 1.6 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Negative factor: Inferred Resource

Evidence · table

> 1.6

Context: 1,238

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-25)

Menzies Gold Project · gold

#### Identity

- Project: Menzies Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:32c74937b420240990ff
- Deposit or zone: Lady Harriet System

#### Resource Data

- Category: indicated
- Tonnes: 520000
- Grade: 1.3
- Grade Unit: g/t
- Contained Metal: 22
- Contained Unit: koz
- Cutoff Grade: 0.5
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant indicated resource estimate for the Lady Harriet System deposit, with 520 kt at 1.3 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

Evidence · table

> 1.3

Context: 520

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-26)

Menzies Gold Project · gold

#### Identity

- Project: Menzies Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:8797c5ddfe9cb1f7dd94
- Deposit or zone: Lady Harriet System

#### Resource Data

- Category: inferred
- Tonnes: 590000
- Grade: 1.1
- Grade Unit: g/t
- Contained Metal: 21
- Contained Unit: koz
- Cutoff Grade: 0.5
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant inferred resource estimate for the Lady Harriet System deposit, with 590 kt at 1.1 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Negative factor: Inferred Resource

Evidence · table

> 1.1

Context: 590

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-27)

Menzies Gold Project · gold

#### Identity

- Project: Menzies Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:d9eaa684a47cf10ac103
- Deposit or zone: Link Zone

#### Resource Data

- Category: indicated
- Tonnes: 160000
- Grade: 1.3
- Grade Unit: g/t
- Contained Metal: 7
- Contained Unit: koz
- Cutoff Grade: 0.5
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant indicated resource estimate for the Link Zone deposit, with 160 kt at 1.3 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

Evidence · table

> 1.3

Context: 160

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-28)

Menzies Gold Project · gold

#### Identity

- Project: Menzies Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:61799d062f26fd727462
- Deposit or zone: Link Zone

#### Resource Data

- Category: inferred
- Tonnes: 740000
- Grade: 1
- Grade Unit: g/t
- Contained Metal: 23
- Contained Unit: koz
- Cutoff Grade: 0.5
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant inferred resource estimate for the Link Zone deposit, with 740 kt at 1.0 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Negative factor: Inferred Resource

Evidence · table

> 1.0

Context: 740

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-29)

Menzies Gold Project · gold

#### Identity

- Project: Menzies Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:be6a88cedb0d33e01afa
- Deposit or zone: Selkirk

#### Resource Data

- Category: indicated
- Tonnes: 30000
- Grade: 6.3
- Grade Unit: g/t
- Contained Metal: 6
- Contained Unit: koz
- Cutoff Grade: 0.5
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant indicated resource estimate for the Selkirk deposit, with 30 kt at 6.3 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

Evidence · table

> 6.3

Context: 30

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-30)

Menzies Gold Project · gold

#### Identity

- Project: Menzies Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:20e25f8bff3c113b8931
- Deposit or zone: Selkirk

#### Resource Data

- Category: inferred
- Tonnes: 140000
- Grade: 1.2
- Grade Unit: g/t
- Contained Metal: 5
- Contained Unit: koz
- Cutoff Grade: 0.5
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant inferred resource estimate for the Selkirk deposit, with 140 kt at 1.2 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Negative factor: Inferred Resource

Evidence · table

> 1.2

Context: 140

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-31)

Menzies Gold Project · gold

#### Identity

- Project: Menzies Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:a601930c268780c79606
- Deposit or zone: Lady Irene

#### Resource Data

- Category: inferred
- Tonnes: 100000
- Grade: 1.7
- Grade Unit: g/t
- Contained Metal: 6
- Contained Unit: koz
- Cutoff Grade: 0.5
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant inferred resource estimate for the Lady Irene deposit, with 100 kt at 1.7 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Negative factor: Inferred Resource

Evidence · table

> 1.7

Context: 100

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-32)

Sandstone Gold Project · gold

#### Identity

- Project: Sandstone Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:3b3befd2550ab020c8b5
- Deposit or zone: Montague-Evermore

#### Resource Data

- Category: indicated
- Tonnes: 1683000
- Grade: 2.1
- Grade Unit: g/t
- Contained Metal: 114
- Contained Unit: koz
- Cutoff Grade: 0.4
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant indicated resource estimate for the Montague-Evermore deposit, with 1,683 kt at 2.1 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

Evidence · table

> 2.1

Context: 1,683

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-33)

Sandstone Gold Project · gold

#### Identity

- Project: Sandstone Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:6409ebf78b1c101b1e43
- Deposit or zone: Montague-Evermore

#### Resource Data

- Category: inferred
- Tonnes: 3122000
- Grade: 1.3
- Grade Unit: g/t
- Contained Metal: 127
- Contained Unit: koz
- Cutoff Grade: 0.4
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant inferred resource estimate for the Montague-Evermore deposit, with 3,122 kt at 1.3 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Negative factor: Inferred Resource

Evidence · table

> 1.3

Context: 3,122

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-34)

Sandstone Gold Project · gold

#### Identity

- Project: Sandstone Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:ea57cf6a034ffd8d9f7b
- Deposit or zone: Whistler

#### Resource Data

- Category: indicated
- Tonnes: 1258000
- Grade: 2
- Grade Unit: g/t
- Contained Metal: 79
- Contained Unit: koz
- Cutoff Grade: 0.4
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant indicated resource estimate for the Whistler deposit, with 1,258 kt at 2.0 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

Evidence · table

> 2.0

Context: 1,258

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-35)

Sandstone Gold Project · gold

#### Identity

- Project: Sandstone Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:b8240860414ba143575d
- Deposit or zone: Whistler

#### Resource Data

- Category: inferred
- Tonnes: 565000
- Grade: 1.4
- Grade Unit: g/t
- Contained Metal: 25
- Contained Unit: koz
- Cutoff Grade: 0.4
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant inferred resource estimate for the Whistler deposit, with 565 kt at 1.4 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Negative factor: Inferred Resource

Evidence · table

> 1.4

Context: 565

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-36)

Sandstone Gold Project · gold

#### Identity

- Project: Sandstone Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:24d2334dffe5162f3729
- Deposit or zone: Achilles / Airport

#### Resource Data

- Category: indicated
- Tonnes: 2130000
- Grade: 1.3
- Grade Unit: g/t
- Contained Metal: 90
- Contained Unit: koz
- Cutoff Grade: 0.4
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant indicated resource estimate for the Achilles / Airport deposit, with 2,130 kt at 1.3 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

Evidence · table

> 1.3

Context: 2,130

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-37)

Sandstone Gold Project · gold

#### Identity

- Project: Sandstone Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:45b2e82cec62a34cd125
- Deposit or zone: Achilles / Airport

#### Resource Data

- Category: inferred
- Tonnes: 4255000
- Grade: 1
- Grade Unit: g/t
- Contained Metal: 134
- Contained Unit: koz
- Cutoff Grade: 0.4
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant inferred resource estimate for the Achilles / Airport deposit, with 4,255 kt at 1.0 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Negative factor: Inferred Resource

Evidence · table

> 1.0

Context: 4,255

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-38)

Sandstone Gold Project · gold

#### Identity

- Project: Sandstone Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:1302bc2e49b3a6c105db
- Deposit or zone: Duplex

#### Resource Data

- Category: inferred
- Tonnes: 1003000
- Grade: 0.9
- Grade Unit: g/t
- Contained Metal: 30
- Contained Unit: koz
- Cutoff Grade: 0.4
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant inferred resource estimate for the Duplex deposit, with 1,003 kt at 0.9 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Negative factor: Inferred Resource

Evidence · table

> 0.9

Context: 1,003

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-39)

Sandstone Gold Project · gold

#### Identity

- Project: Sandstone Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:83a8c8225b8d9062bd95
- Deposit or zone: Julias
- Ownership percent: 75 %
- Resource basis: attributable

#### Resource Data

- Category: indicated
- Tonnes: 1258000
- Grade: 1.2
- Grade Unit: g/t
- Contained Metal: 49
- Contained Unit: koz
- Cutoff Grade: 0.4
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant indicated resource estimate for the Julias deposit, with 1,258 kt at 1.2 g/t gold, attributable to Brightstar.

- Positive factor: JORC compliant

- Positive factor: QP signed

Evidence · table

> 1.2

Context: 1,258

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-40)

Sandstone Gold Project · gold

#### Identity

- Project: Sandstone Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:081c021da92b309454d7
- Deposit or zone: Julias
- Ownership percent: 75 %
- Resource basis: attributable

#### Resource Data

- Category: inferred
- Tonnes: 556000
- Grade: 0.8
- Grade Unit: g/t
- Contained Metal: 15
- Contained Unit: koz
- Cutoff Grade: 0.4
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant inferred resource estimate for the Julias deposit, with 556 kt at 0.8 g/t gold, attributable to Brightstar.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Negative factor: Inferred Resource

Evidence · table

> 0.8

Context: 556

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-41)

Sandstone Gold Project · gold

#### Identity

- Project: Sandstone Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:417d98953a532f8d0ec2
- Deposit or zone: Lord Nelson

#### Resource Data

- Category: indicated
- Tonnes: 4441000
- Grade: 1.5
- Grade Unit: g/t
- Contained Metal: 215
- Contained Unit: koz
- Cutoff Grade: 0.4
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant indicated resource estimate for the Lord Nelson deposit, with 4,441 kt at 1.5 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

Evidence · table

> 1.5

Context: 4,441

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-42)

Sandstone Gold Project · gold

#### Identity

- Project: Sandstone Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:076b976160a115be61e6
- Deposit or zone: Lord Nelson

#### Resource Data

- Category: inferred
- Tonnes: 1758000
- Grade: 1.1
- Grade Unit: g/t
- Contained Metal: 64
- Contained Unit: koz
- Cutoff Grade: 0.4
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant inferred resource estimate for the Lord Nelson deposit, with 1,758 kt at 1.1 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Negative factor: Inferred Resource

Evidence · table

> 1.1

Context: 1,758

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-43)

Sandstone Gold Project · gold

#### Identity

- Project: Sandstone Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:4d0e500042fddaa0fdca
- Deposit or zone: Lord Henry

#### Resource Data

- Category: indicated
- Tonnes: 1523000
- Grade: 1.6
- Grade Unit: g/t
- Contained Metal: 76
- Contained Unit: koz
- Cutoff Grade: 0.4
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant indicated resource estimate for the Lord Henry deposit, with 1,523 kt at 1.6 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

Evidence · table

> 1.6

Context: 1,523

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-44)

Sandstone Gold Project · gold

#### Identity

- Project: Sandstone Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:e8c4b9081770474f8e2f
- Deposit or zone: Lord Henry

#### Resource Data

- Category: inferred
- Tonnes: 883000
- Grade: 1.4
- Grade Unit: g/t
- Contained Metal: 40
- Contained Unit: koz
- Cutoff Grade: 0.4
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant inferred resource estimate for the Lord Henry deposit, with 883 kt at 1.4 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Negative factor: Inferred Resource

Evidence · table

> 1.4

Context: 883

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-45)

Sandstone Gold Project · gold

#### Identity

- Project: Sandstone Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:be4cf3d260b16205c47b
- Deposit or zone: Vanguard Camp

#### Resource Data

- Category: indicated
- Tonnes: 1616000
- Grade: 2.2
- Grade Unit: g/t
- Contained Metal: 115
- Contained Unit: koz
- Cutoff Grade: 0.4
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant indicated resource estimate for the Vanguard Camp deposit, with 1,616 kt at 2.2 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

Evidence · table

> 2.2

Context: 1,616

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-46)

Sandstone Gold Project · gold

#### Identity

- Project: Sandstone Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:6e2be63e32c4f92bd18d
- Deposit or zone: Vanguard Camp

#### Resource Data

- Category: inferred
- Tonnes: 2194000
- Grade: 1.3
- Grade Unit: g/t
- Contained Metal: 90
- Contained Unit: koz
- Cutoff Grade: 0.4
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant inferred resource estimate for the Vanguard Camp deposit, with 2,194 kt at 1.3 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Negative factor: Inferred Resource

Evidence · table

> 1.3

Context: 2,194

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-47)

Sandstone Gold Project · gold

#### Identity

- Project: Sandstone Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:01b2cc94b074df217059
- Deposit or zone: Havilah Camp

#### Resource Data

- Category: inferred
- Tonnes: 1359000
- Grade: 1.2
- Grade Unit: g/t
- Contained Metal: 54
- Contained Unit: koz
- Cutoff Grade: 0.4
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant inferred resource estimate for the Havilah Camp deposit, with 1,359 kt at 1.2 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Negative factor: Inferred Resource

Evidence · table

> 1.2

Context: 1,359

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-48)

Sandstone Gold Project · gold

#### Identity

- Project: Sandstone Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:83a39cd3bf7717085bbc
- Deposit or zone: Indomitable Camp

#### Resource Data

- Category: indicated
- Tonnes: 2099000
- Grade: 1.2
- Grade Unit: g/t
- Contained Metal: 81
- Contained Unit: koz
- Cutoff Grade: 0.4
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant indicated resource estimate for the Indomitable Camp deposit, with 2,099 kt at 1.2 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

Evidence · table

> 1.2

Context: 2,099

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-49)

Sandstone Gold Project · gold

#### Identity

- Project: Sandstone Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:680d9ac97af7caa5bd86
- Deposit or zone: Indomitable Camp

#### Resource Data

- Category: inferred
- Tonnes: 8772000
- Grade: 1
- Grade Unit: g/t
- Contained Metal: 284
- Contained Unit: koz
- Cutoff Grade: 0.4
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant inferred resource estimate for the Indomitable Camp deposit, with 8,772 kt at 1.0 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Negative factor: Inferred Resource

Evidence · table

> 1.0

Context: 8,772

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-50)

Sandstone Gold Project · gold

#### Identity

- Project: Sandstone Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:6d8d6c0874eb525e5825
- Deposit or zone: Bull Oak

#### Resource Data

- Category: indicated
- Tonnes: 1481000
- Grade: 0.9
- Grade Unit: g/t
- Contained Metal: 44
- Contained Unit: koz
- Cutoff Grade: 0.4
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant indicated resource estimate for the Bull Oak deposit, with 1,481 kt at 0.9 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

Evidence · table

> 0.9

Context: 1,481

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-51)

Sandstone Gold Project · gold

#### Identity

- Project: Sandstone Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:875728422cc2d8a0db46
- Deposit or zone: Bull Oak

#### Resource Data

- Category: inferred
- Tonnes: 9056000
- Grade: 1
- Grade Unit: g/t
- Contained Metal: 278
- Contained Unit: koz
- Cutoff Grade: 0.4
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant inferred resource estimate for the Bull Oak deposit, with 9,056 kt at 1.0 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

- Negative factor: Inferred Resource

Evidence · table

> 1.0

Context: 9,056

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/btr-drilling-to-commence-at-priority-sandstone-tmh-style-targets--10da6df1-4e4c-45b3-8b86-e213f29ac2b1#fact-resource-facts-52)

Sandstone Gold Project · gold

#### Identity

- Project: Sandstone Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: BTR

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-28T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Graham de la Mare
- Resource group id: resource:cf1e5b27fe3dccd07460
- Deposit or zone: Two Mile Hill / Shillington

#### Resource Data

- Category: indicated
- Tonnes: 10413000
- Grade: 1.6
- Grade Unit: g/t
- Contained Metal: 526
- Contained Unit: koz
- Cutoff Grade: 0.4
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-09-28

#### Location

- Loc. Confidence: high

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-03T00:00:00.000Z

Reasoning: This is a JORC compliant indicated resource estimate for the Two Mile Hill / Shillington deposit, with 10,413 kt at 1.6 g/t gold.

- Positive factor: JORC compliant

- Positive factor: QP signed

Evidence · table

> 1.6

Context: 10,413

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
