BTR: Drilling to Commence at Priority Sandstone TMH-style Targets
Original announcement by asx on
- Company
- Brightstar Resources Limited
- Ticker
- BTR
- Exchange
- ASX
- Region
- Western Australia
- Primary commodity
- Unavailable
- Secondary commodities
- None reported
- Document categories
- Other, Resource update, Drill results
- Extracted
- 2026-11-03 23:15:48 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Brightstar Resources has identified 11 new priority gold targets at its Sandstone Gold Project, analogous to the Two Mile Hill and Bull Oak deposits. An RC drilling program is scheduled to commence in November 2026 to test the highest priority, drill-ready targets, with a broader corridor-wide program planned for 2027. The company also presented its consolidated JORC Mineral Resources, which have grown to 3.6Moz at Sandstone and 5.2Moz group-wide, and detailed historical drill results from the project.
Reasoning: The company has identified 11 new priority targets analogous to existing deposits and plans to commence RC drilling in November 2026, indicating future exploration activity. The document also provides an updated consolidated JORC Mineral Resource Estimate and historical drill results.
Positive factors
- New targets identified
- Drilling program planned
Negative factors
- No immediate drill results
Facts used in scoring: 53

Extracted facts
Stored fact records: 52. Some facts used in scoring do not have a stored record.
Resource Estimates (52)
indicatedLaverton Gold Project · goldTonnes: 371000Grade: 1.9Grade Unit: g/tContained Metal: 22Contained Unit: kozView all detailsHide details
Identity
- Project
- Laverton Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:2898eb68ea3a44db87ad
- Deposit or zone
- Alpha
Resource Data
- Category
- indicated
- Tonnes
- 371000
- Grade
- 1.9
- Grade Unit
- g/t
- Contained Metal
- 22
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant indicated resource estimate for the Alpha deposit, with 371 kt at 1.9 g/t gold.
Positive factors
- JORC compliant
- QP signed
Evidence · table
“1.9”
Context: 371
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
inferredLaverton Gold Project · goldTonnes: 1028000Grade: 2.8Grade Unit: g/tContained Metal: 92Contained Unit: kozView all detailsHide details
Identity
- Project
- Laverton Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:b45d058350eda8b794b9
- Deposit or zone
- Alpha
Resource Data
- Category
- inferred
- Tonnes
- 1028000
- Grade
- 2.8
- Grade Unit
- g/t
- Contained Metal
- 92
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant inferred resource estimate for the Alpha deposit, with 1,028 kt at 2.8 g/t gold.
Positive factors
- JORC compliant
- QP signed
Negative factors
- Inferred Resource
Evidence · table
“2.8”
Context: 1,028
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
measuredLaverton Gold Project · goldTonnes: 345000Grade: 1.7Grade Unit: g/tContained Metal: 19Contained Unit: kozView all detailsHide details
Identity
- Project
- Laverton Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:a2ecde40194f83304bfb
- Deposit or zone
- Beta
Resource Data
- Category
- measured
- Tonnes
- 345000
- Grade
- 1.7
- Grade Unit
- g/t
- Contained Metal
- 19
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant measured resource estimate for the Beta deposit, with 345 kt at 1.7 g/t gold.
Positive factors
- JORC compliant
- QP signed
- Measured Resource
Evidence · table
“1.7”
Context: 345
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
indicatedLaverton Gold Project · goldTonnes: 576000Grade: 1.6Grade Unit: g/tContained Metal: 29Contained Unit: kozView all detailsHide details
Identity
- Project
- Laverton Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:97360ca9a8fc88bbbae9
- Deposit or zone
- Beta
Resource Data
- Category
- indicated
- Tonnes
- 576000
- Grade
- 1.6
- Grade Unit
- g/t
- Contained Metal
- 29
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant indicated resource estimate for the Beta deposit, with 576 kt at 1.6 g/t gold.
Positive factors
- JORC compliant
- QP signed
Evidence · table
“1.6”
Context: 576
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
inferredLaverton Gold Project · goldTonnes: 961000Grade: 1.7Grade Unit: g/tContained Metal: 54Contained Unit: kozView all detailsHide details
Identity
- Project
- Laverton Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:fbe517035c647f62da71
- Deposit or zone
- Beta
Resource Data
- Category
- inferred
- Tonnes
- 961000
- Grade
- 1.7
- Grade Unit
- g/t
- Contained Metal
- 54
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant inferred resource estimate for the Beta deposit, with 961 kt at 1.7 g/t gold.
Positive factors
- JORC compliant
- QP signed
Negative factors
- Inferred Resource
Evidence · table
“1.7”
Context: 961
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
indicatedLaverton Gold Project · goldTonnes: 3264000Grade: 1.6Grade Unit: g/tContained Metal: 166Contained Unit: kozView all detailsHide details
Identity
- Project
- Laverton Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:8bce3f4f66c2ad9802d1
- Deposit or zone
- Cork Tree Well
Resource Data
- Category
- indicated
- Tonnes
- 3264000
- Grade
- 1.6
- Grade Unit
- g/t
- Contained Metal
- 166
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant indicated resource estimate for the Cork Tree Well deposit, with 3,264 kt at 1.6 g/t gold.
Positive factors
- JORC compliant
- QP signed
Evidence · table
“1.6”
Context: 3,264
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
inferredLaverton Gold Project · goldTonnes: 3198000Grade: 1.2Grade Unit: g/tContained Metal: 126Contained Unit: kozView all detailsHide details
Identity
- Project
- Laverton Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:e044a95fa6db4029678e
- Deposit or zone
- Cork Tree Well
Resource Data
- Category
- inferred
- Tonnes
- 3198000
- Grade
- 1.2
- Grade Unit
- g/t
- Contained Metal
- 126
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant inferred resource estimate for the Cork Tree Well deposit, with 3,198 kt at 1.2 g/t gold.
Positive factors
- JORC compliant
- QP signed
Negative factors
- Inferred Resource
Evidence · table
“1.2”
Context: 3,198
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
measuredLaverton Gold Project · goldTonnes: 311000Grade: 1.7Grade Unit: g/tContained Metal: 17Contained Unit: kozView all detailsHide details
Identity
- Project
- Laverton Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:64b0f38b51b6374ca7a5
- Deposit or zone
- Lord Byron
Resource Data
- Category
- measured
- Tonnes
- 311000
- Grade
- 1.7
- Grade Unit
- g/t
- Contained Metal
- 17
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant measured resource estimate for the Lord Byron deposit, with 311 kt at 1.7 g/t gold.
Positive factors
- JORC compliant
- QP signed
- Measured Resource
Evidence · table
“1.7”
Context: 311
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
indicatedLaverton Gold Project · goldTonnes: 2104000Grade: 1.5Grade Unit: g/tContained Metal: 105Contained Unit: kozView all detailsHide details
Identity
- Project
- Laverton Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:0899807f59741fbcc021
- Deposit or zone
- Lord Byron
Resource Data
- Category
- indicated
- Tonnes
- 2104000
- Grade
- 1.5
- Grade Unit
- g/t
- Contained Metal
- 105
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant indicated resource estimate for the Lord Byron deposit, with 2,104 kt at 1.5 g/t gold.
Positive factors
- JORC compliant
- QP signed
Evidence · table
“1.5”
Context: 2,104
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
inferredLaverton Gold Project · goldTonnes: 2974000Grade: 1.5Grade Unit: g/tContained Metal: 145Contained Unit: kozView all detailsHide details
Identity
- Project
- Laverton Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:32c09bb6a65cce02cf23
- Deposit or zone
- Lord Byron
Resource Data
- Category
- inferred
- Tonnes
- 2974000
- Grade
- 1.5
- Grade Unit
- g/t
- Contained Metal
- 145
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant inferred resource estimate for the Lord Byron deposit, with 2,974 kt at 1.5 g/t gold.
Positive factors
- JORC compliant
- QP signed
Negative factors
- Inferred Resource
Evidence · table
“1.5”
Context: 2,974
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
measuredLaverton Gold Project · goldTonnes: 25000Grade: 5.4Grade Unit: g/tContained Metal: 4Contained Unit: kozView all detailsHide details
Identity
- Project
- Laverton Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:4bb10ffd5bcc11e8f1c2
- Deposit or zone
- Fish
Resource Data
- Category
- measured
- Tonnes
- 25000
- Grade
- 5.4
- Grade Unit
- g/t
- Contained Metal
- 4
- Contained Unit
- koz
- Cutoff Grade
- 1.6
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant measured resource estimate for the Fish deposit, with 25 kt at 5.4 g/t gold.
Positive factors
- JORC compliant
- QP signed
- Measured Resource
Evidence · table
“5.4”
Context: 25
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
indicatedLaverton Gold Project · goldTonnes: 199000Grade: 4.5Grade Unit: g/tContained Metal: 29Contained Unit: kozView all detailsHide details
Identity
- Project
- Laverton Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:1a14e72c60485f2fb503
- Deposit or zone
- Fish
Resource Data
- Category
- indicated
- Tonnes
- 199000
- Grade
- 4.5
- Grade Unit
- g/t
- Contained Metal
- 29
- Contained Unit
- koz
- Cutoff Grade
- 1.6
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant indicated resource estimate for the Fish deposit, with 199 kt at 4.5 g/t gold.
Positive factors
- JORC compliant
- QP signed
Evidence · table
“4.5”
Context: 199
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
inferredLaverton Gold Project · goldTonnes: 153000Grade: 3.2Grade Unit: g/tContained Metal: 16Contained Unit: kozView all detailsHide details
Identity
- Project
- Laverton Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:353966581f88e6fa2a5b
- Deposit or zone
- Fish
Resource Data
- Category
- inferred
- Tonnes
- 153000
- Grade
- 3.2
- Grade Unit
- g/t
- Contained Metal
- 16
- Contained Unit
- koz
- Cutoff Grade
- 1.6
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant inferred resource estimate for the Fish deposit, with 153 kt at 3.2 g/t gold.
Positive factors
- JORC compliant
- QP signed
Negative factors
- Inferred Resource
Evidence · table
“3.2”
Context: 153
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
indicatedLaverton Gold Project · goldTonnes: 15000Grade: 2.2Grade Unit: g/tContained Metal: 1Contained Unit: kozView all detailsHide details
Identity
- Project
- Laverton Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:a7d1956a0e02ecdda86f
- Deposit or zone
- Gilt Key
Resource Data
- Category
- indicated
- Tonnes
- 15000
- Grade
- 2.2
- Grade Unit
- g/t
- Contained Metal
- 1
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant indicated resource estimate for the Gilt Key deposit, with 15 kt at 2.2 g/t gold.
Positive factors
- JORC compliant
- QP signed
Evidence · table
“2.2”
Context: 15
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
inferredLaverton Gold Project · goldTonnes: 153000Grade: 1.3Grade Unit: g/tContained Metal: 6Contained Unit: kozView all detailsHide details
Identity
- Project
- Laverton Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:647f876b65c1b817f173
- Deposit or zone
- Gilt Key
Resource Data
- Category
- inferred
- Tonnes
- 153000
- Grade
- 1.3
- Grade Unit
- g/t
- Contained Metal
- 6
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant inferred resource estimate for the Gilt Key deposit, with 153 kt at 1.3 g/t gold.
Positive factors
- JORC compliant
- QP signed
Negative factors
- Inferred Resource
Evidence · table
“1.3”
Context: 153
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
measuredLaverton Gold Project · goldTonnes: 24000Grade: 15.3Grade Unit: g/tContained Metal: 12Contained Unit: kozView all detailsHide details
Identity
- Project
- Laverton Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:065877e49140ee9b01e6
- Deposit or zone
- Second Fortune (UG)
Resource Data
- Category
- measured
- Tonnes
- 24000
- Grade
- 15.3
- Grade Unit
- g/t
- Contained Metal
- 12
- Contained Unit
- koz
- Cutoff Grade
- 2.5
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant measured resource estimate for the Second Fortune (UG) deposit, with 24 kt at 15.3 g/t gold.
Positive factors
- JORC compliant
- QP signed
- Measured Resource
Evidence · table
“15.3”
Context: 24
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
indicatedLaverton Gold Project · goldTonnes: 34000Grade: 13.7Grade Unit: g/tContained Metal: 15Contained Unit: kozView all detailsHide details
Identity
- Project
- Laverton Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:7fac4af2370c4bb84dd8
- Deposit or zone
- Second Fortune (UG)
Resource Data
- Category
- indicated
- Tonnes
- 34000
- Grade
- 13.7
- Grade Unit
- g/t
- Contained Metal
- 15
- Contained Unit
- koz
- Cutoff Grade
- 2.5
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant indicated resource estimate for the Second Fortune (UG) deposit, with 34 kt at 13.7 g/t gold.
Positive factors
- JORC compliant
- QP signed
Evidence · table
“13.7”
Context: 34
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
inferredLaverton Gold Project · goldTonnes: 34000Grade: 11.7Grade Unit: g/tContained Metal: 13Contained Unit: kozView all detailsHide details
Identity
- Project
- Laverton Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:1f3f9d443f8d5445248c
- Deposit or zone
- Second Fortune (UG)
Resource Data
- Category
- inferred
- Tonnes
- 34000
- Grade
- 11.7
- Grade Unit
- g/t
- Contained Metal
- 13
- Contained Unit
- koz
- Cutoff Grade
- 2.5
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant inferred resource estimate for the Second Fortune (UG) deposit, with 34 kt at 11.7 g/t gold.
Positive factors
- JORC compliant
- QP signed
Negative factors
- Inferred Resource
Evidence · table
“11.7”
Context: 34
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
indicatedMenzies Gold Project · goldTonnes: 3725000Grade: 1.4Grade Unit: g/tContained Metal: 168Contained Unit: kozView all detailsHide details
Identity
- Project
- Menzies Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:6fce92f74f564950d578
- Deposit or zone
- Lady Shenton System
Resource Data
- Category
- indicated
- Tonnes
- 3725000
- Grade
- 1.4
- Grade Unit
- g/t
- Contained Metal
- 168
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant indicated resource estimate for the Lady Shenton System deposit, with 3,725 kt at 1.4 g/t gold.
Positive factors
- JORC compliant
- QP signed
Evidence · table
“1.4”
Context: 3,725
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
inferredMenzies Gold Project · goldTonnes: 4349000Grade: 1.3Grade Unit: g/tContained Metal: 184Contained Unit: kozView all detailsHide details
Identity
- Project
- Menzies Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:a9e9e49227fdf19e3224
- Deposit or zone
- Lady Shenton System
Resource Data
- Category
- inferred
- Tonnes
- 4349000
- Grade
- 1.3
- Grade Unit
- g/t
- Contained Metal
- 184
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant inferred resource estimate for the Lady Shenton System deposit, with 4,349 kt at 1.3 g/t gold.
Positive factors
- JORC compliant
- QP signed
Negative factors
- Inferred Resource
Evidence · table
“1.3”
Context: 4,349
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
indicatedMenzies Gold Project · goldTonnes: 2172000Grade: 2.2Grade Unit: g/tContained Metal: 152Contained Unit: kozView all detailsHide details
Identity
- Project
- Menzies Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:4e3427d638cad221babf
- Deposit or zone
- Yunndaga
Resource Data
- Category
- indicated
- Tonnes
- 2172000
- Grade
- 2.2
- Grade Unit
- g/t
- Contained Metal
- 152
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant indicated resource estimate for the Yunndaga deposit, with 2,172 kt at 2.2 g/t gold.
Positive factors
- JORC compliant
- QP signed
Evidence · table
“2.2”
Context: 2,172
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
inferredMenzies Gold Project · goldTonnes: 923000Grade: 1.8Grade Unit: g/tContained Metal: 54Contained Unit: kozView all detailsHide details
Identity
- Project
- Menzies Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:52436f9db23b84c6f68e
- Deposit or zone
- Yunndaga
Resource Data
- Category
- inferred
- Tonnes
- 923000
- Grade
- 1.8
- Grade Unit
- g/t
- Contained Metal
- 54
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant inferred resource estimate for the Yunndaga deposit, with 923 kt at 1.8 g/t gold.
Positive factors
- JORC compliant
- QP signed
Negative factors
- Inferred Resource
Evidence · table
“1.8”
Context: 923
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
indicatedMenzies Gold Project · goldTonnes: 137000Grade: 1.7Grade Unit: g/tContained Metal: 7Contained Unit: kozView all detailsHide details
Identity
- Project
- Menzies Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:2b933a1618fef2505dfb
- Deposit or zone
- Aspacia
Resource Data
- Category
- indicated
- Tonnes
- 137000
- Grade
- 1.7
- Grade Unit
- g/t
- Contained Metal
- 7
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant indicated resource estimate for the Aspacia deposit, with 137 kt at 1.7 g/t gold.
Positive factors
- JORC compliant
- QP signed
Evidence · table
“1.7”
Context: 137
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
inferredMenzies Gold Project · goldTonnes: 1238000Grade: 1.6Grade Unit: g/tContained Metal: 62Contained Unit: kozView all detailsHide details
Identity
- Project
- Menzies Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:febb1f7f203e4194ea82
- Deposit or zone
- Aspacia
Resource Data
- Category
- inferred
- Tonnes
- 1238000
- Grade
- 1.6
- Grade Unit
- g/t
- Contained Metal
- 62
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant inferred resource estimate for the Aspacia deposit, with 1,238 kt at 1.6 g/t gold.
Positive factors
- JORC compliant
- QP signed
Negative factors
- Inferred Resource
Evidence · table
“1.6”
Context: 1,238
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
indicatedMenzies Gold Project · goldTonnes: 520000Grade: 1.3Grade Unit: g/tContained Metal: 22Contained Unit: kozView all detailsHide details
Identity
- Project
- Menzies Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:32c74937b420240990ff
- Deposit or zone
- Lady Harriet System
Resource Data
- Category
- indicated
- Tonnes
- 520000
- Grade
- 1.3
- Grade Unit
- g/t
- Contained Metal
- 22
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant indicated resource estimate for the Lady Harriet System deposit, with 520 kt at 1.3 g/t gold.
Positive factors
- JORC compliant
- QP signed
Evidence · table
“1.3”
Context: 520
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
inferredMenzies Gold Project · goldTonnes: 590000Grade: 1.1Grade Unit: g/tContained Metal: 21Contained Unit: kozView all detailsHide details
Identity
- Project
- Menzies Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:8797c5ddfe9cb1f7dd94
- Deposit or zone
- Lady Harriet System
Resource Data
- Category
- inferred
- Tonnes
- 590000
- Grade
- 1.1
- Grade Unit
- g/t
- Contained Metal
- 21
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant inferred resource estimate for the Lady Harriet System deposit, with 590 kt at 1.1 g/t gold.
Positive factors
- JORC compliant
- QP signed
Negative factors
- Inferred Resource
Evidence · table
“1.1”
Context: 590
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
indicatedMenzies Gold Project · goldTonnes: 160000Grade: 1.3Grade Unit: g/tContained Metal: 7Contained Unit: kozView all detailsHide details
Identity
- Project
- Menzies Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:d9eaa684a47cf10ac103
- Deposit or zone
- Link Zone
Resource Data
- Category
- indicated
- Tonnes
- 160000
- Grade
- 1.3
- Grade Unit
- g/t
- Contained Metal
- 7
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant indicated resource estimate for the Link Zone deposit, with 160 kt at 1.3 g/t gold.
Positive factors
- JORC compliant
- QP signed
Evidence · table
“1.3”
Context: 160
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
inferredMenzies Gold Project · goldTonnes: 740000Grade: 1Grade Unit: g/tContained Metal: 23Contained Unit: kozView all detailsHide details
Identity
- Project
- Menzies Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:61799d062f26fd727462
- Deposit or zone
- Link Zone
Resource Data
- Category
- inferred
- Tonnes
- 740000
- Grade
- 1
- Grade Unit
- g/t
- Contained Metal
- 23
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant inferred resource estimate for the Link Zone deposit, with 740 kt at 1.0 g/t gold.
Positive factors
- JORC compliant
- QP signed
Negative factors
- Inferred Resource
Evidence · table
“1.0”
Context: 740
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
indicatedMenzies Gold Project · goldTonnes: 30000Grade: 6.3Grade Unit: g/tContained Metal: 6Contained Unit: kozView all detailsHide details
Identity
- Project
- Menzies Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:be6a88cedb0d33e01afa
- Deposit or zone
- Selkirk
Resource Data
- Category
- indicated
- Tonnes
- 30000
- Grade
- 6.3
- Grade Unit
- g/t
- Contained Metal
- 6
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant indicated resource estimate for the Selkirk deposit, with 30 kt at 6.3 g/t gold.
Positive factors
- JORC compliant
- QP signed
Evidence · table
“6.3”
Context: 30
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
inferredMenzies Gold Project · goldTonnes: 140000Grade: 1.2Grade Unit: g/tContained Metal: 5Contained Unit: kozView all detailsHide details
Identity
- Project
- Menzies Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:20e25f8bff3c113b8931
- Deposit or zone
- Selkirk
Resource Data
- Category
- inferred
- Tonnes
- 140000
- Grade
- 1.2
- Grade Unit
- g/t
- Contained Metal
- 5
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant inferred resource estimate for the Selkirk deposit, with 140 kt at 1.2 g/t gold.
Positive factors
- JORC compliant
- QP signed
Negative factors
- Inferred Resource
Evidence · table
“1.2”
Context: 140
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
inferredMenzies Gold Project · goldTonnes: 100000Grade: 1.7Grade Unit: g/tContained Metal: 6Contained Unit: kozView all detailsHide details
Identity
- Project
- Menzies Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:a601930c268780c79606
- Deposit or zone
- Lady Irene
Resource Data
- Category
- inferred
- Tonnes
- 100000
- Grade
- 1.7
- Grade Unit
- g/t
- Contained Metal
- 6
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant inferred resource estimate for the Lady Irene deposit, with 100 kt at 1.7 g/t gold.
Positive factors
- JORC compliant
- QP signed
Negative factors
- Inferred Resource
Evidence · table
“1.7”
Context: 100
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
indicatedSandstone Gold Project · goldTonnes: 1683000Grade: 2.1Grade Unit: g/tContained Metal: 114Contained Unit: kozView all detailsHide details
Identity
- Project
- Sandstone Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:3b3befd2550ab020c8b5
- Deposit or zone
- Montague-Evermore
Resource Data
- Category
- indicated
- Tonnes
- 1683000
- Grade
- 2.1
- Grade Unit
- g/t
- Contained Metal
- 114
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant indicated resource estimate for the Montague-Evermore deposit, with 1,683 kt at 2.1 g/t gold.
Positive factors
- JORC compliant
- QP signed
Evidence · table
“2.1”
Context: 1,683
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
inferredSandstone Gold Project · goldTonnes: 3122000Grade: 1.3Grade Unit: g/tContained Metal: 127Contained Unit: kozView all detailsHide details
Identity
- Project
- Sandstone Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:6409ebf78b1c101b1e43
- Deposit or zone
- Montague-Evermore
Resource Data
- Category
- inferred
- Tonnes
- 3122000
- Grade
- 1.3
- Grade Unit
- g/t
- Contained Metal
- 127
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant inferred resource estimate for the Montague-Evermore deposit, with 3,122 kt at 1.3 g/t gold.
Positive factors
- JORC compliant
- QP signed
Negative factors
- Inferred Resource
Evidence · table
“1.3”
Context: 3,122
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
indicatedSandstone Gold Project · goldTonnes: 1258000Grade: 2Grade Unit: g/tContained Metal: 79Contained Unit: kozView all detailsHide details
Identity
- Project
- Sandstone Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:ea57cf6a034ffd8d9f7b
- Deposit or zone
- Whistler
Resource Data
- Category
- indicated
- Tonnes
- 1258000
- Grade
- 2
- Grade Unit
- g/t
- Contained Metal
- 79
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant indicated resource estimate for the Whistler deposit, with 1,258 kt at 2.0 g/t gold.
Positive factors
- JORC compliant
- QP signed
Evidence · table
“2.0”
Context: 1,258
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
inferredSandstone Gold Project · goldTonnes: 565000Grade: 1.4Grade Unit: g/tContained Metal: 25Contained Unit: kozView all detailsHide details
Identity
- Project
- Sandstone Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:b8240860414ba143575d
- Deposit or zone
- Whistler
Resource Data
- Category
- inferred
- Tonnes
- 565000
- Grade
- 1.4
- Grade Unit
- g/t
- Contained Metal
- 25
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant inferred resource estimate for the Whistler deposit, with 565 kt at 1.4 g/t gold.
Positive factors
- JORC compliant
- QP signed
Negative factors
- Inferred Resource
Evidence · table
“1.4”
Context: 565
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
indicatedSandstone Gold Project · goldTonnes: 2130000Grade: 1.3Grade Unit: g/tContained Metal: 90Contained Unit: kozView all detailsHide details
Identity
- Project
- Sandstone Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:24d2334dffe5162f3729
- Deposit or zone
- Achilles / Airport
Resource Data
- Category
- indicated
- Tonnes
- 2130000
- Grade
- 1.3
- Grade Unit
- g/t
- Contained Metal
- 90
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant indicated resource estimate for the Achilles / Airport deposit, with 2,130 kt at 1.3 g/t gold.
Positive factors
- JORC compliant
- QP signed
Evidence · table
“1.3”
Context: 2,130
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
inferredSandstone Gold Project · goldTonnes: 4255000Grade: 1Grade Unit: g/tContained Metal: 134Contained Unit: kozView all detailsHide details
Identity
- Project
- Sandstone Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:45b2e82cec62a34cd125
- Deposit or zone
- Achilles / Airport
Resource Data
- Category
- inferred
- Tonnes
- 4255000
- Grade
- 1
- Grade Unit
- g/t
- Contained Metal
- 134
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant inferred resource estimate for the Achilles / Airport deposit, with 4,255 kt at 1.0 g/t gold.
Positive factors
- JORC compliant
- QP signed
Negative factors
- Inferred Resource
Evidence · table
“1.0”
Context: 4,255
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
inferredSandstone Gold Project · goldTonnes: 1003000Grade: 0.9Grade Unit: g/tContained Metal: 30Contained Unit: kozView all detailsHide details
Identity
- Project
- Sandstone Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:1302bc2e49b3a6c105db
- Deposit or zone
- Duplex
Resource Data
- Category
- inferred
- Tonnes
- 1003000
- Grade
- 0.9
- Grade Unit
- g/t
- Contained Metal
- 30
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant inferred resource estimate for the Duplex deposit, with 1,003 kt at 0.9 g/t gold.
Positive factors
- JORC compliant
- QP signed
Negative factors
- Inferred Resource
Evidence · table
“0.9”
Context: 1,003
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
indicatedSandstone Gold Project · goldTonnes: 1258000Grade: 1.2Grade Unit: g/tContained Metal: 49Contained Unit: kozView all detailsHide details
Identity
- Project
- Sandstone Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:83a8c8225b8d9062bd95
- Deposit or zone
- Julias
- Ownership percent
- 75 %
- Resource basis
- attributable
Resource Data
- Category
- indicated
- Tonnes
- 1258000
- Grade
- 1.2
- Grade Unit
- g/t
- Contained Metal
- 49
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant indicated resource estimate for the Julias deposit, with 1,258 kt at 1.2 g/t gold, attributable to Brightstar.
Positive factors
- JORC compliant
- QP signed
Evidence · table
“1.2”
Context: 1,258
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
inferredSandstone Gold Project · goldTonnes: 556000Grade: 0.8Grade Unit: g/tContained Metal: 15Contained Unit: kozView all detailsHide details
Identity
- Project
- Sandstone Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:081c021da92b309454d7
- Deposit or zone
- Julias
- Ownership percent
- 75 %
- Resource basis
- attributable
Resource Data
- Category
- inferred
- Tonnes
- 556000
- Grade
- 0.8
- Grade Unit
- g/t
- Contained Metal
- 15
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant inferred resource estimate for the Julias deposit, with 556 kt at 0.8 g/t gold, attributable to Brightstar.
Positive factors
- JORC compliant
- QP signed
Negative factors
- Inferred Resource
Evidence · table
“0.8”
Context: 556
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
indicatedSandstone Gold Project · goldTonnes: 4441000Grade: 1.5Grade Unit: g/tContained Metal: 215Contained Unit: kozView all detailsHide details
Identity
- Project
- Sandstone Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:417d98953a532f8d0ec2
- Deposit or zone
- Lord Nelson
Resource Data
- Category
- indicated
- Tonnes
- 4441000
- Grade
- 1.5
- Grade Unit
- g/t
- Contained Metal
- 215
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant indicated resource estimate for the Lord Nelson deposit, with 4,441 kt at 1.5 g/t gold.
Positive factors
- JORC compliant
- QP signed
Evidence · table
“1.5”
Context: 4,441
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
inferredSandstone Gold Project · goldTonnes: 1758000Grade: 1.1Grade Unit: g/tContained Metal: 64Contained Unit: kozView all detailsHide details
Identity
- Project
- Sandstone Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:076b976160a115be61e6
- Deposit or zone
- Lord Nelson
Resource Data
- Category
- inferred
- Tonnes
- 1758000
- Grade
- 1.1
- Grade Unit
- g/t
- Contained Metal
- 64
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant inferred resource estimate for the Lord Nelson deposit, with 1,758 kt at 1.1 g/t gold.
Positive factors
- JORC compliant
- QP signed
Negative factors
- Inferred Resource
Evidence · table
“1.1”
Context: 1,758
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
indicatedSandstone Gold Project · goldTonnes: 1523000Grade: 1.6Grade Unit: g/tContained Metal: 76Contained Unit: kozView all detailsHide details
Identity
- Project
- Sandstone Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:4d0e500042fddaa0fdca
- Deposit or zone
- Lord Henry
Resource Data
- Category
- indicated
- Tonnes
- 1523000
- Grade
- 1.6
- Grade Unit
- g/t
- Contained Metal
- 76
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant indicated resource estimate for the Lord Henry deposit, with 1,523 kt at 1.6 g/t gold.
Positive factors
- JORC compliant
- QP signed
Evidence · table
“1.6”
Context: 1,523
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
inferredSandstone Gold Project · goldTonnes: 883000Grade: 1.4Grade Unit: g/tContained Metal: 40Contained Unit: kozView all detailsHide details
Identity
- Project
- Sandstone Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:e8c4b9081770474f8e2f
- Deposit or zone
- Lord Henry
Resource Data
- Category
- inferred
- Tonnes
- 883000
- Grade
- 1.4
- Grade Unit
- g/t
- Contained Metal
- 40
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant inferred resource estimate for the Lord Henry deposit, with 883 kt at 1.4 g/t gold.
Positive factors
- JORC compliant
- QP signed
Negative factors
- Inferred Resource
Evidence · table
“1.4”
Context: 883
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
indicatedSandstone Gold Project · goldTonnes: 1616000Grade: 2.2Grade Unit: g/tContained Metal: 115Contained Unit: kozView all detailsHide details
Identity
- Project
- Sandstone Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:be4cf3d260b16205c47b
- Deposit or zone
- Vanguard Camp
Resource Data
- Category
- indicated
- Tonnes
- 1616000
- Grade
- 2.2
- Grade Unit
- g/t
- Contained Metal
- 115
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant indicated resource estimate for the Vanguard Camp deposit, with 1,616 kt at 2.2 g/t gold.
Positive factors
- JORC compliant
- QP signed
Evidence · table
“2.2”
Context: 1,616
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
inferredSandstone Gold Project · goldTonnes: 2194000Grade: 1.3Grade Unit: g/tContained Metal: 90Contained Unit: kozView all detailsHide details
Identity
- Project
- Sandstone Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:6e2be63e32c4f92bd18d
- Deposit or zone
- Vanguard Camp
Resource Data
- Category
- inferred
- Tonnes
- 2194000
- Grade
- 1.3
- Grade Unit
- g/t
- Contained Metal
- 90
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant inferred resource estimate for the Vanguard Camp deposit, with 2,194 kt at 1.3 g/t gold.
Positive factors
- JORC compliant
- QP signed
Negative factors
- Inferred Resource
Evidence · table
“1.3”
Context: 2,194
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
inferredSandstone Gold Project · goldTonnes: 1359000Grade: 1.2Grade Unit: g/tContained Metal: 54Contained Unit: kozView all detailsHide details
Identity
- Project
- Sandstone Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:01b2cc94b074df217059
- Deposit or zone
- Havilah Camp
Resource Data
- Category
- inferred
- Tonnes
- 1359000
- Grade
- 1.2
- Grade Unit
- g/t
- Contained Metal
- 54
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant inferred resource estimate for the Havilah Camp deposit, with 1,359 kt at 1.2 g/t gold.
Positive factors
- JORC compliant
- QP signed
Negative factors
- Inferred Resource
Evidence · table
“1.2”
Context: 1,359
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
indicatedSandstone Gold Project · goldTonnes: 2099000Grade: 1.2Grade Unit: g/tContained Metal: 81Contained Unit: kozView all detailsHide details
Identity
- Project
- Sandstone Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:83a39cd3bf7717085bbc
- Deposit or zone
- Indomitable Camp
Resource Data
- Category
- indicated
- Tonnes
- 2099000
- Grade
- 1.2
- Grade Unit
- g/t
- Contained Metal
- 81
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant indicated resource estimate for the Indomitable Camp deposit, with 2,099 kt at 1.2 g/t gold.
Positive factors
- JORC compliant
- QP signed
Evidence · table
“1.2”
Context: 2,099
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
inferredSandstone Gold Project · goldTonnes: 8772000Grade: 1Grade Unit: g/tContained Metal: 284Contained Unit: kozView all detailsHide details
Identity
- Project
- Sandstone Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:680d9ac97af7caa5bd86
- Deposit or zone
- Indomitable Camp
Resource Data
- Category
- inferred
- Tonnes
- 8772000
- Grade
- 1
- Grade Unit
- g/t
- Contained Metal
- 284
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant inferred resource estimate for the Indomitable Camp deposit, with 8,772 kt at 1.0 g/t gold.
Positive factors
- JORC compliant
- QP signed
Negative factors
- Inferred Resource
Evidence · table
“1.0”
Context: 8,772
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
indicatedSandstone Gold Project · goldTonnes: 1481000Grade: 0.9Grade Unit: g/tContained Metal: 44Contained Unit: kozView all detailsHide details
Identity
- Project
- Sandstone Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:6d8d6c0874eb525e5825
- Deposit or zone
- Bull Oak
Resource Data
- Category
- indicated
- Tonnes
- 1481000
- Grade
- 0.9
- Grade Unit
- g/t
- Contained Metal
- 44
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant indicated resource estimate for the Bull Oak deposit, with 1,481 kt at 0.9 g/t gold.
Positive factors
- JORC compliant
- QP signed
Evidence · table
“0.9”
Context: 1,481
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
inferredSandstone Gold Project · goldTonnes: 9056000Grade: 1Grade Unit: g/tContained Metal: 278Contained Unit: kozView all detailsHide details
Identity
- Project
- Sandstone Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:875728422cc2d8a0db46
- Deposit or zone
- Bull Oak
Resource Data
- Category
- inferred
- Tonnes
- 9056000
- Grade
- 1
- Grade Unit
- g/t
- Contained Metal
- 278
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant inferred resource estimate for the Bull Oak deposit, with 9,056 kt at 1.0 g/t gold.
Positive factors
- JORC compliant
- QP signed
Negative factors
- Inferred Resource
Evidence · table
“1.0”
Context: 9,056
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
indicatedSandstone Gold Project · goldTonnes: 10413000Grade: 1.6Grade Unit: g/tContained Metal: 526Contained Unit: kozView all detailsHide details
Identity
- Project
- Sandstone Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- BTR
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-28T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Graham de la Mare
- Resource group id
- resource:cf1e5b27fe3dccd07460
- Deposit or zone
- Two Mile Hill / Shillington
Resource Data
- Category
- indicated
- Tonnes
- 10413000
- Grade
- 1.6
- Grade Unit
- g/t
- Contained Metal
- 526
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-09-28
Location
- Loc. Confidence
- high
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-03T00:00:00.000Z
Reasoning: This is a JORC compliant indicated resource estimate for the Two Mile Hill / Shillington deposit, with 10,413 kt at 1.6 g/t gold.
Positive factors
- JORC compliant
- QP signed
Evidence · table
“1.6”
Context: 10,413
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.