Boron One Announces Positive Study for Mineral Processing Facility

Original announcement by accesswire on

Company
Boron One Holdings Inc.
Ticker
BONE
Exchange
Unavailable
Region
Victoria, BC
Primary commodity
Boron
Secondary commodities
None reported
Document categories
Metallurgy
Extracted
2026-11-16 13:49:11 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Boron One has completed a mineral processing study for its Piskanja Borate Project, supporting a conceptual facility processing 250,000 tonnes per year. The study demonstrates that a high-grade (40% B2O3) colemanite concentrate can be produced with approximately 86% recovery using gravity-based separation.

Reasoning: The study confirms technical feasibility of a processing flowsheet with strong recovery and grade metrics using conventional methods.

Positive factors

  • High recovery rate of 86% B2O3
  • Commercial-grade concentrate (40% B2O3) achievable
  • Relies on conventional gravity separation rather than expensive chemical reagents
  • High water recirculation rate (90%)

Negative factors

  • Results based on laboratory and pilot-scale testing, not full commercial scale

Facts used in scoring: 2

Atlas analysis — Boron One Holdings Inc.: Boron One Announces Positive Study for Mineral Processing Facility. 86% recovery

Classification and evidence

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: The study evaluates a processing flowsheet involving crushing, screening, and centrifugal concentration.

Evidence · text

“The Study evaluated a gravity-based processing flowsheet incorporating crushing, screening, attrition scrubbing, centrifugal concentration, shaking table cleaning, thickening, filtration”

QP/CP Signedpositive · Story-specific tag

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: Nenad Rakic, a Qualified Person, has reviewed and approved the technical information.

Evidence · text

“Nenad Rakic, EurGeol, a Qualified Person as defined by National Instrument 43-101... has reviewed and approved the scientific and technical information”

Gravity Routeneutral

Gravity separation forms a material part of the flowsheet.

Why it applies: the document describes a gravity route ("gravity")

Multi-Domain Testedpositive

Variability across ore domains (oxide, transition, fresh) has been addressed.

Why it applies: 2 distinct composites were tested

Extracted facts

Stored fact records: 2. Some facts used in scoring do not have a stored record.

Metallurgical Results (2)

gravity separationPiskanja Borate Project · boronRecovery: 86 %Head Grade: 25Head Grade Unit: % B2O3View all details
Link to this fact

Identity

Project
Piskanja Borate Project
Commodity
boron
Region
australia_vic
Reported Region
Victoria, BC
Ticker
BONE

Test Work

Program Status
preliminary
Test Type
gravity separation
Processing Route
gravity-based processing flowsheet incorporating crushing, screening, attrition scrubbing, centrifugal concentration, shaking table cleaning, thickening, filtration and process-water recirculation
Sample
feed material averaging 25% B2O3

Recovery

Recovery
86 %
Recovery Basis
actual_test
Head Grade
25
Head Grade Unit
% B2O3

Lab

Laboratory
Mineral Mine Backfill Technologies d.o.o. and the Technical Faculty in Bor, University of Belgrade
Consultant
Mineral Mine Backfill Technologies d.o.o. and the Technical Faculty in Bor, University of Belgrade

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: High recovery and grade achieved via conventional mechanical methods.

Positive factors

  • 86% recovery is strong for a gravity-based route

Negative factors

  • Pilot-scale results may not represent actual operating conditions

Evidence · text

“Estimated overall B2O3 recovery of approximately 86%. ... Concentrate grade of approximately 40% B2O3 from feed material averaging 25% B2O3.”

Tags used in scoring

Gravity Routeneutral

Gravity separation forms a material part of the flowsheet.

Why it applies: processing_route matches the gravity signal

gravity separationPiskanja Borate Project · boronView all details
Link to this fact

Identity

Project
Piskanja Borate Project
Commodity
boron
Region
australia_vic
Reported Region
Victoria, BC
Ticker
BONE

Test Work

Program Status
preliminary
Test Type
gravity separation
Processing Route
gravity-based processing flowsheet incorporating crushing, screening, attrition scrubbing, centrifugal concentration, shaking table cleaning, thickening, filtration and process-water recirculation
Sample
concentrate

Recovery

Conc. Grade
40
Conc. Grade Unit
% B2O3

Lab

Laboratory
Mineral Mine Backfill Technologies d.o.o. and the Technical Faculty in Bor, University of Belgrade
Consultant
Mineral Mine Backfill Technologies d.o.o. and the Technical Faculty in Bor, University of Belgrade

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-16T00:00:00.000Z

Reasoning: Concentrate grade meets commercial specifications.

Positive factors

  • Produces commercial-grade concentrate

Evidence · text

“Concentrate grade of approximately 40% B2O3”

Tags used in scoring

Gravity Routeneutral

Gravity separation forms a material part of the flowsheet.

Why it applies: processing_route matches the gravity signal

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.