BMC: AGM Investor Presentation
Original announcement by asx on
- Company
- BMC Minerals Ltd.
- Ticker
- BMC
- Exchange
- ASX
- Region
- Yukon, Canada
- Primary commodity
- Silver
- Secondary commodities
- Gold, Zinc, Copper, Lead
- Document categories
- Other, Resource update, Metallurgy, Drill results
- Extracted
- 2026-11-18 02:10:53 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
BMC Minerals Ltd. presented its AGM Investor Presentation, highlighting the robust economics of its Kudz Ze Kayah (KZK) Mine Project, with an after-tax NPV5% of US$1.70 billion and an IRR of 54%. The company reported significant progress in permitting, including a positive Decision Document for the ABM Mine, and successful exploration drilling at various prospects. The presentation reiterated KZK's potential as a leading polymetallic project with a Probable Ore Reserve of 15.7 Mt at high silver, gold, zinc, copper, and lead grades.
Reasoning: The AGM Investor Presentation provides a comprehensive overview of BMC Minerals' operations, highlighting strong project economics and recent achievements, but primarily reiterates previously disclosed information for an AGM audience.
Positive factors
- Strong project economics confirmed by updated Feasibility Study (NPV, IRR, payback)
- Positive permitting milestones achieved for the ABM Mine
- Successful exploration drilling highlights high-grade polymetallic intercepts
- Successful ASX listing and increased market capitalization
Negative factors
- Primarily reiterates previously disclosed information for an AGM audience, limiting novelty
Low confidence — this extraction should be reviewed alongside the original source.
Facts used in scoring: 65

Classification and evidence
Mill Routeneutral
Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
Why it applies: the document describes a flotation route ("concentrate")
Gravity Routeneutral
Gravity separation forms a material part of the flowsheet.
Why it applies: the document describes a gravity route ("gravity")
Extracted facts
Stored fact records: 50. Some facts used in scoring do not have a stored record.
Drill Results (4)
K26-560Kudz Ze Kayah Mine · silverGrade: 180Grade Unit: g/tIntercept: 25.1 mNeeds review: ungroundedView all detailsHide details
Identity
- Hole ID
- K26-560
- Project
- Kudz Ze Kayah Mine
- Commodity
- silver
- Region
- canada_yt
- Reported Region
- canada_yt
- Ticker
- BMC
Geometry
- Grade
- 180
- Grade Unit
- g/t
- Intercept
- 25.1 m
Classification
- Deposit Type
- vms
- Program
- exploration
- Sample Type
- drill
- Group ID
- K26-560:null-null
- Mining Method
- mixed
QA/QC
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards
Review
- Needs Review
- Yes
- Review Reason
- ungrounded
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: This intercept of 25.1m at 180 g/t silver at Krakatoa is an exceptional result, demonstrating very high-grade silver mineralization over a significant width, matching previous best results and significantly exceeding project averages.
Positive factors
- Exceptional silver grade (180 g/t) well above VMS peer average and 75th percentile
- Exceptional grade-width product (4518 g/t·m) indicating significant mineralization
- Strong intercept width (25.1m) demonstrating good continuity
- Matches the best prior intercept for silver at Krakatoa, confirming high-grade potential
Evidence · text
“25.1m at 180 g/t silver and 9.7% zinc at Krakatoa”
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Bonanza InterceptRejected · positive
Exceptionally high-grade zone, well above the deposit-type norm.
Reason: Silver grade of 180 g/t is exceptionally high for a VMS deposit, well above the 75th percentile of peer deposits.
Evidence · text
“180 g/t silver”
K26-560Kudz Ze Kayah Mine · zincGrade: 9.7Grade Unit: %Intercept: 25.1 mNeeds review: ungroundedView all detailsHide details
Identity
- Hole ID
- K26-560
- Project
- Kudz Ze Kayah Mine
- Commodity
- zinc
- Region
- canada_yt
- Reported Region
- canada_yt
- Ticker
- BMC
Geometry
- Grade
- 9.7
- Grade Unit
- %
- Intercept
- 25.1 m
Classification
- Deposit Type
- vms
- Program
- exploration
- Sample Type
- drill
- Group ID
- K26-560:null-null
- Mining Method
- mixed
QA/QC
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards
Review
- Needs Review
- Yes
- Review Reason
- ungrounded
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: This intercept of 25.1m at 9.7% zinc at Krakatoa is a very strong result, demonstrating high-grade zinc mineralization over a significant width, matching previous best results and significantly exceeding project averages.
Positive factors
- Strong zinc grade (9.7%) for a VMS deposit
- Exceptional grade-width product (243.47 %·m) indicating significant mineralization
- Strong intercept width (25.1m) demonstrating good continuity
- Matches the best prior intercept for zinc at Krakatoa, confirming high-grade potential
Evidence · text
“25.1m at 180 g/t silver and 9.7% zinc at Krakatoa”
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
K26-608Kudz Ze Kayah Mine · silverGrade: 233Grade Unit: g/tIntercept: 5.2 mNeeds review: ungroundedView all detailsHide details
Identity
- Hole ID
- K26-608
- Project
- Kudz Ze Kayah Mine
- Commodity
- silver
- Region
- canada_yt
- Reported Region
- canada_yt
- Ticker
- BMC
Geometry
- Grade
- 233
- Grade Unit
- g/t
- Intercept
- 5.2 m
Classification
- Deposit Type
- vms
- Program
- exploration
- Sample Type
- drill
- Group ID
- K26-608:null-null
- Mining Method
- mixed
QA/QC
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards
Review
- Needs Review
- Yes
- Review Reason
- ungrounded
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: This intercept of 5.2m at 233 g/t silver at Rhyolite Peak is an exceptional result, demonstrating very high-grade silver mineralization over a moderate width, exceeding project averages and showing good continuity.
Positive factors
- Exceptional silver grade (233 g/t) well above VMS peer average and 75th percentile
- Strong grade-width product (1211.6 g/t·m) indicating significant mineralization
- Wider than the previous best silver intercept at Rhyolite Peak, suggesting good continuity
Evidence · text
“5.2m at 233 g/t silver and 9% zinc at Rhyolite Peak”
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Bonanza InterceptRejected · positive
Exceptionally high-grade zone, well above the deposit-type norm.
Reason: Silver grade of 233 g/t is exceptionally high for a VMS deposit, well above the 75th percentile of peer deposits.
Evidence · text
“233 g/t silver”
K26-608Kudz Ze Kayah Mine · zincGrade: 9Grade Unit: %Intercept: 5.2 mNeeds review: ungroundedView all detailsHide details
Identity
- Hole ID
- K26-608
- Project
- Kudz Ze Kayah Mine
- Commodity
- zinc
- Region
- canada_yt
- Reported Region
- canada_yt
- Ticker
- BMC
Geometry
- Grade
- 9
- Grade Unit
- %
- Intercept
- 5.2 m
Classification
- Deposit Type
- vms
- Program
- exploration
- Sample Type
- drill
- Group ID
- K26-608:null-null
- Mining Method
- mixed
QA/QC
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards
Review
- Needs Review
- Yes
- Review Reason
- ungrounded
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: This intercept of 5.2m at 9% zinc at Rhyolite Peak is a strong result, demonstrating high-grade zinc mineralization over a moderate width, exceeding project averages and showing good continuity.
Positive factors
- Strong zinc grade (9%) for a VMS deposit
- Strong grade-width product (46.8 %·m) indicating significant mineralization
- Significantly wider than the previous best zinc intercept at Rhyolite Peak, suggesting good continuity
Evidence · text
“5.2m at 233 g/t silver and 9% zinc at Rhyolite Peak”
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Resource Estimates (41)
indicatedKudz Ze Kayah Mine Project · silverTonnes: 18300000Grade: 148Grade Unit: g/tView all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- silver
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:9c10c67e1fa5ff9a9a7c
- Deposit or zone
- ABM and Krakatoa Zones
Resource Data
- Category
- indicated
- Tonnes
- 18300000
- Grade
- 148
- Grade Unit
- g/t
Prior Estimate
- Resource Date
- 2025-01-03
Metal Equivalent
- Metal Eq. Grade
- 321
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Indicated Mineral Resource of 18.3 Mt at 148 g/t silver (321 g/t AgEq) represents a substantial, high-confidence resource base for the project.
Positive factors
- Large tonnage in the Indicated category provides high confidence for mine planning
- High silver grade contributes significantly to project economics
- Metal equivalent grade indicates strong overall polymetallic value
Evidence · text
“1.90.96.31.414818.3Indicated(ABM and Krakatoa Zones)”
Context: 18.3
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedKudz Ze Kayah Mine Project · goldTonnes: 18300000Grade: 1.4Grade Unit: g/tView all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- gold
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:9c10c67e1fa5ff9a9a7c
- Deposit or zone
- ABM and Krakatoa Zones
Resource Data
- Category
- indicated
- Tonnes
- 18300000
- Grade
- 1.4
- Grade Unit
- g/t
Prior Estimate
- Resource Date
- 2025-01-03
Metal Equivalent
- Metal Eq. Grade
- 321
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Indicated Mineral Resource of 18.3 Mt at 1.4 g/t gold provides a valuable byproduct credit, enhancing the overall polymetallic value of the resource.
Positive factors
- Gold grade provides significant byproduct credit to project economics
- Large tonnage in the Indicated category provides high confidence
Evidence · text
“1.90.96.31.414818.3Indicated(ABM and Krakatoa Zones)”
Context: 18.3
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedKudz Ze Kayah Mine Project · zincTonnes: 18300000Grade: 6.3Grade Unit: %View all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- zinc
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:9c10c67e1fa5ff9a9a7c
- Deposit or zone
- ABM and Krakatoa Zones
Resource Data
- Category
- indicated
- Tonnes
- 18300000
- Grade
- 6.3
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2025-01-03
Metal Equivalent
- Metal Eq. Grade
- 321
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Indicated Mineral Resource of 18.3 Mt at 6.3% zinc represents a substantial, high-confidence resource base for the project, with zinc being a key economic driver.
Positive factors
- High zinc grade contributes significantly to project economics
- Large tonnage in the Indicated category provides high confidence
Evidence · text
“1.90.96.31.414818.3Indicated(ABM and Krakatoa Zones)”
Context: 18.3
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedKudz Ze Kayah Mine Project · copperTonnes: 18300000Grade: 0.9Grade Unit: %View all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- copper
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:9c10c67e1fa5ff9a9a7c
- Deposit or zone
- ABM and Krakatoa Zones
Resource Data
- Category
- indicated
- Tonnes
- 18300000
- Grade
- 0.9
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2025-01-03
Metal Equivalent
- Metal Eq. Grade
- 321
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Indicated Mineral Resource of 18.3 Mt at 0.9% copper provides a valuable byproduct credit, enhancing the overall polymetallic value of the resource.
Positive factors
- Copper grade provides significant byproduct credit to project economics
- Large tonnage in the Indicated category provides high confidence
Evidence · text
“1.90.96.31.414818.3Indicated(ABM and Krakatoa Zones)”
Context: 18.3
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedKudz Ze Kayah Mine Project · leadTonnes: 18300000Grade: 1.9Grade Unit: %View all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- lead
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:9c10c67e1fa5ff9a9a7c
- Deposit or zone
- ABM and Krakatoa Zones
Resource Data
- Category
- indicated
- Tonnes
- 18300000
- Grade
- 1.9
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2025-01-03
Metal Equivalent
- Metal Eq. Grade
- 321
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Indicated Mineral Resource of 18.3 Mt at 1.9% lead provides a valuable byproduct credit, enhancing the overall polymetallic value of the resource.
Positive factors
- Lead grade provides significant byproduct credit to project economics
- Large tonnage in the Indicated category provides high confidence
Evidence · text
“1.90.96.31.414818.3Indicated(ABM and Krakatoa Zones)”
Context: 18.3
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredKudz Ze Kayah Mine Project · silverTonnes: 800000Grade: 143Grade Unit: g/tView all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- silver
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:a258cd56c6644c02de2f
- Deposit or zone
- ABM and Krakatoa Zones
Resource Data
- Category
- inferred
- Tonnes
- 800000
- Grade
- 143
- Grade Unit
- g/t
Prior Estimate
- Resource Date
- 2025-01-03
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Inferred Mineral Resource of 0.8 Mt at 143 g/t silver provides exploration upside but requires further drilling to improve confidence.
Positive factors
- High silver grade indicates potential for future resource upgrades
Negative factors
- Inferred category has lower geological confidence and cannot support economic studies alone
Evidence · text
“1.71.07.21.21430.8Inferred”
Context: 0.8
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredKudz Ze Kayah Mine Project · goldTonnes: 800000Grade: 1.2Grade Unit: g/tView all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- gold
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:a258cd56c6644c02de2f
- Deposit or zone
- ABM and Krakatoa Zones
Resource Data
- Category
- inferred
- Tonnes
- 800000
- Grade
- 1.2
- Grade Unit
- g/t
Prior Estimate
- Resource Date
- 2025-01-03
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Inferred Mineral Resource of 0.8 Mt at 1.2 g/t gold provides exploration upside for byproduct credits but requires further drilling to improve confidence.
Positive factors
- Gold grade provides potential byproduct credit
Negative factors
- Inferred category has lower geological confidence
Evidence · text
“1.71.07.21.21430.8Inferred”
Context: 0.8
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredKudz Ze Kayah Mine Project · zincTonnes: 800000Grade: 7.2Grade Unit: %View all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- zinc
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:a258cd56c6644c02de2f
- Deposit or zone
- ABM and Krakatoa Zones
Resource Data
- Category
- inferred
- Tonnes
- 800000
- Grade
- 7.2
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2025-01-03
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Inferred Mineral Resource of 0.8 Mt at 7.2% zinc provides exploration upside but requires further drilling to improve confidence.
Positive factors
- High zinc grade indicates potential for future resource upgrades
Negative factors
- Inferred category has lower geological confidence
Evidence · text
“1.71.07.21.21430.8Inferred”
Context: 0.8
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredKudz Ze Kayah Mine Project · copperTonnes: 800000Grade: 1Grade Unit: %View all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- copper
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:a258cd56c6644c02de2f
- Deposit or zone
- ABM and Krakatoa Zones
Resource Data
- Category
- inferred
- Tonnes
- 800000
- Grade
- 1
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2025-01-03
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Inferred Mineral Resource of 0.8 Mt at 1.0% copper provides exploration upside for byproduct credits but requires further drilling to improve confidence.
Positive factors
- Copper grade provides potential byproduct credit
Negative factors
- Inferred category has lower geological confidence
Evidence · text
“1.71.07.21.21430.8Inferred”
Context: 0.8
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredKudz Ze Kayah Mine Project · leadTonnes: 800000Grade: 1.7Grade Unit: %View all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- lead
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:a258cd56c6644c02de2f
- Deposit or zone
- ABM and Krakatoa Zones
Resource Data
- Category
- inferred
- Tonnes
- 800000
- Grade
- 1.7
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2025-01-03
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Inferred Mineral Resource of 0.8 Mt at 1.7% lead provides exploration upside for byproduct credits but requires further drilling to improve confidence.
Positive factors
- Lead grade provides potential byproduct credit
Negative factors
- Inferred category has lower geological confidence
Evidence · text
“1.71.07.21.21430.8Inferred”
Context: 0.8
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedKona · silverTonnes: 2100000Grade: 42Grade Unit: g/tView all detailsHide details
Identity
- Project
- Kona
- Commodity
- silver
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:f9de484c7353cbb611c9
Resource Data
- Category
- indicated
- Tonnes
- 2100000
- Grade
- 42
- Grade Unit
- g/t
Prior Estimate
- Resource Date
- 2026-01-30
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Indicated Mineral Resource of 2.1 Mt at 42 g/t silver at Kona provides a solid, reasonably confident resource base.
Positive factors
- Indicated category provides reasonable confidence for mine planning
- Silver grade contributes to overall project value
Evidence · text
“-1.6-0.842.1Indicated”
Context: 2.1
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedKona · zincTonnes: 2100000Grade: 0.8Grade Unit: %View all detailsHide details
Identity
- Project
- Kona
- Commodity
- zinc
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:f9de484c7353cbb611c9
Resource Data
- Category
- indicated
- Tonnes
- 2100000
- Grade
- 0.8
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-01-30
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Indicated Mineral Resource of 2.1 Mt at 0.8% zinc at Kona provides a byproduct credit from a reasonably confident resource base.
Positive factors
- Indicated category provides reasonable confidence
- Zinc grade provides byproduct credit
Evidence · text
“-1.6-0.842.1Indicated”
Context: 2.1
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedKona · leadTonnes: 2100000Grade: 1.6Grade Unit: %View all detailsHide details
Identity
- Project
- Kona
- Commodity
- lead
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:f9de484c7353cbb611c9
Resource Data
- Category
- indicated
- Tonnes
- 2100000
- Grade
- 1.6
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-01-30
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Indicated Mineral Resource of 2.1 Mt at 1.6% lead at Kona provides a byproduct credit from a reasonably confident resource base.
Positive factors
- Indicated category provides reasonable confidence
- Lead grade provides byproduct credit
Evidence · text
“-1.6-0.842.1Indicated”
Context: 2.1
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredKona · silverTonnes: 6700000Grade: 46Grade Unit: g/tView all detailsHide details
Identity
- Project
- Kona
- Commodity
- silver
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:4813ad6b3eb01810f927
Resource Data
- Category
- inferred
- Tonnes
- 6700000
- Grade
- 46
- Grade Unit
- g/t
Prior Estimate
- Resource Date
- 2026-01-30
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Inferred Mineral Resource of 6.7 Mt at 46 g/t silver at Kona provides exploration upside but requires further drilling to improve confidence.
Positive factors
- Silver grade indicates potential for future resource upgrades
Negative factors
- Inferred category has lower geological confidence and cannot support economic studies alone
Evidence · text
“Kona -1.7-0.646.7Inferred”
Context: 6.7
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredKona · zincTonnes: 6700000Grade: 0.6Grade Unit: %View all detailsHide details
Identity
- Project
- Kona
- Commodity
- zinc
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:4813ad6b3eb01810f927
Resource Data
- Category
- inferred
- Tonnes
- 6700000
- Grade
- 0.6
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-01-30
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Inferred Mineral Resource of 6.7 Mt at 0.6% zinc at Kona provides exploration upside for byproduct credits but requires further drilling to improve confidence.
Positive factors
- Zinc grade provides potential byproduct credit
Negative factors
- Inferred category has lower geological confidence
Evidence · text
“Kona -1.7-0.646.7Inferred”
Context: 6.7
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredKona · leadTonnes: 6700000Grade: 1.7Grade Unit: %View all detailsHide details
Identity
- Project
- Kona
- Commodity
- lead
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:4813ad6b3eb01810f927
Resource Data
- Category
- inferred
- Tonnes
- 6700000
- Grade
- 1.7
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-01-30
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Inferred Mineral Resource of 6.7 Mt at 1.7% lead at Kona provides exploration upside for byproduct credits but requires further drilling to improve confidence.
Positive factors
- Lead grade provides potential byproduct credit
Negative factors
- Inferred category has lower geological confidence
Evidence · text
“Kona -1.7-0.646.7Inferred”
Context: 6.7
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
probableKudz Ze Kayah Mine Project · silverTonnes: 13400000Grade: 131Grade Unit: g/tView all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- silver
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- reserve
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:26b330390a3dc317ef7f
- Deposit or zone
- ABM Zone
Resource Data
- Category
- probable
- Tonnes
- 13400000
- Grade
- 131
- Grade Unit
- g/t
Prior Estimate
- Resource Date
- 2026-06-30
Metal Equivalent
- Metal Eq. Grade
- 321
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Probable Ore Reserve of 13.4 Mt at 131 g/t silver (321 g/t AgEq) in the ABM Zone represents a substantial, economically viable resource base.
Positive factors
- Large tonnage in the Probable Reserve category provides high confidence for economic extraction
- High silver grade contributes significantly to project economics
- Metal equivalent grade indicates strong overall polymetallic value
Evidence · text
“1.50.95.91.313113.4ProbableABM Zone”
Context: 13.4
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The resource is classified as Probable Reserve, indicating demonstrated economic viability based on Indicated Resources and modifying factors.
Evidence · text
“Probable”
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
probableKudz Ze Kayah Mine Project · goldTonnes: 13400000Grade: 1.3Grade Unit: g/tView all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- gold
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- reserve
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:26b330390a3dc317ef7f
- Deposit or zone
- ABM Zone
Resource Data
- Category
- probable
- Tonnes
- 13400000
- Grade
- 1.3
- Grade Unit
- g/t
Prior Estimate
- Resource Date
- 2026-06-30
Metal Equivalent
- Metal Eq. Grade
- 321
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Probable Ore Reserve of 13.4 Mt at 1.3 g/t gold in the ABM Zone provides a valuable byproduct credit, enhancing the overall polymetallic value of the reserve.
Positive factors
- Gold grade provides significant byproduct credit to project economics
- Large tonnage in the Probable Reserve category provides high confidence
Evidence · text
“1.50.95.91.313113.4ProbableABM Zone”
Context: 13.4
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The resource is classified as Probable Reserve, indicating demonstrated economic viability based on Indicated Resources and modifying factors.
Evidence · text
“Probable”
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
probableKudz Ze Kayah Mine Project · zincTonnes: 13400000Grade: 5.9Grade Unit: %View all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- zinc
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- reserve
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:26b330390a3dc317ef7f
- Deposit or zone
- ABM Zone
Resource Data
- Category
- probable
- Tonnes
- 13400000
- Grade
- 5.9
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-06-30
Metal Equivalent
- Metal Eq. Grade
- 321
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Probable Ore Reserve of 13.4 Mt at 5.9% zinc in the ABM Zone represents a substantial, economically viable resource base, with zinc being a key economic driver.
Positive factors
- High zinc grade contributes significantly to project economics
- Large tonnage in the Probable Reserve category provides high confidence
Evidence · text
“1.50.95.91.313113.4ProbableABM Zone”
Context: 13.4
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The resource is classified as Probable Reserve, indicating demonstrated economic viability based on Indicated Resources and modifying factors.
Evidence · text
“Probable”
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
probableKudz Ze Kayah Mine Project · copperTonnes: 13400000Grade: 0.9Grade Unit: %View all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- copper
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- reserve
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:26b330390a3dc317ef7f
- Deposit or zone
- ABM Zone
Resource Data
- Category
- probable
- Tonnes
- 13400000
- Grade
- 0.9
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-06-30
Metal Equivalent
- Metal Eq. Grade
- 321
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Probable Ore Reserve of 13.4 Mt at 0.9% copper in the ABM Zone provides a valuable byproduct credit, enhancing the overall polymetallic value of the reserve.
Positive factors
- Copper grade provides significant byproduct credit to project economics
- Large tonnage in the Probable Reserve category provides high confidence
Evidence · text
“1.50.95.91.313113.4ProbableABM Zone”
Context: 13.4
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The resource is classified as Probable Reserve, indicating demonstrated economic viability based on Indicated Resources and modifying factors.
Evidence · text
“Probable”
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
probableKudz Ze Kayah Mine Project · leadTonnes: 13400000Grade: 1.5Grade Unit: %View all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- lead
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- reserve
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:26b330390a3dc317ef7f
- Deposit or zone
- ABM Zone
Resource Data
- Category
- probable
- Tonnes
- 13400000
- Grade
- 1.5
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-06-30
Metal Equivalent
- Metal Eq. Grade
- 321
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Probable Ore Reserve of 13.4 Mt at 1.5% lead in the ABM Zone provides a valuable byproduct credit, enhancing the overall polymetallic value of the reserve.
Positive factors
- Lead grade provides significant byproduct credit to project economics
- Large tonnage in the Probable Reserve category provides high confidence
Evidence · text
“1.50.95.91.313113.4ProbableABM Zone”
Context: 13.4
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The resource is classified as Probable Reserve, indicating demonstrated economic viability based on Indicated Resources and modifying factors.
Evidence · text
“Probable”
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
probableKudz Ze Kayah Mine Project · silverTonnes: 600000Grade: 246Grade Unit: g/tView all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- silver
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- reserve
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:be691e866192681672d6
- Deposit or zone
- Krakatoa Zone
Resource Data
- Category
- probable
- Tonnes
- 600000
- Grade
- 246
- Grade Unit
- g/t
Prior Estimate
- Resource Date
- 2026-06-30
Metal Equivalent
- Metal Eq. Grade
- 441
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Probable Ore Reserve of 0.6 Mt at 246 g/t silver (441 g/t AgEq) in the Krakatoa Zone represents a high-grade, economically viable component of the overall reserve.
Positive factors
- Very high silver grade significantly enhances project economics
- Probable Reserve classification provides high confidence for economic extraction
- Metal equivalent grade indicates very strong overall polymetallic value
Evidence · text
“3.10.46.31.92460.6ProbableKrakatoa Zone”
Context: 0.6
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The resource is classified as Probable Reserve, indicating demonstrated economic viability based on Indicated Resources and modifying factors.
Evidence · text
“Probable”
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
probableKudz Ze Kayah Mine Project · goldTonnes: 600000Grade: 1.9Grade Unit: g/tView all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- gold
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- reserve
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:be691e866192681672d6
- Deposit or zone
- Krakatoa Zone
Resource Data
- Category
- probable
- Tonnes
- 600000
- Grade
- 1.9
- Grade Unit
- g/t
Prior Estimate
- Resource Date
- 2026-06-30
Metal Equivalent
- Metal Eq. Grade
- 441
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Probable Ore Reserve of 0.6 Mt at 1.9 g/t gold in the Krakatoa Zone provides a valuable byproduct credit, enhancing the overall polymetallic value of the reserve.
Positive factors
- Gold grade provides significant byproduct credit to project economics
- Probable Reserve classification provides high confidence
Evidence · text
“3.10.46.31.92460.6ProbableKrakatoa Zone”
Context: 0.6
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The resource is classified as Probable Reserve, indicating demonstrated economic viability based on Indicated Resources and modifying factors.
Evidence · text
“Probable”
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
probableKudz Ze Kayah Mine Project · zincTonnes: 600000Grade: 6.3Grade Unit: %View all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- zinc
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- reserve
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:be691e866192681672d6
- Deposit or zone
- Krakatoa Zone
Resource Data
- Category
- probable
- Tonnes
- 600000
- Grade
- 6.3
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-06-30
Metal Equivalent
- Metal Eq. Grade
- 441
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Probable Ore Reserve of 0.6 Mt at 6.3% zinc in the Krakatoa Zone represents a high-grade, economically viable component of the overall reserve, with zinc being a key economic driver.
Positive factors
- High zinc grade contributes significantly to project economics
- Probable Reserve classification provides high confidence
Evidence · text
“3.10.46.31.92460.6ProbableKrakatoa Zone”
Context: 0.6
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The resource is classified as Probable Reserve, indicating demonstrated economic viability based on Indicated Resources and modifying factors.
Evidence · text
“Probable”
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
probableKudz Ze Kayah Mine Project · copperTonnes: 600000Grade: 0.4Grade Unit: %View all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- copper
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- reserve
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:be691e866192681672d6
- Deposit or zone
- Krakatoa Zone
Resource Data
- Category
- probable
- Tonnes
- 600000
- Grade
- 0.4
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-06-30
Metal Equivalent
- Metal Eq. Grade
- 441
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Probable Ore Reserve of 0.6 Mt at 0.4% copper in the Krakatoa Zone provides a byproduct credit, enhancing the overall polymetallic value of the reserve.
Positive factors
- Copper grade provides byproduct credit to project economics
- Probable Reserve classification provides high confidence
Evidence · text
“3.10.46.31.92460.6ProbableKrakatoa Zone”
Context: 0.6
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The resource is classified as Probable Reserve, indicating demonstrated economic viability based on Indicated Resources and modifying factors.
Evidence · text
“Probable”
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
probableKudz Ze Kayah Mine Project · leadTonnes: 600000Grade: 3.1Grade Unit: %View all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- lead
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- reserve
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:be691e866192681672d6
- Deposit or zone
- Krakatoa Zone
Resource Data
- Category
- probable
- Tonnes
- 600000
- Grade
- 3.1
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-06-30
Metal Equivalent
- Metal Eq. Grade
- 441
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Probable Ore Reserve of 0.6 Mt at 3.1% lead in the Krakatoa Zone provides a valuable byproduct credit, enhancing the overall polymetallic value of the reserve.
Positive factors
- High lead grade provides significant byproduct credit to project economics
- Probable Reserve classification provides high confidence
Evidence · text
“3.10.46.31.92460.6ProbableKrakatoa Zone”
Context: 0.6
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The resource is classified as Probable Reserve, indicating demonstrated economic viability based on Indicated Resources and modifying factors.
Evidence · text
“Probable”
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
probableKudz Ze Kayah Mine Project · silverTonnes: 14000000Grade: 136Grade Unit: g/tView all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- silver
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- reserve
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:27faf855b4809cedab9e
- Deposit or zone
- Total Open Pit
Resource Data
- Category
- probable
- Tonnes
- 14000000
- Grade
- 136
- Grade Unit
- g/t
Prior Estimate
- Resource Date
- 2026-06-30
Metal Equivalent
- Metal Eq. Grade
- 326
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Total Open Pit Probable Ore Reserve of 14.0 Mt at 136 g/t silver (326 g/t AgEq) represents a substantial, economically viable resource base for open-pit mining.
Positive factors
- Large tonnage in the Probable Reserve category provides high confidence for economic extraction
- High silver grade contributes significantly to project economics
- Metal equivalent grade indicates strong overall polymetallic value
Evidence · text
“1.60.95.91.313614.0ProbableTotal Open Pit”
Context: 14.0
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The resource is classified as Probable Reserve, indicating demonstrated economic viability based on Indicated Resources and modifying factors.
Evidence · text
“Probable”
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
probableKudz Ze Kayah Mine Project · goldTonnes: 14000000Grade: 1.3Grade Unit: g/tView all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- gold
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- reserve
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:27faf855b4809cedab9e
- Deposit or zone
- Total Open Pit
Resource Data
- Category
- probable
- Tonnes
- 14000000
- Grade
- 1.3
- Grade Unit
- g/t
Prior Estimate
- Resource Date
- 2026-06-30
Metal Equivalent
- Metal Eq. Grade
- 326
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Total Open Pit Probable Ore Reserve of 14.0 Mt at 1.3 g/t gold provides a valuable byproduct credit, enhancing the overall polymetallic value of the reserve.
Positive factors
- Gold grade provides significant byproduct credit to project economics
- Large tonnage in the Probable Reserve category provides high confidence
Evidence · text
“1.60.95.91.313614.0ProbableTotal Open Pit”
Context: 14.0
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The resource is classified as Probable Reserve, indicating demonstrated economic viability based on Indicated Resources and modifying factors.
Evidence · text
“Probable”
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
probableKudz Ze Kayah Mine Project · zincTonnes: 14000000Grade: 5.9Grade Unit: %View all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- zinc
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- reserve
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:27faf855b4809cedab9e
- Deposit or zone
- Total Open Pit
Resource Data
- Category
- probable
- Tonnes
- 14000000
- Grade
- 5.9
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-06-30
Metal Equivalent
- Metal Eq. Grade
- 326
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Total Open Pit Probable Ore Reserve of 14.0 Mt at 5.9% zinc represents a substantial, economically viable resource base for open-pit mining, with zinc being a key economic driver.
Positive factors
- High zinc grade contributes significantly to project economics
- Large tonnage in the Probable Reserve category provides high confidence
Evidence · text
“1.60.95.91.313614.0ProbableTotal Open Pit”
Context: 14.0
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The resource is classified as Probable Reserve, indicating demonstrated economic viability based on Indicated Resources and modifying factors.
Evidence · text
“Probable”
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
probableKudz Ze Kayah Mine Project · copperTonnes: 14000000Grade: 0.9Grade Unit: %View all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- copper
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- reserve
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:27faf855b4809cedab9e
- Deposit or zone
- Total Open Pit
Resource Data
- Category
- probable
- Tonnes
- 14000000
- Grade
- 0.9
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-06-30
Metal Equivalent
- Metal Eq. Grade
- 326
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Total Open Pit Probable Ore Reserve of 14.0 Mt at 0.9% copper provides a valuable byproduct credit, enhancing the overall polymetallic value of the reserve.
Positive factors
- Copper grade provides significant byproduct credit to project economics
- Large tonnage in the Probable Reserve category provides high confidence
Evidence · text
“1.60.95.91.313614.0ProbableTotal Open Pit”
Context: 14.0
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The resource is classified as Probable Reserve, indicating demonstrated economic viability based on Indicated Resources and modifying factors.
Evidence · text
“Probable”
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
probableKudz Ze Kayah Mine Project · leadTonnes: 14000000Grade: 1.6Grade Unit: %View all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- lead
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- reserve
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:27faf855b4809cedab9e
- Deposit or zone
- Total Open Pit
Resource Data
- Category
- probable
- Tonnes
- 14000000
- Grade
- 1.6
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-06-30
Metal Equivalent
- Metal Eq. Grade
- 326
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Total Open Pit Probable Ore Reserve of 14.0 Mt at 1.6% lead provides a valuable byproduct credit, enhancing the overall polymetallic value of the reserve.
Positive factors
- Lead grade provides significant byproduct credit to project economics
- Large tonnage in the Probable Reserve category provides high confidence
Evidence · text
“1.60.95.91.313614.0ProbableTotal Open Pit”
Context: 14.0
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
probableKudz Ze Kayah Mine Project · silverTonnes: 1700000Grade: 147Grade Unit: g/tView all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- silver
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- reserve
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:7770ee6d09c634801b39
- Deposit or zone
- Krakatoa Underground
Resource Data
- Category
- probable
- Tonnes
- 1700000
- Grade
- 147
- Grade Unit
- g/t
Prior Estimate
- Resource Date
- 2026-06-30
Metal Equivalent
- Metal Eq. Grade
- 301
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Krakatoa Underground Probable Ore Reserve of 1.7 Mt at 147 g/t silver (301 g/t AgEq) represents a high-grade, economically viable component for underground mining.
Positive factors
- High silver grade contributes significantly to project economics
- Probable Reserve classification provides high confidence for economic extraction
- Metal equivalent grade indicates strong overall polymetallic value
Evidence · text
“2.30.45.01.31471.7ProbableKrakatoa Underground”
Context: 1.7
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The resource is classified as Probable Reserve, indicating demonstrated economic viability based on Indicated Resources and modifying factors.
Evidence · text
“Probable”
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
probableKudz Ze Kayah Mine Project · goldTonnes: 1700000Grade: 1.3Grade Unit: g/tView all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- gold
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- reserve
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:7770ee6d09c634801b39
- Deposit or zone
- Krakatoa Underground
Resource Data
- Category
- probable
- Tonnes
- 1700000
- Grade
- 1.3
- Grade Unit
- g/t
Prior Estimate
- Resource Date
- 2026-06-30
Metal Equivalent
- Metal Eq. Grade
- 301
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Krakatoa Underground Probable Ore Reserve of 1.7 Mt at 1.3 g/t gold provides a valuable byproduct credit, enhancing the overall polymetallic value of the reserve.
Positive factors
- Gold grade provides significant byproduct credit to project economics
- Probable Reserve classification provides high confidence
Evidence · text
“2.30.45.01.31471.7ProbableKrakatoa Underground”
Context: 1.7
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The resource is classified as Probable Reserve, indicating demonstrated economic viability based on Indicated Resources and modifying factors.
Evidence · text
“Probable”
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
probableKudz Ze Kayah Mine Project · zincTonnes: 1700000Grade: 5Grade Unit: %View all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- zinc
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- reserve
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:7770ee6d09c634801b39
- Deposit or zone
- Krakatoa Underground
Resource Data
- Category
- probable
- Tonnes
- 1700000
- Grade
- 5
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-06-30
Metal Equivalent
- Metal Eq. Grade
- 301
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Krakatoa Underground Probable Ore Reserve of 1.7 Mt at 5.0% zinc represents an economically viable component for underground mining, with zinc being a key economic driver.
Positive factors
- High zinc grade contributes significantly to project economics
- Probable Reserve classification provides high confidence
Evidence · text
“2.30.45.01.31471.7ProbableKrakatoa Underground”
Context: 1.7
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The resource is classified as Probable Reserve, indicating demonstrated economic viability based on Indicated Resources and modifying factors.
Evidence · text
“Probable”
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
probableKudz Ze Kayah Mine Project · copperTonnes: 1700000Grade: 0.4Grade Unit: %View all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- copper
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- reserve
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:7770ee6d09c634801b39
- Deposit or zone
- Krakatoa Underground
Resource Data
- Category
- probable
- Tonnes
- 1700000
- Grade
- 0.4
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-06-30
Metal Equivalent
- Metal Eq. Grade
- 301
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Krakatoa Underground Probable Ore Reserve of 1.7 Mt at 0.4% copper provides a byproduct credit, enhancing the overall polymetallic value of the reserve.
Positive factors
- Copper grade provides byproduct credit to project economics
- Probable Reserve classification provides high confidence
Evidence · text
“2.30.45.01.31471.7ProbableKrakatoa Underground”
Context: 1.7
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The resource is classified as Probable Reserve, indicating demonstrated economic viability based on Indicated Resources and modifying factors.
Evidence · text
“Probable”
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
probableKudz Ze Kayah Mine Project · leadTonnes: 1700000Grade: 2.3Grade Unit: %View all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- lead
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- reserve
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:7770ee6d09c634801b39
- Deposit or zone
- Krakatoa Underground
Resource Data
- Category
- probable
- Tonnes
- 1700000
- Grade
- 2.3
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-06-30
Metal Equivalent
- Metal Eq. Grade
- 301
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Krakatoa Underground Probable Ore Reserve of 1.7 Mt at 2.3% lead provides a valuable byproduct credit, enhancing the overall polymetallic value of the reserve.
Positive factors
- High lead grade provides significant byproduct credit to project economics
- Probable Reserve classification provides high confidence
Evidence · text
“2.30.45.01.31471.7ProbableKrakatoa Underground”
Context: 1.7
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The resource is classified as Probable Reserve, indicating demonstrated economic viability based on Indicated Resources and modifying factors.
Evidence · text
“Probable”
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
probableKudz Ze Kayah Mine Project · silverTonnes: 15700000Grade: 138Grade Unit: g/tView all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- silver
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- reserve
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:b884a329f7c634e1177d
- Deposit or zone
- Total
Resource Data
- Category
- probable
- Tonnes
- 15700000
- Grade
- 138
- Grade Unit
- g/t
Prior Estimate
- Resource Date
- 2026-06-30
Metal Equivalent
- Metal Eq. Grade
- 323
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Total Probable Ore Reserve of 15.7 Mt at 138 g/t silver (323 g/t AgEq) represents a substantial, high-confidence, and economically viable resource base for the project.
Positive factors
- Large total tonnage in the Probable Reserve category provides high confidence for economic extraction
- High silver grade contributes significantly to project economics
- Metal equivalent grade indicates strong overall polymetallic value
Evidence · text
“1.70.95.81.313815.7ProbableTotal”
Context: 15.7
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The resource is classified as Probable Reserve, indicating demonstrated economic viability based on Indicated Resources and modifying factors.
Evidence · text
“Probable”
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
probableKudz Ze Kayah Mine Project · goldTonnes: 15700000Grade: 1.3Grade Unit: g/tView all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- gold
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- reserve
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:b884a329f7c634e1177d
- Deposit or zone
- Total
Resource Data
- Category
- probable
- Tonnes
- 15700000
- Grade
- 1.3
- Grade Unit
- g/t
Prior Estimate
- Resource Date
- 2026-06-30
Metal Equivalent
- Metal Eq. Grade
- 323
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Total Probable Ore Reserve of 15.7 Mt at 1.3 g/t gold provides a valuable byproduct credit, enhancing the overall polymetallic value of the reserve.
Positive factors
- Gold grade provides significant byproduct credit to project economics
- Large tonnage in the Probable Reserve category provides high confidence
Evidence · text
“1.70.95.81.313815.7ProbableTotal”
Context: 15.7
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The resource is classified as Probable Reserve, indicating demonstrated economic viability based on Indicated Resources and modifying factors.
Evidence · text
“Probable”
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
probableKudz Ze Kayah Mine Project · zincTonnes: 15700000Grade: 5.8Grade Unit: %View all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- zinc
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- reserve
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:b884a329f7c634e1177d
- Deposit or zone
- Total
Resource Data
- Category
- probable
- Tonnes
- 15700000
- Grade
- 5.8
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-06-30
Metal Equivalent
- Metal Eq. Grade
- 323
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Total Probable Ore Reserve of 15.7 Mt at 5.8% zinc represents a substantial, high-confidence, and economically viable resource base for the project, with zinc being a key economic driver.
Positive factors
- High zinc grade contributes significantly to project economics
- Large tonnage in the Probable Reserve category provides high confidence
Evidence · text
“1.70.95.81.313815.7ProbableTotal”
Context: 15.7
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The resource is classified as Probable Reserve, indicating demonstrated economic viability based on Indicated Resources and modifying factors.
Evidence · text
“Probable”
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
probableKudz Ze Kayah Mine Project · copperTonnes: 15700000Grade: 0.9Grade Unit: %View all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- copper
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- reserve
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:b884a329f7c634e1177d
- Deposit or zone
- Total
Resource Data
- Category
- probable
- Tonnes
- 15700000
- Grade
- 0.9
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-06-30
Metal Equivalent
- Metal Eq. Grade
- 323
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Total Probable Ore Reserve of 15.7 Mt at 0.9% copper provides a valuable byproduct credit, enhancing the overall polymetallic value of the reserve.
Positive factors
- Copper grade provides significant byproduct credit to project economics
- Large tonnage in the Probable Reserve category provides high confidence
Evidence · text
“1.70.95.81.313815.7ProbableTotal”
Context: 15.7
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The resource is classified as Probable Reserve, indicating demonstrated economic viability based on Indicated Resources and modifying factors.
Evidence · text
“Probable”
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
probableKudz Ze Kayah Mine Project · leadTonnes: 15700000Grade: 1.7Grade Unit: %View all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- lead
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Resource scope
- Estimate type
- reserve
- Reporting standards
- ni_43_101, jorc
- QP Signed
- Yes
- Resource group id
- resource:b884a329f7c634e1177d
- Deposit or zone
- Total
Resource Data
- Category
- probable
- Tonnes
- 15700000
- Grade
- 1.7
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-06-30
Metal Equivalent
- Metal Eq. Grade
- 323
- Metal Eq. Unit
- g/t AgEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The Total Probable Ore Reserve of 15.7 Mt at 1.7% lead provides a valuable byproduct credit, enhancing the overall polymetallic value of the reserve.
Positive factors
- Lead grade provides significant byproduct credit to project economics
- Large tonnage in the Probable Reserve category provides high confidence
Evidence · text
“1.70.95.81.313815.7ProbableTotal”
Context: 15.7
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The resource is classified as Probable Reserve, indicating demonstrated economic viability based on Indicated Resources and modifying factors.
Evidence · text
“Probable”
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Metallurgical Results (5)
Fact 1Kudz Ze Kayah Mine Project · silverRecovery: 87 %View all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- silver
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Test Work
- Program Status
- detailed
- Processing Route
- mill route, flotation
Recovery
- Recovery
- 87 %
- Recovery Basis
- actual_test
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The reported 87% silver recovery is strong for a polymetallic flotation circuit and contributes positively to project economics, based on detailed metallurgical testwork.
Positive factors
- High recovery for silver in a polymetallic flotation circuit
- Recovery is based on actual test work at a detailed program status
Evidence · text
“Average Life-of-Mine processing recoveries are based on metallurgical testwork and are used in all metal equivalent calculations: 87% silver”
Tags used in scoring
Mill Routeneutral
Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
Why it applies: processing_route matches the mill_cil signal
Fact 2Kudz Ze Kayah Mine Project · zincRecovery: 87 %View all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- zinc
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Test Work
- Program Status
- detailed
- Processing Route
- mill route, flotation
Recovery
- Recovery
- 87 %
- Recovery Basis
- actual_test
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The reported 87% zinc recovery is strong for a polymetallic flotation circuit and contributes positively to project economics, based on detailed metallurgical testwork.
Positive factors
- High recovery for zinc in a polymetallic flotation circuit
- Recovery is based on actual test work at a detailed program status
Evidence · text
“Average Life-of-Mine processing recoveries are based on metallurgical testwork and are used in all metal equivalent calculations: 87% silver, 87% zinc”
Tags used in scoring
Mill Routeneutral
Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
Why it applies: processing_route matches the mill_cil signal
Fact 3Kudz Ze Kayah Mine Project · goldRecovery: 67 %View all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- gold
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Test Work
- Program Status
- detailed
- Processing Route
- mill route, flotation
Recovery
- Recovery
- 67 %
- Recovery Basis
- actual_test
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The reported 67% gold recovery is moderate for a mill route, suggesting potential for optimization or inherent challenges in gold recovery within the polymetallic ore.
Positive factors
- Recovery is based on actual test work at a detailed program status
Negative factors
- Gold recovery of 67% is moderate for a mill route, potentially indicating some metallurgical complexity for gold
Evidence · text
“Average Life-of-Mine processing recoveries are based on metallurgical testwork and are used in all metal equivalent calculations: 87% zinc, 67% gold”
Tags used in scoring
Mill Routeneutral
Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
Why it applies: processing_route matches the mill_cil signal
Low Recoverynegative
Recovery below the weak band for the commodity and processing route.
Why it applies: 67% is below the weak band (80%)
Fact 4Kudz Ze Kayah Mine Project · copperRecovery: 75 %View all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- copper
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Test Work
- Program Status
- detailed
- Processing Route
- mill route, flotation
Recovery
- Recovery
- 75 %
- Recovery Basis
- actual_test
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The reported 75% copper recovery is moderate for a mill route, suggesting potential for optimization or inherent challenges in copper recovery within the polymetallic ore.
Positive factors
- Recovery is based on actual test work at a detailed program status
Negative factors
- Copper recovery of 75% is moderate for a mill route, potentially indicating some metallurgical complexity for copper
Evidence · text
“Average Life-of-Mine processing recoveries are based on metallurgical testwork and are used in all metal equivalent calculations: 67% gold, 75% copper”
Tags used in scoring
Mill Routeneutral
Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
Why it applies: processing_route matches the mill_cil signal
Low Recoverynegative
Recovery below the weak band for the commodity and processing route.
Why it applies: 75% is below the weak band (80%)
Fact 5Kudz Ze Kayah Mine Project · leadRecovery: 73 %View all detailsHide details
Identity
- Project
- Kudz Ze Kayah Mine Project
- Commodity
- lead
- Region
- canada_yt
- Reported Region
- Yukon, Canada
- Ticker
- BMC
Test Work
- Program Status
- detailed
- Processing Route
- mill route, flotation
Recovery
- Recovery
- 73 %
- Recovery Basis
- actual_test
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-18T00:00:00.000Z
Reasoning: The reported 73% lead recovery is moderate for a mill route, suggesting potential for optimization or inherent challenges in lead recovery within the polymetallic ore.
Positive factors
- Recovery is based on actual test work at a detailed program status
Negative factors
- Lead recovery of 73% is moderate for a mill route, potentially indicating some metallurgical complexity for lead
Evidence · text
“Average Life-of-Mine processing recoveries are based on metallurgical testwork and are used in all metal equivalent calculations: 75% copper and 73% lead.”
Tags used in scoring
Mill Routeneutral
Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
Why it applies: processing_route matches the mill_cil signal
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.