BM1: Company Presentation - Canaccord Noosa Mining Conference
Original announcement by asx on
- Company
- Ballard Mining Limited
- Ticker
- BM1
- Exchange
- ASX
- Region
- Unavailable
- Primary commodity
- Unavailable
- Secondary commodities
- None reported
- Document categories
- Resource update, Permitting, Other
- Extracted
- 2026-11-08 22:18:18 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Ballard Mining Limited presented at the Canaccord Noosa Mining Conference, highlighting a 56% increase in its Mt Ida Gold Project Mineral Resource Estimate to 1.84 Moz at 2.8 g/t gold, as previously announced on September 23, 2026. The company emphasized its high-grade resource, advanced permitting for a 2 Mtpa process plant, and a granted 3.7 GL/yr water license, positioning it for standalone gold production. Ongoing resource drilling continues to intersect mineralization, with approximately 30,000 assay results pending and further infill drilling planned to convert Inferred Resources to Indicated.
Reasoning: The company presentation highlights substantial growth in gold resources and significant progress in permitting, de-risking the project towards standalone production, despite the MRE figures being previously released.
Positive factors
- Significant resource growth (56% increase in MRE to 1.84 Moz gold).
- High-grade resource (2.8 g/t Au average).
- Advanced permitting for a 2 Mtpa process plant and mining.
- Water license granted.
- Experienced management team.
- Clear path to standalone production.
Negative factors
- MRE numbers are not new (previously announced Sep 23, 2026).
- Assays for recent drilling are still pending, so no new drill results.
- Resource is predominantly Inferred (15.2 Mt Inferred vs 5.1 Mt Indicated).
Low confidence — this extraction should be reviewed alongside the original source.
Facts used in scoring: 30

Classification and evidence
Tonnage Growthpositive
Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.
Why it applies: The total MRE increased by 56% from 1,178 koz to 1,836 koz.
Evidence · text
“Total MRE 1,178 1,836 658 56 %”
Contained Metal Growthpositive
True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.
Why it applies: The total contained gold increased by 56% from 1,178 koz to 1,836 koz.
Evidence · text
“Total MRE 1,178 1,836 658 56 %”
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: The presentation states that reporting of ore reserves and mineral resources in Australia comply with the JORC Code.
Evidence · text
“It is a requirement of the ASX Listing Rules that the reporting of ore reserves and mineral resources in Australia comply with the JORC Code.”
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: The MRE was prepared with the consent of Competent Persons Mr Todd Hibberd, Mr Michael Andrew and Ms Susan Havlin.
Evidence · text
“the consent of the Competent Person Mr Todd Hibberd was obtained. Ballard confirms it is not aware of any new information or data that materially affects the information included in the 23 September 2026 announcement. Information in this Presentation that relates to the gold mineral resource estimate at the Mt Ida Project was reported by Ballard on the 23 September 2026, and for which the consent of the Competent Person Mr Michael Andrew and Ms Susan Havlin was obtained.”
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: A significant portion of the total resource (1,189 koz out of 1,836 koz) is in the Inferred category.
Evidence · table
“1,189”
Context: 15,238
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: The document presents an updated Mineral Resource Estimate for the Mt Ida Project.
Evidence · text
“MINERAL RESOURCE ESTIMATE – SEPTEMBER 2026”
Permittedpositive · Story-specific tag
No canonical definition is currently available.
Why it applies: The company has received approvals for mining leases, a mining proposal, and a process plant.
Evidence · text
“All Mineral Resources on Granted Mining Leases”
Water License Grantedpositive · Story-specific tag
No canonical definition is currently available.
Why it applies: A 3.7 GL/yr groundwater license has been granted to support operations.
Evidence · text
“3.7 GL/yr groundwater license”
Extracted facts
Stored fact records: 30. Some facts used in scoring do not have a stored record.
Resource Estimates (30)
indicatedMt Ida Gold Project · goldTonnes: 5138000Grade: 3.9Grade Unit: g/tContained Metal: 647Contained Unit: kozView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
- Resource group id
- resource:4073d0603f9d21071e32
- Deposit or zone
- Total
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 5138000
- Grade
- 3.9
- Grade Unit
- g/t
- Contained Metal
- 647
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2026-09-23
- Prior Contained Metal
- 1178
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: The indicated resource for the total project is substantial and high-grade, contributing significantly to the overall project scale, though the figures are not new.
Positive factors
- Significant indicated resource for gold.
- High grade for indicated category.
Negative factors
- Resource estimate previously announced.
Evidence · table
“647”
Context: 5,138
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Contained Metal Declinenegative
Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.
Why it applies: 647 against 1178 previously
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida Gold Project · goldTonnes: 15238000Grade: 2.4Grade Unit: g/tContained Metal: 1189Contained Unit: kozView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
- Resource group id
- resource:7be1c8a3bceaee8775f8
- Deposit or zone
- Total
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 15238000
- Grade
- 2.4
- Grade Unit
- g/t
- Contained Metal
- 1189
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2026-09-23
- Prior Contained Metal
- 1178
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: The inferred resource is a significant component of the total MRE, indicating future potential, but carries lower confidence due to its category.
Positive factors
- Large inferred resource adds to overall project scale.
Negative factors
- Inferred category has lower geological confidence.
- Resource estimate previously announced.
Evidence · table
“1,189”
Context: 15,238
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
TotalMt Ida Gold Project · goldTonnes: 20376000Grade: 2.8Grade Unit: g/tContained Metal: 1836Contained Unit: kozView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
- Resource group id
- resource:e43af5783e3280a3bb5c
- Deposit or zone
- Total
- Mining method
- combined
Resource Data
- Tonnes
- 20376000
- Grade
- 2.8
- Grade Unit
- g/t
- Contained Metal
- 1836
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2026-09-23
- Prior Contained Metal
- 1178
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: The total MRE represents a substantial gold endowment and a significant increase from the prior estimate, positioning the project for development.
Positive factors
- Significant total contained gold.
- Substantial increase in total MRE (56%).
Negative factors
- Resource estimate previously announced.
Evidence · table
“1,836”
Context: 20,376
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Contained Metal Growthpositive
True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.
Why it applies: 1836 against 1178 previously
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedMt Ida Gold Project · goldTonnes: 3530000Grade: 3.9Grade Unit: g/tContained Metal: 437Contained Unit: kozView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
- Resource group id
- resource:c4bec433577677a18844
- Deposit or zone
- Baldock
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 3530000
- Grade
- 3.9
- Grade Unit
- g/t
- Contained Metal
- 437
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-23
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: Baldock's indicated open pit resource is high-grade and forms a significant part of the project's foundation.
Positive factors
- High-grade indicated resource for open pit mining.
- Baldock is a cornerstone deposit.
Negative factors
- Resource estimate previously announced.
Evidence · table
“437”
Context: 3,530
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida Gold Project · goldTonnes: 1010000Grade: 2.5Grade Unit: g/tContained Metal: 79Contained Unit: kozView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
- Resource group id
- resource:14b080a80ca886e90bbb
- Deposit or zone
- Baldock
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 1010000
- Grade
- 2.5
- Grade Unit
- g/t
- Contained Metal
- 79
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-23
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: The inferred open pit resource at Baldock contributes to the overall tonnage but with lower confidence and moderate grade.
Positive factors
- Adds to the overall open pit resource at Baldock.
Negative factors
- Inferred category has lower geological confidence.
- Grade is moderate for open pit.
- Resource estimate previously announced.
Evidence · table
“79”
Context: 1,010
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
BaldockMt Ida Gold Project · goldTonnes: 4540000Grade: 3.5Grade Unit: g/tContained Metal: 516Contained Unit: kozView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
- Resource group id
- resource:16a7f3529e7a38f26121
- Deposit or zone
- Baldock
- Mining method
- combined
Resource Data
- Tonnes
- 4540000
- Grade
- 3.5
- Grade Unit
- g/t
- Contained Metal
- 516
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2026-09-23
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: The combined open pit resource at Baldock is substantial and high-grade, forming a key part of the project's development.
Positive factors
- Significant total open pit resource at Baldock.
- High average grade for open pit.
Negative factors
- Resource estimate previously announced.
Evidence · table
“516”
Context: 4,540
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida Gold Project · goldTonnes: 940000Grade: 1.6Grade Unit: g/tContained Metal: 48Contained Unit: kozView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
- Resource group id
- resource:93db0c30c34d41f6740e
- Deposit or zone
- Kestrel
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 940000
- Grade
- 1.6
- Grade Unit
- g/t
- Contained Metal
- 48
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-23
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: Kestrel contributes to the overall inferred open pit resource, but with moderate grade and lower confidence.
Positive factors
- Adds to regional open pit potential.
Negative factors
- Inferred category has lower geological confidence.
- Grade is moderate for open pit.
- Resource estimate previously announced.
Evidence · table
“48”
Context: 940
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida Gold Project · goldTonnes: 2363000Grade: 1.6Grade Unit: g/tContained Metal: 124Contained Unit: kozView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
- Resource group id
- resource:9075d6a476e8cc546d8f
- Deposit or zone
- Golden Vale
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 2363000
- Grade
- 1.6
- Grade Unit
- g/t
- Contained Metal
- 124
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-23
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: Golden Vale contributes a notable inferred open pit resource, but with moderate grade and lower confidence.
Positive factors
- Adds to regional open pit potential.
Negative factors
- Inferred category has lower geological confidence.
- Grade is moderate for open pit.
- Resource estimate previously announced.
Evidence · table
“124”
Context: 2,363
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida Gold Project · goldTonnes: 711000Grade: 1.3Grade Unit: g/tContained Metal: 30Contained Unit: kozView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
- Resource group id
- resource:b5e01fe296965588d634
- Deposit or zone
- Bombay
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 711000
- Grade
- 1.3
- Grade Unit
- g/t
- Contained Metal
- 30
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-23
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: Bombay adds a small inferred open pit resource with a weak grade, contributing marginally to the overall project.
Positive factors
- Contributes to regional open pit resource.
Negative factors
- Inferred category has lower geological confidence.
- Grade is weak for open pit.
- Resource estimate previously announced.
Evidence · table
“30”
Context: 711
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida Gold Project · goldTonnes: 1638000Grade: 2.6Grade Unit: g/tContained Metal: 138Contained Unit: kozView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
- Resource group id
- resource:a59d87dfb619dd9b4094
- Deposit or zone
- West Knell
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 1638000
- Grade
- 2.6
- Grade Unit
- g/t
- Contained Metal
- 138
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-23
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: West Knell provides a substantial inferred open pit resource with a moderate grade, contributing to the project's regional scale.
Positive factors
- Adds to regional open pit potential.
Negative factors
- Inferred category has lower geological confidence.
- Grade is moderate for open pit.
- Resource estimate previously announced.
Evidence · table
“138”
Context: 1,638
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida Gold Project · goldTonnes: 496000Grade: 1.8Grade Unit: g/tContained Metal: 29Contained Unit: kozView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
- Resource group id
- resource:b3578ad25be5c172aa83
- Deposit or zone
- Jupiter
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 496000
- Grade
- 1.8
- Grade Unit
- g/t
- Contained Metal
- 29
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-23
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: Jupiter adds a small inferred open pit resource with a moderate grade, contributing marginally to the overall project.
Positive factors
- Contributes to regional open pit resource.
Negative factors
- Inferred category has lower geological confidence.
- Grade is moderate for open pit.
- Resource estimate previously announced.
Evidence · table
“29”
Context: 496
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida Gold Project · goldTonnes: 501000Grade: 1.5Grade Unit: g/tContained Metal: 25Contained Unit: kozView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
- Resource group id
- resource:c61467764601a845db38
- Deposit or zone
- Neptune
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 501000
- Grade
- 1.5
- Grade Unit
- g/t
- Contained Metal
- 25
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-23
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: Neptune adds a small inferred open pit resource with a weak grade, contributing marginally to the overall project.
Positive factors
- Contributes to regional open pit resource.
Negative factors
- Inferred category has lower geological confidence.
- Grade is weak for open pit.
- Resource estimate previously announced.
Evidence · table
“25”
Context: 501
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida Gold Project · goldTonnes: 289000Grade: 2.9Grade Unit: g/tContained Metal: 27Contained Unit: kozView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
- Resource group id
- resource:6b3ad72dd4d536743919
- Deposit or zone
- Pluto
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 289000
- Grade
- 2.9
- Grade Unit
- g/t
- Contained Metal
- 27
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-23
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: Pluto adds a small inferred open pit resource with a moderate grade, contributing marginally to the overall project.
Positive factors
- Contributes to regional open pit resource.
Negative factors
- Inferred category has lower geological confidence.
- Grade is moderate for open pit.
- Resource estimate previously announced.
Evidence · table
“27”
Context: 289
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida Gold Project · goldTonnes: 412000Grade: 1.6Grade Unit: g/tContained Metal: 21Contained Unit: kozView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
- Resource group id
- resource:a50b437a7f90ad39659c
- Deposit or zone
- Astro - Quasar
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 412000
- Grade
- 1.6
- Grade Unit
- g/t
- Contained Metal
- 21
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-23
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: Astro - Quasar adds a small inferred open pit resource with a moderate grade, contributing marginally to the overall project.
Positive factors
- Contributes to regional open pit resource.
Negative factors
- Inferred category has lower geological confidence.
- Grade is moderate for open pit.
- Resource estimate previously announced.
Evidence · table
“21”
Context: 412
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida Gold Project · goldTonnes: 29000Grade: 2.1Grade Unit: g/tContained Metal: 2Contained Unit: kozView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
- Resource group id
- resource:9e0d64cb96a1e9fa734f
- Deposit or zone
- Lunar
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 29000
- Grade
- 2.1
- Grade Unit
- g/t
- Contained Metal
- 2
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-23
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: Lunar adds a very small inferred open pit resource with a moderate grade, contributing marginally to the overall project.
Positive factors
- Contributes to regional open pit resource.
Negative factors
- Inferred category has lower geological confidence.
- Grade is moderate for open pit.
- Resource estimate previously announced.
Evidence · table
“2”
Context: 29
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida Gold Project · goldTonnes: 46000Grade: 1.3Grade Unit: g/tContained Metal: 2Contained Unit: kozView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
- Resource group id
- resource:6cd86a4f5c69357680a0
- Deposit or zone
- Saturn
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 46000
- Grade
- 1.3
- Grade Unit
- g/t
- Contained Metal
- 2
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-23
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: Saturn adds a very small inferred open pit resource with a weak grade, contributing marginally to the overall project.
Positive factors
- Contributes to regional open pit resource.
Negative factors
- Inferred category has lower geological confidence.
- Grade is weak for open pit.
- Resource estimate previously announced.
Evidence · table
“2”
Context: 46
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida Gold Project · goldTonnes: 500000Grade: 0.5Grade Unit: g/tContained Metal: 8Contained Unit: kozView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
- Resource group id
- resource:7039b4a7b90fe2d63018
- Deposit or zone
- Tailings
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 500000
- Grade
- 0.5
- Grade Unit
- g/t
- Contained Metal
- 8
- Contained Unit
- koz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-23
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: The tailings resource provides a small, low-grade inferred contribution to the overall project.
Positive factors
- Adds to overall resource base from existing material.
Negative factors
- Inferred category has lower geological confidence.
- Grade is weak for open pit.
- Resource estimate previously announced.
Evidence · table
“8”
Context: 500
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedMt Ida Gold Project · goldTonnes: 1608000Grade: 4.1Grade Unit: g/tContained Metal: 210Contained Unit: kozView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
- Resource group id
- resource:2bd1be53765a1873e793
- Deposit or zone
- Baldock
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 1608000
- Grade
- 4.1
- Grade Unit
- g/t
- Contained Metal
- 210
- Contained Unit
- koz
- Cutoff Grade
- 1.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-23
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: Baldock's indicated underground resource is substantial and contributes to the project's long-term potential.
Positive factors
- Significant indicated resource for underground mining.
- Moderate grade for underground.
Negative factors
- Resource estimate previously announced.
Evidence · table
“210”
Context: 1,608
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida Gold Project · goldTonnes: 6050000Grade: 3.3Grade Unit: g/tContained Metal: 637Contained Unit: kozView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
- Resource group id
- resource:e944e88fb462061c20ea
- Deposit or zone
- Baldock
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 6050000
- Grade
- 3.3
- Grade Unit
- g/t
- Contained Metal
- 637
- Contained Unit
- koz
- Cutoff Grade
- 1.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-23
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: The inferred underground resource at Baldock is substantial, indicating significant future potential, but with lower confidence.
Positive factors
- Large inferred resource for underground mining.
Negative factors
- Inferred category has lower geological confidence.
- Grade is moderate for underground.
- Resource estimate previously announced.
Evidence · table
“637”
Context: 6,050
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
BaldockMt Ida Gold Project · goldTonnes: 7658000Grade: 3.4Grade Unit: g/tContained Metal: 847Contained Unit: kozView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
- Resource group id
- resource:384111abfd1b4d5c48e5
- Deposit or zone
- Baldock
- Mining method
- combined
Resource Data
- Tonnes
- 7658000
- Grade
- 3.4
- Grade Unit
- g/t
- Contained Metal
- 847
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2026-09-23
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: The combined underground resource at Baldock is substantial, providing a strong foundation for future development.
Positive factors
- Significant total underground resource at Baldock.
- Moderate average grade for underground.
Negative factors
- Resource estimate previously announced.
Evidence · table
“847”
Context: 7,658
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida Gold Project · goldTonnes: 80000Grade: 1.9Grade Unit: g/tContained Metal: 5Contained Unit: kozView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
- Resource group id
- resource:2b792a1115c4094907b1
- Deposit or zone
- Kestrel
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 80000
- Grade
- 1.9
- Grade Unit
- g/t
- Contained Metal
- 5
- Contained Unit
- koz
- Cutoff Grade
- 1.3
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-23
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: Kestrel adds a small inferred underground resource with a weak grade, contributing marginally to the overall project.
Positive factors
- Contributes to regional underground resource.
Negative factors
- Inferred category has lower geological confidence.
- Grade is weak for underground.
- Resource estimate previously announced.
Evidence · table
“5”
Context: 80
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida Gold Project · goldTonnes: 30000Grade: 3.1Grade Unit: g/tContained Metal: 3Contained Unit: kozView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
- Resource group id
- resource:0c0e87fdcca60b6c23ea
- Deposit or zone
- Bombay
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 30000
- Grade
- 3.1
- Grade Unit
- g/t
- Contained Metal
- 3
- Contained Unit
- koz
- Cutoff Grade
- 1.3
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-23
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: Bombay adds a very small inferred underground resource with a moderate grade, contributing marginally to the overall project.
Positive factors
- Contributes to regional underground resource.
Negative factors
- Inferred category has lower geological confidence.
- Grade is moderate for underground.
- Resource estimate previously announced.
Evidence · table
“3”
Context: 30
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida Gold Project · goldTonnes: 121000Grade: 2.3Grade Unit: g/tContained Metal: 9Contained Unit: kozView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
- Resource group id
- resource:c0a0b316ef1315e22eb5
- Deposit or zone
- West Knell
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 121000
- Grade
- 2.3
- Grade Unit
- g/t
- Contained Metal
- 9
- Contained Unit
- koz
- Cutoff Grade
- 1.3
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-23
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: West Knell adds a small inferred underground resource with a weak grade, contributing marginally to the overall project.
Positive factors
- Contributes to regional underground resource.
Negative factors
- Inferred category has lower geological confidence.
- Grade is weak for underground.
- Resource estimate previously announced.
Evidence · table
“9”
Context: 121
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredMt Ida Gold Project · goldTonnes: 23000Grade: 2.9Grade Unit: g/tContained Metal: 2Contained Unit: kozView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
- Resource group id
- resource:7ddc76a7a607c2debbd1
- Deposit or zone
- Neptune
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 23000
- Grade
- 2.9
- Grade Unit
- g/t
- Contained Metal
- 2
- Contained Unit
- koz
- Cutoff Grade
- 1.3
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-23
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: Neptune adds a very small inferred underground resource with a moderate grade, contributing marginally to the overall project.
Positive factors
- Contributes to regional underground resource.
Negative factors
- Inferred category has lower geological confidence.
- Grade is moderate for underground.
- Resource estimate previously announced.
Evidence · table
“2”
Context: 23
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Fact 25Mt Ida Gold Project · goldView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Reporting standards
- ni_43_101, jorc
- Resource group id
- resource:65fb03fa26634c720bdd
- Mining method
- combined
Prior Estimate
- Resource Date
- 2026-11-08
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: The confirmation that all mineral resources are on granted mining leases is a significant de-risking factor for the project.
Positive factors
- All mineral resources are on granted mining leases, de-risking project development.
Evidence · text
“All Mineral Resources on Granted Mining Leases”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Fact 26Mt Ida Gold Project · goldView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Reporting standards
- ni_43_101, jorc
- Resource group id
- resource:65fb03fa26634c720bdd
- Mining method
- combined
Prior Estimate
- Resource Date
- 2026-11-08
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: Having approved mining and closure plans for both open pit and underground operations at Baldock significantly de-risks the project's development path.
Positive factors
- Approved mining proposal and mine closure plan for both open pit and underground mining at Baldock, facilitating future operations.
Evidence · text
“Approved Mining Proposal and Mine Closure Plan for open pit and underground mining at Baldock”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Fact 27Mt Ida Gold Project · goldView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Reporting standards
- ni_43_101, jorc
- Resource group id
- resource:65fb03fa26634c720bdd
- Mining method
- combined
Prior Estimate
- Resource Date
- 2026-11-08
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: The approval for the process plant and tailings facility is a critical step towards construction and production, significantly de-risking the project.
Positive factors
- Works Approval granted for a 2.0 Mtpa Process Plant and tailings storage facility, enabling construction.
Evidence · text
“Works Approval granted for 2.0 Mtpa Process Plant and tailings storage facility”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Fact 28Mt Ida Gold Project · goldView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Reporting standards
- ni_43_101, jorc
- Resource group id
- resource:65fb03fa26634c720bdd
- Mining method
- combined
Prior Estimate
- Resource Date
- 2026-11-08
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: Securing a substantial groundwater license is crucial for the operational viability of the project.
Positive factors
- A 3.7 GL/yr groundwater license is granted, securing water supply for operations.
Evidence · text
“3.7 GL/yr groundwater license”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Fact 29Mt Ida Gold Project · goldView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Reporting standards
- ni_43_101, jorc
- Resource group id
- resource:65fb03fa26634c720bdd
- Mining method
- combined
Prior Estimate
- Resource Date
- 2026-11-08
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: The installation of production bores demonstrates progress in establishing necessary infrastructure for water supply.
Positive factors
- Eight production bores installed to support water extraction requirements.
Evidence · text
“Eight production bores installed”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Fact 30Mt Ida Gold Project · goldView all detailsHide details
Identity
- Project
- Mt Ida Gold Project
- Commodity
- gold
- Region
- wa eastern goldfields
- Reported Region
- WA Eastern Goldfields
- Ticker
- BM1
Resource scope
- Reporting standards
- ni_43_101, jorc
- Resource group id
- resource:65fb03fa26634c720bdd
- Mining method
- combined
Prior Estimate
- Resource Date
- 2026-11-08
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: Completion of the road diversion is a minor but necessary infrastructure milestone for the project.
Positive factors
- Mt Ida public road diversion complete, indicating progress on site logistics.
Evidence · text
“Mt Ida public road diversion complete”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.