Summary

Ballard Mining Limited presented at the Canaccord Noosa Mining Conference, highlighting a 56% increase in its Mt Ida Gold Project Mineral Resource Estimate to 1.84 Moz at 2.8 g/t gold, as previously announced on September 23, 2026. The company emphasized its high-grade resource, advanced permitting for a 2 Mtpa process plant, and a granted 3.7 GL/yr water license, positioning it for standalone gold production. Ongoing resource drilling continues to intersect mineralization, with approximately 30,000 assay results pending and further infill drilling planned to convert Inferred Resources to Indicated.

Reasoning: The company presentation highlights substantial growth in gold resources and significant progress in permitting, de-risking the project towards standalone production, despite the MRE figures being previously released.

Positive factors

  • Significant resource growth (56% increase in MRE to 1.84 Moz gold).
  • High-grade resource (2.8 g/t Au average).
  • Advanced permitting for a 2 Mtpa process plant and mining.
  • Water license granted.
  • Experienced management team.
  • Clear path to standalone production.

Negative factors

  • MRE numbers are not new (previously announced Sep 23, 2026).
  • Assays for recent drilling are still pending, so no new drill results.
  • Resource is predominantly Inferred (15.2 Mt Inferred vs 5.1 Mt Indicated).

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 30

Atlas analysis — Ballard Mining Limited: BM1: Company Presentation - Canaccord Noosa Mining Conference. indicated 5138000 tonnes; inferred 15238000 tonnes;  20376000 tonnes

Classification and evidence

Tonnage Growthpositive

Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.

Why it applies: The total MRE increased by 56% from 1,178 koz to 1,836 koz.

Evidence · text

“Total MRE 1,178 1,836 658 56 %”

Contained Metal Growthpositive

True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: The total contained gold increased by 56% from 1,178 koz to 1,836 koz.

Evidence · text

“Total MRE 1,178 1,836 658 56 %”

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The presentation states that reporting of ore reserves and mineral resources in Australia comply with the JORC Code.

Evidence · text

“It is a requirement of the ASX Listing Rules that the reporting of ore reserves and mineral resources in Australia comply with the JORC Code.”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: The MRE was prepared with the consent of Competent Persons Mr Todd Hibberd, Mr Michael Andrew and Ms Susan Havlin.

Evidence · text

“the consent of the Competent Person Mr Todd Hibberd was obtained. Ballard confirms it is not aware of any new information or data that materially affects the information included in the 23 September 2026 announcement. Information in this Presentation that relates to the gold mineral resource estimate at the Mt Ida Project was reported by Ballard on the 23 September 2026, and for which the consent of the Competent Person Mr Michael Andrew and Ms Susan Havlin was obtained.”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: A significant portion of the total resource (1,189 koz out of 1,836 koz) is in the Inferred category.

Evidence · table

“1,189”

Context: 15,238

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The document presents an updated Mineral Resource Estimate for the Mt Ida Project.

Evidence · text

“MINERAL RESOURCE ESTIMATE – SEPTEMBER 2026”

Permittedpositive · Story-specific tag

No canonical definition is currently available.

Why it applies: The company has received approvals for mining leases, a mining proposal, and a process plant.

Evidence · text

“All Mineral Resources on Granted Mining Leases”

Water License Grantedpositive · Story-specific tag

No canonical definition is currently available.

Why it applies: A 3.7 GL/yr groundwater license has been granted to support operations.

Evidence · text

“3.7 GL/yr groundwater license”

Extracted facts

Stored fact records: 30. Some facts used in scoring do not have a stored record.

Resource Estimates (30)

indicatedMt Ida Gold Project · goldTonnes: 5138000Grade: 3.9Grade Unit: g/tContained Metal: 647Contained Unit: kozView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
Resource group id
resource:4073d0603f9d21071e32
Deposit or zone
Total
Mining method
combined

Resource Data

Category
indicated
Tonnes
5138000
Grade
3.9
Grade Unit
g/t
Contained Metal
647
Contained Unit
koz

Prior Estimate

Resource Date
2026-09-23
Prior Contained Metal
1178

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The indicated resource for the total project is substantial and high-grade, contributing significantly to the overall project scale, though the figures are not new.

Positive factors

  • Significant indicated resource for gold.
  • High grade for indicated category.

Negative factors

  • Resource estimate previously announced.

Evidence · table

“647”

Context: 5,138

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Contained Metal Declinenegative

Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.

Why it applies: 647 against 1178 previously

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida Gold Project · goldTonnes: 15238000Grade: 2.4Grade Unit: g/tContained Metal: 1189Contained Unit: kozView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
Resource group id
resource:7be1c8a3bceaee8775f8
Deposit or zone
Total
Mining method
combined

Resource Data

Category
inferred
Tonnes
15238000
Grade
2.4
Grade Unit
g/t
Contained Metal
1189
Contained Unit
koz

Prior Estimate

Resource Date
2026-09-23
Prior Contained Metal
1178

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The inferred resource is a significant component of the total MRE, indicating future potential, but carries lower confidence due to its category.

Positive factors

  • Large inferred resource adds to overall project scale.

Negative factors

  • Inferred category has lower geological confidence.
  • Resource estimate previously announced.

Evidence · table

“1,189”

Context: 15,238

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

TotalMt Ida Gold Project · goldTonnes: 20376000Grade: 2.8Grade Unit: g/tContained Metal: 1836Contained Unit: kozView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
Resource group id
resource:e43af5783e3280a3bb5c
Deposit or zone
Total
Mining method
combined

Resource Data

Tonnes
20376000
Grade
2.8
Grade Unit
g/t
Contained Metal
1836
Contained Unit
koz

Prior Estimate

Resource Date
2026-09-23
Prior Contained Metal
1178

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The total MRE represents a substantial gold endowment and a significant increase from the prior estimate, positioning the project for development.

Positive factors

  • Significant total contained gold.
  • Substantial increase in total MRE (56%).

Negative factors

  • Resource estimate previously announced.

Evidence · table

“1,836”

Context: 20,376

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Contained Metal Growthpositive

True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: 1836 against 1178 previously

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedMt Ida Gold Project · goldTonnes: 3530000Grade: 3.9Grade Unit: g/tContained Metal: 437Contained Unit: kozView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
Resource group id
resource:c4bec433577677a18844
Deposit or zone
Baldock
Mining method
combined

Resource Data

Category
indicated
Tonnes
3530000
Grade
3.9
Grade Unit
g/t
Contained Metal
437
Contained Unit
koz
Cutoff Grade
0.5
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-09-23

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: Baldock's indicated open pit resource is high-grade and forms a significant part of the project's foundation.

Positive factors

  • High-grade indicated resource for open pit mining.
  • Baldock is a cornerstone deposit.

Negative factors

  • Resource estimate previously announced.

Evidence · table

“437”

Context: 3,530

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida Gold Project · goldTonnes: 1010000Grade: 2.5Grade Unit: g/tContained Metal: 79Contained Unit: kozView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
Resource group id
resource:14b080a80ca886e90bbb
Deposit or zone
Baldock
Mining method
combined

Resource Data

Category
inferred
Tonnes
1010000
Grade
2.5
Grade Unit
g/t
Contained Metal
79
Contained Unit
koz
Cutoff Grade
0.5
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-09-23

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The inferred open pit resource at Baldock contributes to the overall tonnage but with lower confidence and moderate grade.

Positive factors

  • Adds to the overall open pit resource at Baldock.

Negative factors

  • Inferred category has lower geological confidence.
  • Grade is moderate for open pit.
  • Resource estimate previously announced.

Evidence · table

“79”

Context: 1,010

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

BaldockMt Ida Gold Project · goldTonnes: 4540000Grade: 3.5Grade Unit: g/tContained Metal: 516Contained Unit: kozView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
Resource group id
resource:16a7f3529e7a38f26121
Deposit or zone
Baldock
Mining method
combined

Resource Data

Tonnes
4540000
Grade
3.5
Grade Unit
g/t
Contained Metal
516
Contained Unit
koz

Prior Estimate

Resource Date
2026-09-23

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The combined open pit resource at Baldock is substantial and high-grade, forming a key part of the project's development.

Positive factors

  • Significant total open pit resource at Baldock.
  • High average grade for open pit.

Negative factors

  • Resource estimate previously announced.

Evidence · table

“516”

Context: 4,540

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida Gold Project · goldTonnes: 940000Grade: 1.6Grade Unit: g/tContained Metal: 48Contained Unit: kozView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
Resource group id
resource:93db0c30c34d41f6740e
Deposit or zone
Kestrel
Mining method
combined

Resource Data

Category
inferred
Tonnes
940000
Grade
1.6
Grade Unit
g/t
Contained Metal
48
Contained Unit
koz
Cutoff Grade
0.5
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-09-23

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: Kestrel contributes to the overall inferred open pit resource, but with moderate grade and lower confidence.

Positive factors

  • Adds to regional open pit potential.

Negative factors

  • Inferred category has lower geological confidence.
  • Grade is moderate for open pit.
  • Resource estimate previously announced.

Evidence · table

“48”

Context: 940

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida Gold Project · goldTonnes: 2363000Grade: 1.6Grade Unit: g/tContained Metal: 124Contained Unit: kozView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
Resource group id
resource:9075d6a476e8cc546d8f
Deposit or zone
Golden Vale
Mining method
combined

Resource Data

Category
inferred
Tonnes
2363000
Grade
1.6
Grade Unit
g/t
Contained Metal
124
Contained Unit
koz
Cutoff Grade
0.5
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-09-23

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: Golden Vale contributes a notable inferred open pit resource, but with moderate grade and lower confidence.

Positive factors

  • Adds to regional open pit potential.

Negative factors

  • Inferred category has lower geological confidence.
  • Grade is moderate for open pit.
  • Resource estimate previously announced.

Evidence · table

“124”

Context: 2,363

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida Gold Project · goldTonnes: 711000Grade: 1.3Grade Unit: g/tContained Metal: 30Contained Unit: kozView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
Resource group id
resource:b5e01fe296965588d634
Deposit or zone
Bombay
Mining method
combined

Resource Data

Category
inferred
Tonnes
711000
Grade
1.3
Grade Unit
g/t
Contained Metal
30
Contained Unit
koz
Cutoff Grade
0.5
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-09-23

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: Bombay adds a small inferred open pit resource with a weak grade, contributing marginally to the overall project.

Positive factors

  • Contributes to regional open pit resource.

Negative factors

  • Inferred category has lower geological confidence.
  • Grade is weak for open pit.
  • Resource estimate previously announced.

Evidence · table

“30”

Context: 711

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida Gold Project · goldTonnes: 1638000Grade: 2.6Grade Unit: g/tContained Metal: 138Contained Unit: kozView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
Resource group id
resource:a59d87dfb619dd9b4094
Deposit or zone
West Knell
Mining method
combined

Resource Data

Category
inferred
Tonnes
1638000
Grade
2.6
Grade Unit
g/t
Contained Metal
138
Contained Unit
koz
Cutoff Grade
0.5
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-09-23

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: West Knell provides a substantial inferred open pit resource with a moderate grade, contributing to the project's regional scale.

Positive factors

  • Adds to regional open pit potential.

Negative factors

  • Inferred category has lower geological confidence.
  • Grade is moderate for open pit.
  • Resource estimate previously announced.

Evidence · table

“138”

Context: 1,638

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida Gold Project · goldTonnes: 496000Grade: 1.8Grade Unit: g/tContained Metal: 29Contained Unit: kozView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
Resource group id
resource:b3578ad25be5c172aa83
Deposit or zone
Jupiter
Mining method
combined

Resource Data

Category
inferred
Tonnes
496000
Grade
1.8
Grade Unit
g/t
Contained Metal
29
Contained Unit
koz
Cutoff Grade
0.5
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-09-23

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: Jupiter adds a small inferred open pit resource with a moderate grade, contributing marginally to the overall project.

Positive factors

  • Contributes to regional open pit resource.

Negative factors

  • Inferred category has lower geological confidence.
  • Grade is moderate for open pit.
  • Resource estimate previously announced.

Evidence · table

“29”

Context: 496

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida Gold Project · goldTonnes: 501000Grade: 1.5Grade Unit: g/tContained Metal: 25Contained Unit: kozView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
Resource group id
resource:c61467764601a845db38
Deposit or zone
Neptune
Mining method
combined

Resource Data

Category
inferred
Tonnes
501000
Grade
1.5
Grade Unit
g/t
Contained Metal
25
Contained Unit
koz
Cutoff Grade
0.5
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-09-23

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: Neptune adds a small inferred open pit resource with a weak grade, contributing marginally to the overall project.

Positive factors

  • Contributes to regional open pit resource.

Negative factors

  • Inferred category has lower geological confidence.
  • Grade is weak for open pit.
  • Resource estimate previously announced.

Evidence · table

“25”

Context: 501

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida Gold Project · goldTonnes: 289000Grade: 2.9Grade Unit: g/tContained Metal: 27Contained Unit: kozView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
Resource group id
resource:6b3ad72dd4d536743919
Deposit or zone
Pluto
Mining method
combined

Resource Data

Category
inferred
Tonnes
289000
Grade
2.9
Grade Unit
g/t
Contained Metal
27
Contained Unit
koz
Cutoff Grade
0.5
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-09-23

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: Pluto adds a small inferred open pit resource with a moderate grade, contributing marginally to the overall project.

Positive factors

  • Contributes to regional open pit resource.

Negative factors

  • Inferred category has lower geological confidence.
  • Grade is moderate for open pit.
  • Resource estimate previously announced.

Evidence · table

“27”

Context: 289

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida Gold Project · goldTonnes: 412000Grade: 1.6Grade Unit: g/tContained Metal: 21Contained Unit: kozView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
Resource group id
resource:a50b437a7f90ad39659c
Deposit or zone
Astro - Quasar
Mining method
combined

Resource Data

Category
inferred
Tonnes
412000
Grade
1.6
Grade Unit
g/t
Contained Metal
21
Contained Unit
koz
Cutoff Grade
0.5
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-09-23

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: Astro - Quasar adds a small inferred open pit resource with a moderate grade, contributing marginally to the overall project.

Positive factors

  • Contributes to regional open pit resource.

Negative factors

  • Inferred category has lower geological confidence.
  • Grade is moderate for open pit.
  • Resource estimate previously announced.

Evidence · table

“21”

Context: 412

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida Gold Project · goldTonnes: 29000Grade: 2.1Grade Unit: g/tContained Metal: 2Contained Unit: kozView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
Resource group id
resource:9e0d64cb96a1e9fa734f
Deposit or zone
Lunar
Mining method
combined

Resource Data

Category
inferred
Tonnes
29000
Grade
2.1
Grade Unit
g/t
Contained Metal
2
Contained Unit
koz
Cutoff Grade
0.5
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-09-23

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: Lunar adds a very small inferred open pit resource with a moderate grade, contributing marginally to the overall project.

Positive factors

  • Contributes to regional open pit resource.

Negative factors

  • Inferred category has lower geological confidence.
  • Grade is moderate for open pit.
  • Resource estimate previously announced.

Evidence · table

“2”

Context: 29

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida Gold Project · goldTonnes: 46000Grade: 1.3Grade Unit: g/tContained Metal: 2Contained Unit: kozView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
Resource group id
resource:6cd86a4f5c69357680a0
Deposit or zone
Saturn
Mining method
combined

Resource Data

Category
inferred
Tonnes
46000
Grade
1.3
Grade Unit
g/t
Contained Metal
2
Contained Unit
koz
Cutoff Grade
0.5
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-09-23

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: Saturn adds a very small inferred open pit resource with a weak grade, contributing marginally to the overall project.

Positive factors

  • Contributes to regional open pit resource.

Negative factors

  • Inferred category has lower geological confidence.
  • Grade is weak for open pit.
  • Resource estimate previously announced.

Evidence · table

“2”

Context: 46

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida Gold Project · goldTonnes: 500000Grade: 0.5Grade Unit: g/tContained Metal: 8Contained Unit: kozView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
Resource group id
resource:7039b4a7b90fe2d63018
Deposit or zone
Tailings
Mining method
combined

Resource Data

Category
inferred
Tonnes
500000
Grade
0.5
Grade Unit
g/t
Contained Metal
8
Contained Unit
koz
Cutoff Grade
0.5
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-09-23

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The tailings resource provides a small, low-grade inferred contribution to the overall project.

Positive factors

  • Adds to overall resource base from existing material.

Negative factors

  • Inferred category has lower geological confidence.
  • Grade is weak for open pit.
  • Resource estimate previously announced.

Evidence · table

“8”

Context: 500

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedMt Ida Gold Project · goldTonnes: 1608000Grade: 4.1Grade Unit: g/tContained Metal: 210Contained Unit: kozView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
Resource group id
resource:2bd1be53765a1873e793
Deposit or zone
Baldock
Mining method
combined

Resource Data

Category
indicated
Tonnes
1608000
Grade
4.1
Grade Unit
g/t
Contained Metal
210
Contained Unit
koz
Cutoff Grade
1.5
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-09-23

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: Baldock's indicated underground resource is substantial and contributes to the project's long-term potential.

Positive factors

  • Significant indicated resource for underground mining.
  • Moderate grade for underground.

Negative factors

  • Resource estimate previously announced.

Evidence · table

“210”

Context: 1,608

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida Gold Project · goldTonnes: 6050000Grade: 3.3Grade Unit: g/tContained Metal: 637Contained Unit: kozView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
Resource group id
resource:e944e88fb462061c20ea
Deposit or zone
Baldock
Mining method
combined

Resource Data

Category
inferred
Tonnes
6050000
Grade
3.3
Grade Unit
g/t
Contained Metal
637
Contained Unit
koz
Cutoff Grade
1.5
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-09-23

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The inferred underground resource at Baldock is substantial, indicating significant future potential, but with lower confidence.

Positive factors

  • Large inferred resource for underground mining.

Negative factors

  • Inferred category has lower geological confidence.
  • Grade is moderate for underground.
  • Resource estimate previously announced.

Evidence · table

“637”

Context: 6,050

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

BaldockMt Ida Gold Project · goldTonnes: 7658000Grade: 3.4Grade Unit: g/tContained Metal: 847Contained Unit: kozView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
Resource group id
resource:384111abfd1b4d5c48e5
Deposit or zone
Baldock
Mining method
combined

Resource Data

Tonnes
7658000
Grade
3.4
Grade Unit
g/t
Contained Metal
847
Contained Unit
koz

Prior Estimate

Resource Date
2026-09-23

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The combined underground resource at Baldock is substantial, providing a strong foundation for future development.

Positive factors

  • Significant total underground resource at Baldock.
  • Moderate average grade for underground.

Negative factors

  • Resource estimate previously announced.

Evidence · table

“847”

Context: 7,658

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida Gold Project · goldTonnes: 80000Grade: 1.9Grade Unit: g/tContained Metal: 5Contained Unit: kozView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
Resource group id
resource:2b792a1115c4094907b1
Deposit or zone
Kestrel
Mining method
combined

Resource Data

Category
inferred
Tonnes
80000
Grade
1.9
Grade Unit
g/t
Contained Metal
5
Contained Unit
koz
Cutoff Grade
1.3
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-09-23

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: Kestrel adds a small inferred underground resource with a weak grade, contributing marginally to the overall project.

Positive factors

  • Contributes to regional underground resource.

Negative factors

  • Inferred category has lower geological confidence.
  • Grade is weak for underground.
  • Resource estimate previously announced.

Evidence · table

“5”

Context: 80

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida Gold Project · goldTonnes: 30000Grade: 3.1Grade Unit: g/tContained Metal: 3Contained Unit: kozView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
Resource group id
resource:0c0e87fdcca60b6c23ea
Deposit or zone
Bombay
Mining method
combined

Resource Data

Category
inferred
Tonnes
30000
Grade
3.1
Grade Unit
g/t
Contained Metal
3
Contained Unit
koz
Cutoff Grade
1.3
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-09-23

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: Bombay adds a very small inferred underground resource with a moderate grade, contributing marginally to the overall project.

Positive factors

  • Contributes to regional underground resource.

Negative factors

  • Inferred category has lower geological confidence.
  • Grade is moderate for underground.
  • Resource estimate previously announced.

Evidence · table

“3”

Context: 30

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida Gold Project · goldTonnes: 121000Grade: 2.3Grade Unit: g/tContained Metal: 9Contained Unit: kozView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
Resource group id
resource:c0a0b316ef1315e22eb5
Deposit or zone
West Knell
Mining method
combined

Resource Data

Category
inferred
Tonnes
121000
Grade
2.3
Grade Unit
g/t
Contained Metal
9
Contained Unit
koz
Cutoff Grade
1.3
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-09-23

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: West Knell adds a small inferred underground resource with a weak grade, contributing marginally to the overall project.

Positive factors

  • Contributes to regional underground resource.

Negative factors

  • Inferred category has lower geological confidence.
  • Grade is weak for underground.
  • Resource estimate previously announced.

Evidence · table

“9”

Context: 121

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredMt Ida Gold Project · goldTonnes: 23000Grade: 2.9Grade Unit: g/tContained Metal: 2Contained Unit: kozView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Todd Hibberd, Mr Michael Andrew, Ms Susan Havlin
Resource group id
resource:7ddc76a7a607c2debbd1
Deposit or zone
Neptune
Mining method
combined

Resource Data

Category
inferred
Tonnes
23000
Grade
2.9
Grade Unit
g/t
Contained Metal
2
Contained Unit
koz
Cutoff Grade
1.3
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-09-23

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: Neptune adds a very small inferred underground resource with a moderate grade, contributing marginally to the overall project.

Positive factors

  • Contributes to regional underground resource.

Negative factors

  • Inferred category has lower geological confidence.
  • Grade is moderate for underground.
  • Resource estimate previously announced.

Evidence · table

“2”

Context: 23

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 25Mt Ida Gold Project · goldView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Reporting standards
ni_43_101, jorc
Resource group id
resource:65fb03fa26634c720bdd
Mining method
combined

Prior Estimate

Resource Date
2026-11-08

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The confirmation that all mineral resources are on granted mining leases is a significant de-risking factor for the project.

Positive factors

  • All mineral resources are on granted mining leases, de-risking project development.

Evidence · text

“All Mineral Resources on Granted Mining Leases”

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 26Mt Ida Gold Project · goldView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Reporting standards
ni_43_101, jorc
Resource group id
resource:65fb03fa26634c720bdd
Mining method
combined

Prior Estimate

Resource Date
2026-11-08

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: Having approved mining and closure plans for both open pit and underground operations at Baldock significantly de-risks the project's development path.

Positive factors

  • Approved mining proposal and mine closure plan for both open pit and underground mining at Baldock, facilitating future operations.

Evidence · text

“Approved Mining Proposal and Mine Closure Plan for open pit and underground mining at Baldock”

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 27Mt Ida Gold Project · goldView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Reporting standards
ni_43_101, jorc
Resource group id
resource:65fb03fa26634c720bdd
Mining method
combined

Prior Estimate

Resource Date
2026-11-08

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The approval for the process plant and tailings facility is a critical step towards construction and production, significantly de-risking the project.

Positive factors

  • Works Approval granted for a 2.0 Mtpa Process Plant and tailings storage facility, enabling construction.

Evidence · text

“Works Approval granted for 2.0 Mtpa Process Plant and tailings storage facility”

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 28Mt Ida Gold Project · goldView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Reporting standards
ni_43_101, jorc
Resource group id
resource:65fb03fa26634c720bdd
Mining method
combined

Prior Estimate

Resource Date
2026-11-08

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: Securing a substantial groundwater license is crucial for the operational viability of the project.

Positive factors

  • A 3.7 GL/yr groundwater license is granted, securing water supply for operations.

Evidence · text

“3.7 GL/yr groundwater license”

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 29Mt Ida Gold Project · goldView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Reporting standards
ni_43_101, jorc
Resource group id
resource:65fb03fa26634c720bdd
Mining method
combined

Prior Estimate

Resource Date
2026-11-08

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The installation of production bores demonstrates progress in establishing necessary infrastructure for water supply.

Positive factors

  • Eight production bores installed to support water extraction requirements.

Evidence · text

“Eight production bores installed”

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 30Mt Ida Gold Project · goldView all details
Link to this fact

Identity

Project
Mt Ida Gold Project
Commodity
gold
Region
wa eastern goldfields
Reported Region
WA Eastern Goldfields
Ticker
BM1

Resource scope

Reporting standards
ni_43_101, jorc
Resource group id
resource:65fb03fa26634c720bdd
Mining method
combined

Prior Estimate

Resource Date
2026-11-08

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: Completion of the road diversion is a minor but necessary infrastructure milestone for the project.

Positive factors

  • Mt Ida public road diversion complete, indicating progress on site logistics.

Evidence · text

“Mt Ida public road diversion complete”

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.