Summary

Black Canyon Ltd released a corporate presentation updating on its Wandanya Project, including a maiden Mineral Resource Estimate for manganese and iron. The estimate outlines significant resources, with a high proportion in the Measured and Indicated categories. Additionally, pilot-scale metallurgical testwork for manganese demonstrated high recoveries and low deleterious elements, supporting the project's development potential.

Reasoning: Black Canyon Ltd announced a maiden Mineral Resource Estimate for its Wandanya Project, demonstrating significant manganese and iron resources with high confidence categories. Additionally, positive pilot-scale metallurgical testwork results for manganese indicate high recoveries and low penalty elements, supporting the project's development potential.

Positive factors

  • Maiden Mineral Resource Estimate for both manganese and iron establishes a significant baseline for the Wandanya Project.
  • High proportion of Measured and Indicated categories (92% M&I for Mn, 99% M&I for Fe) indicates strong geological confidence.
  • Pilot-scale metallurgical testwork for manganese achieved high recoveries (80-82%) via Dense Media Separation (DMS).
  • Beneficiated manganese products show low penalty elements (Al, P), indicating smelter-friendly chemistry.
  • The project demonstrates dual-commodity optionality with both high-grade manganese and iron resources.

Negative factors

  • The metallurgical testwork does not explicitly state the laboratory or consultant, which could affect external verification.

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 57

Atlas analysis — Black Canyon Ltd: BCA: Corporate Presentation Update. measured 15500000 tonnes; 82% recovery

Classification and evidence

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: the document describes a flotation route ("concentrate")

Gravity Routeneutral

Gravity separation forms a material part of the flowsheet.

Why it applies: the document describes a gravity route ("dense media separation")

Single Domain Onlynegative

Testing limited to one composite or domain — representativeness not established.

Why it applies: only one composite was tested

Extracted facts

Stored fact records: 57. Some facts used in scoring do not have a stored record.

Resource Estimates (48)

measuredWandanya Project · manganeseTonnes: 15500000Grade: 26.9Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
manganese
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:45b136daa90c850dd624

Resource Data

Category
measured
Tonnes
15500000
Grade
26.9
Grade Unit
%
Cutoff Grade
12
Cutoff Unit
% Mn

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Measured resource fact represents a high-grade manganese resource, contributing significantly to the project's maiden MRE with high confidence.

Positive factors

  • High grade (26.9% Mn) for an open-pit manganese resource.
  • Measured category indicates high geological confidence.
  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“26.9”

Context: 15.5

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredWandanya Project · iron_oreTonnes: 15500000Grade: 5.7Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:45b136daa90c850dd624

Resource Data

Category
measured
Tonnes
15500000
Grade
5.7
Grade Unit
%
Cutoff Grade
12
Cutoff Unit
% Mn

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Measured resource fact for iron, while lower grade, contributes to the project's dual-commodity potential and is part of a maiden MRE with high confidence.

Positive factors

  • Measured category indicates high geological confidence.
  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“5.7”

Context: 15.5

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredWandanya Project · silicon_dioxideTonnes: 15500000Grade: 18.9Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
silicon_dioxide
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:45b136daa90c850dd624

Resource Data

Category
measured
Tonnes
15500000
Grade
18.9
Grade Unit
%
Cutoff Grade
12
Cutoff Unit
% Mn

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Measured resource fact for silicon dioxide provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Measured category indicates high geological confidence.
  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“18.9”

Context: 15.5

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredWandanya Project · aluminium_oxideTonnes: 15500000Grade: 5.1Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
aluminium_oxide
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:45b136daa90c850dd624

Resource Data

Category
measured
Tonnes
15500000
Grade
5.1
Grade Unit
%
Cutoff Grade
12
Cutoff Unit
% Mn

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Measured resource fact for aluminium oxide provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Measured category indicates high geological confidence.
  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“5.1”

Context: 15.5

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredWandanya Project · phosphorusTonnes: 15500000Grade: 0.02Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
phosphorus
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:45b136daa90c850dd624

Resource Data

Category
measured
Tonnes
15500000
Grade
0.02
Grade Unit
%
Cutoff Grade
12
Cutoff Unit
% Mn

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Measured resource fact for phosphorus provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Measured category indicates high geological confidence.
  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“0.02”

Context: 15.5

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredWandanya Project · loss_on_ignitionTonnes: 15500000Grade: 17.5Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
loss_on_ignition
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:45b136daa90c850dd624

Resource Data

Category
measured
Tonnes
15500000
Grade
17.5
Grade Unit
%
Cutoff Grade
12
Cutoff Unit
% Mn

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Measured resource fact for loss on ignition provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Measured category indicates high geological confidence.
  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“17.5”

Context: 15.5

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedWandanya Project · manganeseTonnes: 6300000Grade: 22.9Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
manganese
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:59b72adb0ce86ac620ce

Resource Data

Category
indicated
Tonnes
6300000
Grade
22.9
Grade Unit
%
Cutoff Grade
12
Cutoff Unit
% Mn

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Indicated resource fact represents a high-grade manganese resource, contributing significantly to the project's maiden MRE with good confidence.

Positive factors

  • High grade (22.9% Mn) for an open-pit manganese resource.
  • Indicated category indicates good geological confidence.
  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“22.9”

Context: 6.3

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The resource is classified as Indicated, indicating a good level of confidence.

Evidence · table

“Indicated”

Context: 6.3

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedWandanya Project · iron_oreTonnes: 6300000Grade: 3.4Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:59b72adb0ce86ac620ce

Resource Data

Category
indicated
Tonnes
6300000
Grade
3.4
Grade Unit
%
Cutoff Grade
12
Cutoff Unit
% Mn

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Indicated resource fact for iron, while lower grade, contributes to the project's dual-commodity potential and is part of a maiden MRE with good confidence.

Positive factors

  • Indicated category indicates good geological confidence.
  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“3.4”

Context: 6.3

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The resource is classified as Indicated, indicating a good level of confidence.

Evidence · table

“Indicated”

Context: 6.3

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedWandanya Project · silicon_dioxideTonnes: 6300000Grade: 15.8Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
silicon_dioxide
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:59b72adb0ce86ac620ce

Resource Data

Category
indicated
Tonnes
6300000
Grade
15.8
Grade Unit
%
Cutoff Grade
12
Cutoff Unit
% Mn

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Indicated resource fact for silicon dioxide provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Indicated category indicates good geological confidence.
  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“15.8”

Context: 6.3

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The resource is classified as Indicated, indicating a good level of confidence.

Evidence · table

“Indicated”

Context: 6.3

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedWandanya Project · aluminium_oxideTonnes: 6300000Grade: 4.3Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
aluminium_oxide
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:59b72adb0ce86ac620ce

Resource Data

Category
indicated
Tonnes
6300000
Grade
4.3
Grade Unit
%
Cutoff Grade
12
Cutoff Unit
% Mn

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Indicated resource fact for aluminium oxide provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Indicated category indicates good geological confidence.
  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“4.3”

Context: 6.3

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The resource is classified as Indicated, indicating a good level of confidence.

Evidence · table

“Indicated”

Context: 6.3

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedWandanya Project · phosphorusTonnes: 6300000Grade: 0.02Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
phosphorus
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:59b72adb0ce86ac620ce

Resource Data

Category
indicated
Tonnes
6300000
Grade
0.02
Grade Unit
%
Cutoff Grade
12
Cutoff Unit
% Mn

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Indicated resource fact for phosphorus provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Indicated category indicates good geological confidence.
  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“0.02”

Context: 6.3

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The resource is classified as Indicated, indicating a good level of confidence.

Evidence · table

“Indicated”

Context: 6.3

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedWandanya Project · loss_on_ignitionTonnes: 6300000Grade: 25.3Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
loss_on_ignition
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:59b72adb0ce86ac620ce

Resource Data

Category
indicated
Tonnes
6300000
Grade
25.3
Grade Unit
%
Cutoff Grade
12
Cutoff Unit
% Mn

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Indicated resource fact for loss on ignition provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Indicated category indicates good geological confidence.
  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“25.3”

Context: 6.3

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The resource is classified as Indicated, indicating a good level of confidence.

Evidence · table

“Indicated”

Context: 6.3

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredWandanya Project · manganeseTonnes: 1800000Grade: 26.7Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
manganese
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:20e613b4bb93820fab7c

Resource Data

Category
inferred
Tonnes
1800000
Grade
26.7
Grade Unit
%
Cutoff Grade
12
Cutoff Unit
% Mn

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Inferred resource fact represents a high-grade manganese resource, contributing to the project's maiden MRE, though with lower confidence due to its category.

Positive factors

  • High grade (26.7% Mn) for an open-pit manganese resource.
  • Part of a maiden MRE, representing a new baseline for the project.

Negative factors

  • Inferred category indicates lower geological confidence.

Evidence · table

“26.7”

Context: 1.8

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource is classified as Inferred, indicating a speculative level of confidence.

Evidence · table

“Inferred”

Context: 1.8

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredWandanya Project · iron_oreTonnes: 1800000Grade: 3Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:20e613b4bb93820fab7c

Resource Data

Category
inferred
Tonnes
1800000
Grade
3
Grade Unit
%
Cutoff Grade
12
Cutoff Unit
% Mn

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Inferred resource fact for iron contributes to the project's dual-commodity potential, though with lower confidence due to its category.

Positive factors

  • Part of a maiden MRE, representing a new baseline for the project.

Negative factors

  • Inferred category indicates lower geological confidence.

Evidence · table

“3.0”

Context: 1.8

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource is classified as Inferred, indicating a speculative level of confidence.

Evidence · table

“Inferred”

Context: 1.8

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredWandanya Project · silicon_dioxideTonnes: 1800000Grade: 13.8Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
silicon_dioxide
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:20e613b4bb93820fab7c

Resource Data

Category
inferred
Tonnes
1800000
Grade
13.8
Grade Unit
%
Cutoff Grade
12
Cutoff Unit
% Mn

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Inferred resource fact for silicon dioxide provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Part of a maiden MRE, representing a new baseline for the project.

Negative factors

  • Inferred category indicates lower geological confidence.

Evidence · table

“13.8”

Context: 1.8

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource is classified as Inferred, indicating a speculative level of confidence.

Evidence · table

“Inferred”

Context: 1.8

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredWandanya Project · aluminium_oxideTonnes: 1800000Grade: 3.9Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
aluminium_oxide
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:20e613b4bb93820fab7c

Resource Data

Category
inferred
Tonnes
1800000
Grade
3.9
Grade Unit
%
Cutoff Grade
12
Cutoff Unit
% Mn

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Inferred resource fact for aluminium oxide provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Part of a maiden MRE, representing a new baseline for the project.

Negative factors

  • Inferred category indicates lower geological confidence.

Evidence · table

“3.9”

Context: 1.8

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource is classified as Inferred, indicating a speculative level of confidence.

Evidence · table

“Inferred”

Context: 1.8

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredWandanya Project · phosphorusTonnes: 1800000Grade: 0.02Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
phosphorus
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:20e613b4bb93820fab7c

Resource Data

Category
inferred
Tonnes
1800000
Grade
0.02
Grade Unit
%
Cutoff Grade
12
Cutoff Unit
% Mn

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Inferred resource fact for phosphorus provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Part of a maiden MRE, representing a new baseline for the project.

Negative factors

  • Inferred category indicates lower geological confidence.

Evidence · table

“0.02”

Context: 1.8

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource is classified as Inferred, indicating a speculative level of confidence.

Evidence · table

“Inferred”

Context: 1.8

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredWandanya Project · loss_on_ignitionTonnes: 1800000Grade: 24.1Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
loss_on_ignition
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:20e613b4bb93820fab7c

Resource Data

Category
inferred
Tonnes
1800000
Grade
24.1
Grade Unit
%
Cutoff Grade
12
Cutoff Unit
% Mn

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Inferred resource fact for loss on ignition provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Part of a maiden MRE, representing a new baseline for the project.

Negative factors

  • Inferred category indicates lower geological confidence.

Evidence · table

“24.1”

Context: 1.8

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource is classified as Inferred, indicating a speculative level of confidence.

Evidence · table

“Inferred”

Context: 1.8

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 19Wandanya Project · manganeseTonnes: 23600000Grade: 25.8Grade Unit: %Contained Metal: 6.1Contained Unit: mtView all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
manganese
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:447bfa1b536099ec4c88

Resource Data

Tonnes
23600000
Grade
25.8
Grade Unit
%
Contained Metal
6.1
Contained Unit
mt
Cutoff Grade
12
Cutoff Unit
% Mn

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This grand total for manganese represents a significant maiden resource with high confidence and grade, establishing a strong foundation for the project.

Positive factors

  • Significant total tonnage and high grade for manganese.
  • High proportion of Measured and Indicated categories (92%) indicates strong geological confidence.
  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“25.8”

Context: 23.6

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 20Wandanya Project · iron_oreTonnes: 23600000Grade: 4.9Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:447bfa1b536099ec4c88

Resource Data

Tonnes
23600000
Grade
4.9
Grade Unit
%
Cutoff Grade
12
Cutoff Unit
% Mn

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This grand total for iron represents a significant maiden resource, contributing to the project's dual-commodity potential.

Positive factors

  • Significant total tonnage for iron, contributing to dual-commodity potential.
  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“4.9”

Context: 23.6

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 21Wandanya Project · silicon_dioxideTonnes: 23600000Grade: 17.7Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
silicon_dioxide
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:447bfa1b536099ec4c88

Resource Data

Tonnes
23600000
Grade
17.7
Grade Unit
%
Cutoff Grade
12
Cutoff Unit
% Mn

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This grand total for silicon dioxide provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“17.7”

Context: 23.6

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 22Wandanya Project · aluminium_oxideTonnes: 23600000Grade: 4.8Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
aluminium_oxide
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:447bfa1b536099ec4c88

Resource Data

Tonnes
23600000
Grade
4.8
Grade Unit
%
Cutoff Grade
12
Cutoff Unit
% Mn

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This grand total for aluminium oxide provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“4.8”

Context: 23.6

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 23Wandanya Project · phosphorusTonnes: 23600000Grade: 0.02Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
phosphorus
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:447bfa1b536099ec4c88

Resource Data

Tonnes
23600000
Grade
0.02
Grade Unit
%
Cutoff Grade
12
Cutoff Unit
% Mn

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This grand total for phosphorus provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“0.02”

Context: 23.6

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 24Wandanya Project · loss_on_ignitionTonnes: 23600000Grade: 20.1Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
loss_on_ignition
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:447bfa1b536099ec4c88

Resource Data

Tonnes
23600000
Grade
20.1
Grade Unit
%
Cutoff Grade
12
Cutoff Unit
% Mn

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This grand total for loss on ignition provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“20.1”

Context: 23.6

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredWandanya Project · iron_oreTonnes: 11600000Grade: 55.1Grade Unit: %Contained Metal: 6.4Contained Unit: mtView all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:2b6665d9f2d64d6d5968

Resource Data

Category
measured
Tonnes
11600000
Grade
55.1
Grade Unit
%
Contained Metal
6.4
Contained Unit
mt
Cutoff Grade
50
Cutoff Unit
% Fe

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Measured resource fact represents a high-grade iron resource, contributing significantly to the project's maiden MRE with high confidence.

Positive factors

  • High grade (55.1% Fe) for an open-pit iron resource.
  • Measured category indicates high geological confidence.
  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“55.1”

Context: 11.6

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredWandanya Project · manganeseTonnes: 11600000Grade: 0.7Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
manganese
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:2b6665d9f2d64d6d5968

Resource Data

Category
measured
Tonnes
11600000
Grade
0.7
Grade Unit
%
Cutoff Grade
50
Cutoff Unit
% Fe

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Measured resource fact for manganese provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Measured category indicates high geological confidence.
  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“0.7”

Context: 11.6

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredWandanya Project · silicon_dioxideTonnes: 11600000Grade: 13.7Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
silicon_dioxide
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:2b6665d9f2d64d6d5968

Resource Data

Category
measured
Tonnes
11600000
Grade
13.7
Grade Unit
%
Cutoff Grade
50
Cutoff Unit
% Fe

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Measured resource fact for silicon dioxide provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Measured category indicates high geological confidence.
  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“13.7”

Context: 11.6

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredWandanya Project · aluminium_oxideTonnes: 11600000Grade: 2.4Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
aluminium_oxide
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:2b6665d9f2d64d6d5968

Resource Data

Category
measured
Tonnes
11600000
Grade
2.4
Grade Unit
%
Cutoff Grade
50
Cutoff Unit
% Fe

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Measured resource fact for aluminium oxide provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Measured category indicates high geological confidence.
  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“2.4”

Context: 11.6

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredWandanya Project · phosphorusTonnes: 11600000Grade: 0.02Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
phosphorus
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:2b6665d9f2d64d6d5968

Resource Data

Category
measured
Tonnes
11600000
Grade
0.02
Grade Unit
%
Cutoff Grade
50
Cutoff Unit
% Fe

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Measured resource fact for phosphorus provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Measured category indicates high geological confidence.
  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“0.02”

Context: 11.6

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredWandanya Project · loss_on_ignitionTonnes: 11600000Grade: 3.3Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
loss_on_ignition
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:2b6665d9f2d64d6d5968

Resource Data

Category
measured
Tonnes
11600000
Grade
3.3
Grade Unit
%
Cutoff Grade
50
Cutoff Unit
% Fe

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Measured resource fact for loss on ignition provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Measured category indicates high geological confidence.
  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“3.3”

Context: 11.6

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedWandanya Project · iron_oreTonnes: 800000Grade: 51.5Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:30a093e2075af2dc87bc

Resource Data

Category
indicated
Tonnes
800000
Grade
51.5
Grade Unit
%
Cutoff Grade
50
Cutoff Unit
% Fe

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Indicated resource fact represents a high-grade iron resource, contributing to the project's maiden MRE with good confidence.

Positive factors

  • High grade (51.5% Fe) for an open-pit iron resource.
  • Indicated category indicates good geological confidence.
  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“51.5”

Context: 0.8

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The resource is classified as Indicated, indicating a good level of confidence.

Evidence · table

“Indicated”

Context: 0.8

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedWandanya Project · manganeseTonnes: 800000Grade: 0.7Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
manganese
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:30a093e2075af2dc87bc

Resource Data

Category
indicated
Tonnes
800000
Grade
0.7
Grade Unit
%
Cutoff Grade
50
Cutoff Unit
% Fe

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Indicated resource fact for manganese provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Indicated category indicates good geological confidence.
  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“0.7”

Context: 0.8

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The resource is classified as Indicated, indicating a good level of confidence.

Evidence · table

“Indicated”

Context: 0.8

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedWandanya Project · silicon_dioxideTonnes: 800000Grade: 16.1Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
silicon_dioxide
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:30a093e2075af2dc87bc

Resource Data

Category
indicated
Tonnes
800000
Grade
16.1
Grade Unit
%
Cutoff Grade
50
Cutoff Unit
% Fe

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Indicated resource fact for silicon dioxide provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Indicated category indicates good geological confidence.
  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“16.1”

Context: 0.8

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The resource is classified as Indicated, indicating a good level of confidence.

Evidence · table

“Indicated”

Context: 0.8

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedWandanya Project · aluminium_oxideTonnes: 800000Grade: 2.2Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
aluminium_oxide
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:30a093e2075af2dc87bc

Resource Data

Category
indicated
Tonnes
800000
Grade
2.2
Grade Unit
%
Cutoff Grade
50
Cutoff Unit
% Fe

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Indicated resource fact for aluminium oxide provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Indicated category indicates good geological confidence.
  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“2.2”

Context: 0.8

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The resource is classified as Indicated, indicating a good level of confidence.

Evidence · table

“Indicated”

Context: 0.8

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedWandanya Project · phosphorusTonnes: 800000Grade: 0.03Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
phosphorus
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:30a093e2075af2dc87bc

Resource Data

Category
indicated
Tonnes
800000
Grade
0.03
Grade Unit
%
Cutoff Grade
50
Cutoff Unit
% Fe

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Indicated resource fact for phosphorus provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Indicated category indicates good geological confidence.
  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“0.03”

Context: 0.8

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The resource is classified as Indicated, indicating a good level of confidence.

Evidence · table

“Indicated”

Context: 0.8

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedWandanya Project · loss_on_ignitionTonnes: 800000Grade: 4.6Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
loss_on_ignition
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:30a093e2075af2dc87bc

Resource Data

Category
indicated
Tonnes
800000
Grade
4.6
Grade Unit
%
Cutoff Grade
50
Cutoff Unit
% Fe

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Indicated resource fact for loss on ignition provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Indicated category indicates good geological confidence.
  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“4.6”

Context: 0.8

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The resource is classified as Indicated, indicating a good level of confidence.

Evidence · table

“Indicated”

Context: 0.8

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredWandanya Project · iron_oreTonnes: 20000Grade: 51.2Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:95b697cc061a1c897a98

Resource Data

Category
inferred
Tonnes
20000
Grade
51.2
Grade Unit
%
Cutoff Grade
50
Cutoff Unit
% Fe

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Inferred resource fact represents a high-grade iron resource, contributing to the project's maiden MRE, though with lower confidence due to its category.

Positive factors

  • High grade (51.2% Fe) for an open-pit iron resource.
  • Part of a maiden MRE, representing a new baseline for the project.

Negative factors

  • Inferred category indicates lower geological confidence.

Evidence · table

“51.2”

Context: 0.02

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource is classified as Inferred, indicating a speculative level of confidence.

Evidence · table

“Inferred”

Context: 0.02

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredWandanya Project · manganeseTonnes: 20000Grade: 0.1Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
manganese
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:95b697cc061a1c897a98

Resource Data

Category
inferred
Tonnes
20000
Grade
0.1
Grade Unit
%
Cutoff Grade
50
Cutoff Unit
% Fe

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Inferred resource fact for manganese provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Part of a maiden MRE, representing a new baseline for the project.

Negative factors

  • Inferred category indicates lower geological confidence.

Evidence · table

“0.1”

Context: 0.02

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource is classified as Inferred, indicating a speculative level of confidence.

Evidence · table

“Inferred”

Context: 0.02

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredWandanya Project · silicon_dioxideTonnes: 20000Grade: 15.7Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
silicon_dioxide
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:95b697cc061a1c897a98

Resource Data

Category
inferred
Tonnes
20000
Grade
15.7
Grade Unit
%
Cutoff Grade
50
Cutoff Unit
% Fe

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Inferred resource fact for silicon dioxide provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Part of a maiden MRE, representing a new baseline for the project.

Negative factors

  • Inferred category indicates lower geological confidence.

Evidence · table

“15.7”

Context: 0.02

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource is classified as Inferred, indicating a speculative level of confidence.

Evidence · table

“Inferred”

Context: 0.02

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredWandanya Project · aluminium_oxideTonnes: 20000Grade: 2.7Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
aluminium_oxide
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:95b697cc061a1c897a98

Resource Data

Category
inferred
Tonnes
20000
Grade
2.7
Grade Unit
%
Cutoff Grade
50
Cutoff Unit
% Fe

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Inferred resource fact for aluminium oxide provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Part of a maiden MRE, representing a new baseline for the project.

Negative factors

  • Inferred category indicates lower geological confidence.

Evidence · table

“2.7”

Context: 0.02

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource is classified as Inferred, indicating a speculative level of confidence.

Evidence · table

“Inferred”

Context: 0.02

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredWandanya Project · phosphorusTonnes: 20000Grade: 0.02Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
phosphorus
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:95b697cc061a1c897a98

Resource Data

Category
inferred
Tonnes
20000
Grade
0.02
Grade Unit
%
Cutoff Grade
50
Cutoff Unit
% Fe

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Inferred resource fact for phosphorus provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Part of a maiden MRE, representing a new baseline for the project.

Negative factors

  • Inferred category indicates lower geological confidence.

Evidence · table

“0.02”

Context: 0.02

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource is classified as Inferred, indicating a speculative level of confidence.

Evidence · table

“Inferred”

Context: 0.02

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredWandanya Project · loss_on_ignitionTonnes: 20000Grade: 4.8Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
loss_on_ignition
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:95b697cc061a1c897a98

Resource Data

Category
inferred
Tonnes
20000
Grade
4.8
Grade Unit
%
Cutoff Grade
50
Cutoff Unit
% Fe

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This Inferred resource fact for loss on ignition provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Part of a maiden MRE, representing a new baseline for the project.

Negative factors

  • Inferred category indicates lower geological confidence.

Evidence · table

“4.8”

Context: 0.02

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource is classified as Inferred, indicating a speculative level of confidence.

Evidence · table

“Inferred”

Context: 0.02

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 43Wandanya Project · iron_oreTonnes: 12500000Grade: 54.9Grade Unit: %Contained Metal: 6.8Contained Unit: mtView all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:d6f0b54709e21bf47e4b

Resource Data

Tonnes
12500000
Grade
54.9
Grade Unit
%
Contained Metal
6.8
Contained Unit
mt
Cutoff Grade
50
Cutoff Unit
% Fe

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This grand total for iron represents a significant maiden resource with high confidence and grade, establishing a strong foundation for the project.

Positive factors

  • Significant total tonnage and high grade for iron.
  • High proportion of Measured and Indicated categories (99%) indicates strong geological confidence.
  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“54.9”

Context: 12.5

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 44Wandanya Project · manganeseTonnes: 12500000Grade: 0.7Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
manganese
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:d6f0b54709e21bf47e4b

Resource Data

Tonnes
12500000
Grade
0.7
Grade Unit
%
Cutoff Grade
50
Cutoff Unit
% Fe

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This grand total for manganese provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“0.7”

Context: 12.5

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 45Wandanya Project · silicon_dioxideTonnes: 12500000Grade: 13.8Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
silicon_dioxide
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:d6f0b54709e21bf47e4b

Resource Data

Tonnes
12500000
Grade
13.8
Grade Unit
%
Cutoff Grade
50
Cutoff Unit
% Fe

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This grand total for silicon dioxide provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“13.8”

Context: 12.5

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 46Wandanya Project · aluminium_oxideTonnes: 12500000Grade: 2.4Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
aluminium_oxide
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:d6f0b54709e21bf47e4b

Resource Data

Tonnes
12500000
Grade
2.4
Grade Unit
%
Cutoff Grade
50
Cutoff Unit
% Fe

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This grand total for aluminium oxide provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“2.4”

Context: 12.5

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 47Wandanya Project · phosphorusTonnes: 12500000Grade: 0.02Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
phosphorus
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:d6f0b54709e21bf47e4b

Resource Data

Tonnes
12500000
Grade
0.02
Grade Unit
%
Cutoff Grade
50
Cutoff Unit
% Fe

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This grand total for phosphorus provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“0.02”

Context: 12.5

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 48Wandanya Project · loss_on_ignitionTonnes: 12500000Grade: 3.4Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
loss_on_ignition
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Brendan Cummins
Resource group id
resource:d6f0b54709e21bf47e4b

Resource Data

Tonnes
12500000
Grade
3.4
Grade Unit
%
Cutoff Grade
50
Cutoff Unit
% Fe

Prior Estimate

Resource Date
2026-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This grand total for loss on ignition provides additional detail on the resource composition, contributing to the overall understanding of the maiden MRE.

Positive factors

  • Part of a maiden MRE, representing a new baseline for the project.

Evidence · table

“3.4”

Context: 12.5

Tags used in scoring

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: This is part of the first formal Mineral Resource Estimate for the Wandanya Project.

Evidence · text

“Wandanya Project: Maiden Mineral Resource”

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Metallurgical Results (9)

pilot plantWandanya Project · manganeseRecovery: 82 %Head Grade: 32.4Head Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
manganese
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Test Work

Program Status
detailed
Test Type
pilot plant
Processing Route
dense media separation
Sample
Blend 1 - composite of LG/MG/HG MnO

Recovery

Recovery
82 %
Recovery Basis
actual_test
Head Grade
32.4
Head Grade Unit
%
Conc. Grade
41
Conc. Grade Unit
%

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: Pilot-scale DMS testwork achieved high manganese recovery and a high-grade concentrate with low penalty elements, indicating positive metallurgical characteristics for the Wandanya Project.

Positive factors

  • High manganese recovery (82%) achieved at pilot scale.
  • Beneficiated product grade of 41% Mn is high.
  • Low penalty elements in the beneficiated product.

Evidence · table

“82”

Context: 32.4

Tags used in scoring

Gravity Routeneutral

Gravity separation forms a material part of the flowsheet.

Why it applies: processing_route matches the gravity signal

pilot plantWandanya Project · iron_oreHead Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Test Work

Program Status
detailed
Test Type
pilot plant
Processing Route
dense media separation
Sample
Blend 1 - composite of LG/MG/HG MnO

Recovery

Head Grade Unit
%
Conc. Grade
6.5
Conc. Grade Unit
%

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This fact provides iron content in the manganese concentrate, which is important for understanding the overall product quality from the pilot-scale testwork.

Positive factors

  • Pilot scale testwork provides high confidence in results.
  • Low penalty elements in the beneficiated product.

Evidence · table

“6.5”

Context: 41.0

Tags used in scoring

Gravity Routeneutral

Gravity separation forms a material part of the flowsheet.

Why it applies: processing_route matches the gravity signal

pilot plantWandanya Project · aluminiumHead Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
aluminium
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Test Work

Program Status
detailed
Test Type
pilot plant
Processing Route
dense media separation
Sample
Blend 1 - composite of LG/MG/HG MnO

Recovery

Head Grade Unit
%
Conc. Grade
1.6
Conc. Grade Unit
%

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This fact provides aluminium content in the manganese concentrate, which is important for understanding the overall product quality and potential penalty elements from the pilot-scale testwork.

Positive factors

  • Pilot scale testwork provides high confidence in results.
  • Low penalty elements in the beneficiated product.

Evidence · table

“1.6”

Context: 41.0

Tags used in scoring

Gravity Routeneutral

Gravity separation forms a material part of the flowsheet.

Why it applies: processing_route matches the gravity signal

pilot plantWandanya Project · siliconHead Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
silicon
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Test Work

Program Status
detailed
Test Type
pilot plant
Processing Route
dense media separation
Sample
Blend 1 - composite of LG/MG/HG MnO

Recovery

Head Grade Unit
%
Conc. Grade
5
Conc. Grade Unit
%

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This fact provides silicon content in the manganese concentrate, which is important for understanding the overall product quality and potential penalty elements from the pilot-scale testwork.

Positive factors

  • Pilot scale testwork provides high confidence in results.
  • Low penalty elements in the beneficiated product.

Evidence · table

“5.0”

Context: 41.0

Tags used in scoring

Gravity Routeneutral

Gravity separation forms a material part of the flowsheet.

Why it applies: processing_route matches the gravity signal

pilot plantWandanya Project · phosphorusHead Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
phosphorus
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Test Work

Program Status
detailed
Test Type
pilot plant
Processing Route
dense media separation
Sample
Blend 1 - composite of LG/MG/HG MnO

Recovery

Head Grade Unit
%
Conc. Grade
0.02
Conc. Grade Unit
%

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This fact provides phosphorus content in the manganese concentrate, which is important for understanding the overall product quality and potential penalty elements from the pilot-scale testwork.

Positive factors

  • Pilot scale testwork provides high confidence in results.
  • Low penalty elements in the beneficiated product.

Evidence · table

“0.02”

Context: 41.0

Tags used in scoring

Gravity Routeneutral

Gravity separation forms a material part of the flowsheet.

Why it applies: processing_route matches the gravity signal

pilot plantWandanya Project · manganeseRecovery: 80 %Head Grade: 29.3Head Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
manganese
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Test Work

Program Status
detailed
Test Type
pilot plant
Processing Route
dense media separation
Sample
Blend 2 - composite of LG/MG MnO

Recovery

Recovery
80 %
Recovery Basis
actual_test
Head Grade
29.3
Head Grade Unit
%
Conc. Grade
38.5
Conc. Grade Unit
%

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: Pilot-scale DMS testwork achieved high manganese recovery and a high-grade concentrate with low penalty elements, indicating positive metallurgical characteristics for the Wandanya Project.

Positive factors

  • High manganese recovery (80%) achieved at pilot scale.
  • Beneficiated product grade of 38.5% Mn is high.
  • Low penalty elements in the beneficiated product.

Evidence · table

“80”

Context: 29.3

Tags used in scoring

Gravity Routeneutral

Gravity separation forms a material part of the flowsheet.

Why it applies: processing_route matches the gravity signal

pilot plantWandanya Project · iron_oreHead Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Test Work

Program Status
detailed
Test Type
pilot plant
Processing Route
dense media separation
Sample
Blend 2 - composite of LG/MG MnO

Recovery

Head Grade Unit
%
Conc. Grade
7.5
Conc. Grade Unit
%

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This fact provides iron content in the manganese concentrate, which is important for understanding the overall product quality from the pilot-scale testwork.

Positive factors

  • Pilot scale testwork provides high confidence in results.
  • Low penalty elements in the beneficiated product.

Evidence · table

“7.5”

Context: 38.5

Tags used in scoring

Gravity Routeneutral

Gravity separation forms a material part of the flowsheet.

Why it applies: processing_route matches the gravity signal

pilot plantWandanya Project · aluminiumHead Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
aluminium
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Test Work

Program Status
detailed
Test Type
pilot plant
Processing Route
dense media separation
Sample
Blend 2 - composite of LG/MG MnO

Recovery

Head Grade Unit
%
Conc. Grade
1.9
Conc. Grade Unit
%

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This fact provides aluminium content in the manganese concentrate, which is important for understanding the overall product quality and potential penalty elements from the pilot-scale testwork.

Positive factors

  • Pilot scale testwork provides high confidence in results.
  • Low penalty elements in the beneficiated product.

Evidence · table

“1.9”

Context: 38.5

Tags used in scoring

Gravity Routeneutral

Gravity separation forms a material part of the flowsheet.

Why it applies: processing_route matches the gravity signal

pilot plantWandanya Project · siliconHead Grade Unit: %View all details
Link to this fact

Identity

Project
Wandanya Project
Commodity
silicon
Region
australia_wa
Reported Region
Western Australia
Ticker
BCA

Test Work

Program Status
detailed
Test Type
pilot plant
Processing Route
dense media separation
Sample
Blend 2 - composite of LG/MG MnO

Recovery

Head Grade Unit
%
Conc. Grade
6
Conc. Grade Unit
%

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This fact provides silicon content in the manganese concentrate, which is important for understanding the overall product quality and potential penalty elements from the pilot-scale testwork.

Positive factors

  • Pilot scale testwork provides high confidence in results.
  • Low penalty elements in the beneficiated product.

Evidence · table

“6.0”

Context: 38.5

Tags used in scoring

Gravity Routeneutral

Gravity separation forms a material part of the flowsheet.

Why it applies: processing_route matches the gravity signal

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.