Aztec Extends Oxide Gold Silver Mineralization Up To 190 M West At The North Extension At Tombstone Arizona Including 1158 M Of 067 Gt Aueq 052 Gt Au 811 Gt Ag In Tr26 45
Original announcement by prospectors_exchange on
- Company
- Aztec Minerals
- Ticker
- AZT
- Exchange
- Unavailable
- Region
- Arizona
- Primary commodity
- Gold
- Secondary commodities
- Silver
- Document categories
- Drill results
- Extracted
- 2026-10-22 11:48:15 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Aztec Minerals has reported a significant extension of oxide gold-silver mineralization at the North Extension of the Tombstone project in Arizona. The results include a notable intercept of 1158 m at 0.67 g/t AuEq, comprising 0.52 g/t Au and 811 g/t Ag in hole TR26-45.
Reasoning: The announcement reports a significant step-out extension of mineralization at the Tombstone project, featuring a high-grade silver-gold intercept (811 g/t Ag) over a substantial width (1158 m cumulative/headline context).
Positive factors
- Step-out extension of mineralization
- High-grade silver credits
- Significant intercept width
Facts used in scoring: 3

Classification and evidence
Step-Out Extensionpositive
Mineralization extended beyond the previously known limit.
Why it applies: The headline explicitly states the company 'Extends Oxide Gold Silver Mineralization Up To 190 M West'.
Evidence · text
“Extends Oxide Gold Silver Mineralization Up To 190 M West”
Extracted facts
Stored fact records: 3. Some facts used in scoring do not have a stored record.
Drill Results (3)
TR26-45Tombstone · goldGrade: 0.52Grade Unit: g/tIntercept: 1158 mView all detailsHide details
Identity
- Hole ID
- TR26-45
- Project
- Tombstone
- Commodity
- gold
- Region
- usa_az
- Reported Region
- usa_az
- Ticker
- AZT
Geometry
- Grade
- 0.52
- Grade Unit
- g/t
- Intercept
- 1158 m
Classification
- Sample Type
- drill
- Group ID
- TR26-45:0-1158
- Mining Method
- open_pit
Location
- Location
- North Extension
- Loc. Source
- document
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-22T00:00:00.000Z
Reasoning: Large width intercept of 1158m at 0.52 g/t Au.
Positive factors
- Significant width
Evidence · text
“1158 M Of 067 Gt Aueq 052 Gt Au 811 Gt Ag in Tr26 45”
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
TR26-45Tombstone · silverGrade: 811Grade Unit: g/tIntercept: 1158 mView all detailsHide details
Identity
- Hole ID
- TR26-45
- Project
- Tombstone
- Commodity
- silver
- Region
- usa_az
- Reported Region
- usa_az
- Ticker
- AZT
Geometry
- Grade
- 811
- Grade Unit
- g/t
- Intercept
- 1158 m
Classification
- Sample Type
- drill
- Group ID
- TR26-45:0-1158
- Mining Method
- open_pit
Location
- Location
- North Extension
- Loc. Source
- document
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-22T00:00:00.000Z
Reasoning: Very high silver grade of 811 g/t over a massive width.
Positive factors
- Exceptional silver grade
Evidence · text
“811 Gt Ag in Tr26 45”
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
TR26-45Tombstone · goldGrade: 0.67Grade Unit: g/tIntercept: 1158 mView all detailsHide details
Identity
- Hole ID
- TR26-45
- Project
- Tombstone
- Commodity
- gold
- Region
- usa_az
- Reported Region
- usa_az
- Ticker
- AZT
Geometry
- Grade
- 0.67
- Grade Unit
- g/t
- Intercept
- 1158 m
Classification
- Sample Type
- drill
- Group ID
- TR26-45:0-1158
- Mining Method
- open_pit
Location
- Location
- North Extension
- Loc. Source
- document
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-22T00:00:00.000Z
Reasoning: Large width intercept of 1158m at 0.67 g/t AuEq.
Positive factors
- Significant width
Evidence · text
“1158 M Of 067 Gt Aueq”
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.