Atico Produces 2.08 Million Pounds of Cu and 2,472 Ounces of Au in Third Quarter 2026

Original announcement by globenewswire on

Company
Atico Mining Corporation
Ticker
ATY
Exchange
Unavailable
Region
Colombia
Primary commodity
Copper
Secondary commodities
Gold
Document categories
Production, Resource update
Extracted
2026-10-22 14:33:37 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Atico Mining Corporation announced its Q3 2026 operating results from the El Roble mine, reporting 2.08 million pounds of copper and 2,472 ounces of gold in concentrates. Gold production increased by 30% and gold head grade by 37% compared to Q3 2025, while copper production decreased by 7%. The company anticipates continued production improvements in the next quarter driven by higher head grades and is advancing a reserves report update expected to increase the mine's life.

Reasoning: Atico Mining reported strong Q3 2026 gold production, grade, and recovery, which positively impacted all-in sustaining cash costs and revenue. While copper production saw a slight decrease, the company anticipates overall production improvements in the next quarter and is working on a reserves update expected to increase the mine's life.

Positive factors

  • Significant increase in gold production and grade
  • Strong gold recovery
  • Increased tonnes processed per day
  • Anticipated continued production improvement in the next quarter
  • Advancing reserves report update with expected increase in life of mine

Negative factors

  • Decrease in copper production
  • Decrease in tonnes of ore mined and processed

Facts used in scoring: 13

Atlas analysis — Atico Mining Corporation: Atico Produces 2.08 Million Pounds of Cu and 2,472 Ounces of Au in Third Quarter 2026. probable 828000 tonnes

Classification and evidence

Production Increase (Gold)positive · Story-specific tag

No canonical definition is currently available.

Why it applies: Gold production increased by 30% over Q3 2025.

Evidence · table

“30”

Context: Gold (ounces)

Grade Improvement (Gold)positive · Story-specific tag

No canonical definition is currently available.

Why it applies: Gold head grade increased by 37% over Q3 2025.

Evidence · table

“37”

Context: Gold grade (g/t)

Recovery Improvement (Gold)positive · Story-specific tag

No canonical definition is currently available.

Why it applies: Gold recovery increased by 11% over Q3 2025.

Evidence · table

“11”

Context: Gold (%)

Production Decrease (Copper)negative · Story-specific tag

No canonical definition is currently available.

Why it applies: Copper production decreased by 7% over Q3 2025.

Evidence · table

“-7”

Context: Copper (000s pounds)

Operational Efficiency Improvementpositive · Story-specific tag

No canonical definition is currently available.

Why it applies: Tonnes processed per day increased by 8% over Q3 2025.

Evidence · table

“8”

Context: Tonnes processed per day

Life of Mine Extension Potentialpositive · Story-specific tag

No canonical definition is currently available.

Why it applies: The company is advancing a reserves report update where they expect an increase in the life of mine.

Evidence · text

“advancing the reserves report update where we expect an increase in the life of mine”

Extracted facts

Stored fact records: 2. Some facts used in scoring do not have a stored record.

Resource Estimates (2)

probableEl Roble mine · copperTonnes: 828000Grade: 2.49Grade Unit: %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
El Roble mine
Commodity
copper
Region
colombia
Reported Region
Colombia
Ticker
ATY

Resource scope

Estimate type
reserve
Reporting standards
ni_43_101
QP Signed
Yes
Resource group id
resource:27f8508d361765c22e4e

Resource Data

Category
probable
Tonnes
828000
Grade
2.49
Grade Unit
%

Prior Estimate

Resource Date
2024-03-12

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2024-03-12T00:00:00.000Z

Dates

Event date
2026-10-22T00:00:00.000Z

Reasoning: The document references a historical Proven and Probable mineral reserve estimate for copper, providing context for the mine's current operations and future potential.

Positive factors

  • Existing proven and probable reserve estimate provides a baseline for mine life

Evidence · text

“Proven and Probable mineral reserves of 828 thousand tonnes averaging 2.49% Cu”

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.6 years before this release

probableEl Roble mine · goldTonnes: 828000Grade: 2.2Grade Unit: g/tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
El Roble mine
Commodity
gold
Region
colombia
Reported Region
Colombia
Ticker
ATY

Resource scope

Estimate type
reserve
Reporting standards
ni_43_101
QP Signed
Yes
Resource group id
resource:27f8508d361765c22e4e

Resource Data

Category
probable
Tonnes
828000
Grade
2.2
Grade Unit
g/t

Prior Estimate

Resource Date
2024-03-12

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2024-03-12T00:00:00.000Z

Dates

Event date
2026-10-22T00:00:00.000Z

Reasoning: The document references a historical Proven and Probable mineral reserve estimate for gold, providing context for the mine's current operations and future potential.

Positive factors

  • Existing proven and probable reserve estimate provides a baseline for mine life

Evidence · text

“2.20 g/t Au”

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.6 years before this release

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.