# AIV: Annual Report to shareholders

Canonical Atlas analysis: https://atlas-aws.minestarters.com/news/aiv-annual-report-to-shareholders--5db4a6a0-28fb-48cb-93b7-901ef7e7a527

Original source: https://www.asx.com.au/asx/v2/statistics/displayAnnouncement.do?display=pdf&idsId=03157880

Publisher: asx

Original announcement: 2026-10-27T05:51:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-10-27T06:45:52.144Z

Atlas analysis updated: 2026-10-27T06:45:52.144Z

- Company: ActivEX Limited

- Ticker: AIV

- Exchange: ASX

- Region: Queensland

- Primary commodity: Unavailable

- Secondary commodities: None reported

- Document categories: Other, Resource update, Agreement transaction

- Extracted: 2026-10-27 06:31:11 UTC

Narrative sentiment: -0.20 · Bearish

## Minestarters Atlas summary

ActivEX Limited's 2026 Annual Report highlights a significant operating loss of $2.15 million and impairment losses of over $2.6 million, leading to a material uncertainty regarding its going concern status. Despite these financial challenges, the company reported a maiden JORC compliant gold resource at its Mt Hogan project \(previously announced\) and made progress on its critical minerals projects in Queensland, including REE and base metals exploration. The company also successfully repaid its loan facility through a debt-to-equity conversion and divested two non-core projects.

Reasoning: The annual report details a significant operating loss and impairment charges, leading to a material uncertainty about the company's ability to continue as a going concern, despite successful debt repayment and progress on critical minerals exploration.

- Positive factor: Debt Repayment

- Positive factor: Divestment of Non-Core Assets

- Positive factor: Progress on Critical Minerals Projects

- Negative factor: Significant Operating Loss

- Negative factor: Impairment Losses

- Negative factor: Material Uncertainty Regarding Going Concern

- Negative factor: Resource Estimate is Re-statement

Facts used in scoring: 3

## Classification and evidence

No classification tags are available.

## Extracted facts

Stored fact records: 1. Some facts used in scoring do not have a stored record.

## Resource Estimates (1)

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/aiv-annual-report-to-shareholders--5db4a6a0-28fb-48cb-93b7-901ef7e7a527#fact-resource-facts-0)

Mt Hogan Gold Project · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Mt Hogan Gold Project
- Commodity: gold
- Region: australia\_qld
- Reported Region: North Queensland
- Ticker: AIV

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Mark Derriman
- Resource group id: resource:c2da0ac87a80c213980f
- Deposit or zone: Mt Hogan
- Ownership percent: 20.95 %
- Resource basis: attributable

#### Resource Data

- Category: inferred
- Tonnes: 8500000
- Grade: 1.13
- Grade Unit: g/t
- Contained Metal: 310000
- Contained Unit: oz
- Cutoff Grade: 0.3
- Cutoff Unit: g/t Au

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2025-07-21T00:00:00.000Z

#### Dates

- Event date: 2026-10-27T00:00:00.000Z

Reasoning: The resource is a maiden JORC compliant estimate, providing a baseline for the project, but it is entirely in the Inferred category and was previously announced in July 2025.

- Positive factor: Maiden Resource

- Positive factor: JORC Compliant

- Positive factor: QP/CP Signed

- Negative factor: All Inferred

- Negative factor: Stale Estimate

Evidence · text

> The Group’s Maiden JORC Compliant Gold Resource was completed in collaboration with JV Partner Gilberton Gold Pty Ltd Mineral Estimate comprising 8,500,000t @ 1.13g/t Au for 310,000oz Au at a 0.3g/t cutoff. Drilling is planned to recommence in late Q3 2025 / early Q4 2025 and will focus along the southern margin of the Mt Hogan Granite to follow up drilling completed in November 2024. For details refer to the ASX announcement “Maiden Gold Mineral Resource Estimate” dated 21 July 2025.

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
