ABR: Exploration, Mining and Petroleum Conference Presentation
Original announcement by asx on
- Company
- Albright Metals Limited
- Ticker
- ABR
- Exchange
- ASX
- Region
- Unavailable
- Primary commodity
- Gold
- Secondary commodities
- Copper, Antimony
- Document categories
- Resource update, Other
- Extracted
- 2026-10-26 08:11:29 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Albright Metals presented its 2026 conference update, headlined by the Mineral Resource estimate for the Vail Road Gold Deposit. The resource totals 188kt at 9.0 g/t Au, with a significant Indicated component of 33.5kt at 20.9 g/t Au.
Reasoning: The presentation highlights a significant Mineral Resource estimate for the Vail Road Gold Deposit, establishing a high-grade baseline for the project.
Positive factors
- High-grade gold resource established at Vail Road
- Indicated category provides significant geological confidence
- Presence of copper as a byproduct
Facts used in scoring: 28

Classification and evidence
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: The resource includes 33.5kt of Indicated category at Vail Road.
Evidence · text
“Indicated category 33.5kt @ 20.9 g/t Au”
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The resource includes 154.6kt of Inferred category at Vail Road.
Evidence · text
“Inferred category 154.6kt @ 6.4 g/t Au”
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: Competent Persons Ms Gemma Lee and Mr Lauritz Barnes are named and sign off on the resource.
Evidence · text
“Mr Barnes is the Competent Person for the estimation and Ms Lee is the Competent Person for the database”
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: The resource is reported at a 2 g/t Au cut-off grade.
Evidence · text
“Mineral Resource reported at 2 g/t Au cut-off grade”
Extracted facts
Stored fact records: 28. Some facts used in scoring do not have a stored record.
Resource Estimates (28)
indicatedVail Road · goldTonnes: 33500Grade: 20.9Grade Unit: g/tContained Metal: 22500Contained Unit: ozsView all detailsHide details
Identity
- Project
- Vail Road
- Commodity
- gold
- Ticker
- ABR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Lauritz Barnes, Gemma Lee
- Resource group id
- resource:cd1667987237ae27c7a3
- Deposit or zone
- Subtotal
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- indicated
- Tonnes
- 33500
- Grade
- 20.9
- Grade Unit
- g/t
- Contained Metal
- 22500
- Contained Unit
- ozs
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-29
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: Indicated subtotal for the Vail Road deposit showing strong grade.
Positive factors
- High grade of 20.9 g/t Au
Evidence · table
“20.9”
Context: 33.5
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
indicatedVail Road Gold Deposit · goldTonnes: 33500Grade: 20.9Grade Unit: g/tContained Metal: 22500Contained Unit: ozsView all detailsHide details
Identity
- Project
- Vail Road Gold Deposit
- Commodity
- gold
- Ticker
- ABR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Lauritz Barnes, Gemma Lee
- Resource group id
- resource:ce3b42218d044460ffdb
- Deposit or zone
- Main
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- indicated
- Tonnes
- 33500
- Grade
- 20.9
- Grade Unit
- g/t
- Contained Metal
- 22500
- Contained Unit
- ozs
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-29
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: Indicated resource for the Main zone.
Positive factors
- High grade of 31.1 g/t Au in Main zone
Evidence · table
“31.1”
Context: 11.1
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
indicatedVail Road Gold Deposit · goldTonnes: 33500Grade: 20.9Grade Unit: g/tContained Metal: 22500Contained Unit: ozsView all detailsHide details
Identity
- Project
- Vail Road Gold Deposit
- Commodity
- gold
- Ticker
- ABR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Lauritz Barnes, Gemma Lee
- Resource group id
- resource:c531ddf7601d49097715
- Deposit or zone
- Middle
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- indicated
- Tonnes
- 33500
- Grade
- 20.9
- Grade Unit
- g/t
- Contained Metal
- 22500
- Contained Unit
- ozs
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-29
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: Indicated resource for the Middle zone.
Positive factors
- Solid grade of 19.5 g/t Au
Evidence · table
“19.5”
Context: 10.4
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
indicatedVail Road Gold Deposit · goldTonnes: 33500Grade: 20.9Grade Unit: g/tContained Metal: 22500Contained Unit: ozsView all detailsHide details
Identity
- Project
- Vail Road Gold Deposit
- Commodity
- gold
- Ticker
- ABR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Lauritz Barnes, Gemma Lee
- Resource group id
- resource:0f59dc399c06fa79b8af
- Deposit or zone
- Parallel
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- indicated
- Tonnes
- 33500
- Grade
- 20.9
- Grade Unit
- g/t
- Contained Metal
- 22500
- Contained Unit
- ozs
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-29
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: Indicated resource for the Parallel zone.
Positive factors
- Grade of 12.7 g/t Au
Evidence · table
“12.7”
Context: 11.9
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredVail Road · goldTonnes: 154600Grade: 6.4Grade Unit: g/tContained Metal: 31700Contained Unit: ozsView all detailsHide details
Identity
- Project
- Vail Road
- Commodity
- gold
- Ticker
- ABR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Lauritz Barnes, Gemma Lee
- Resource group id
- resource:2f4bc5cb7782469f6c4d
- Deposit or zone
- Subtotal
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- inferred
- Tonnes
- 154600
- Grade
- 6.4
- Grade Unit
- g/t
- Contained Metal
- 31700
- Contained Unit
- ozs
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-29
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: Inferred subtotal for the Vail Road deposit.
Positive factors
- Significant tonnage in Inferred category
Negative factors
- Inferred category limits economic confidence
Evidence · table
“6.4”
Context: 154.6
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredVail Road Gold Deposit · goldTonnes: 154600Grade: 6.4Grade Unit: g/tContained Metal: 31700Contained Unit: ozsView all detailsHide details
Identity
- Project
- Vail Road Gold Deposit
- Commodity
- gold
- Ticker
- ABR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Lauritz Barnes, Gemma Lee
- Resource group id
- resource:8f56da77f79ed1da1c11
- Deposit or zone
- Main
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- inferred
- Tonnes
- 154600
- Grade
- 6.4
- Grade Unit
- g/t
- Contained Metal
- 31700
- Contained Unit
- ozs
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-29
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: Inferred resource for the Main zone.
Positive factors
- Grade of 4.0 g/t Au
Negative factors
- Inferred category
Evidence · table
“4.0”
Context: 42.2
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredVail Road Gold Deposit · goldTonnes: 154600Grade: 6.4Grade Unit: g/tContained Metal: 31700Contained Unit: ozsView all detailsHide details
Identity
- Project
- Vail Road Gold Deposit
- Commodity
- gold
- Ticker
- ABR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Lauritz Barnes, Gemma Lee
- Resource group id
- resource:d14b644fa8f4376b35f6
- Deposit or zone
- Middle
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- inferred
- Tonnes
- 154600
- Grade
- 6.4
- Grade Unit
- g/t
- Contained Metal
- 31700
- Contained Unit
- ozs
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-29
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: Inferred resource for the Middle zone.
Positive factors
- Grade of 10.0 g/t Au
Negative factors
- Inferred category
Evidence · table
“10.0”
Context: 6.8
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredVail Road Gold Deposit · goldTonnes: 154600Grade: 6.4Grade Unit: g/tContained Metal: 31700Contained Unit: ozsView all detailsHide details
Identity
- Project
- Vail Road Gold Deposit
- Commodity
- gold
- Ticker
- ABR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Lauritz Barnes, Gemma Lee
- Resource group id
- resource:9547dc8027f805ef18ad
- Deposit or zone
- Parallel
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- inferred
- Tonnes
- 154600
- Grade
- 6.4
- Grade Unit
- g/t
- Contained Metal
- 31700
- Contained Unit
- ozs
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-29
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: Inferred resource for the Parallel zone.
Positive factors
- Grade of 7.1 g/t Au
Negative factors
- Inferred category
Evidence · table
“7.1”
Context: 105.6
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
indicatedVail Road · copperTonnes: 33500Grade: 3107Grade Unit: ppmView all detailsHide details
Identity
- Project
- Vail Road
- Commodity
- copper
- Ticker
- ABR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Lauritz Barnes, Gemma Lee
- Resource group id
- resource:cd1667987237ae27c7a3
- Deposit or zone
- Subtotal
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- indicated
- Tonnes
- 33500
- Grade
- 3107
- Grade Unit
- ppm
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-29
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: Indicated copper subtotal for Vail Road.
Positive factors
- Copper byproduct present
Evidence · table
“3107”
Context: 33.5
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
indicatedVail Road Gold Deposit · copperTonnes: 33500Grade: 3107Grade Unit: ppmView all detailsHide details
Identity
- Project
- Vail Road Gold Deposit
- Commodity
- copper
- Ticker
- ABR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Lauritz Barnes, Gemma Lee
- Resource group id
- resource:ce3b42218d044460ffdb
- Deposit or zone
- Main
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- indicated
- Tonnes
- 33500
- Grade
- 3107
- Grade Unit
- ppm
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-29
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: Indicated copper for the Main zone.
Positive factors
- Copper grade of 4010 ppm in Main zone
Evidence · table
“4010”
Context: 11.1
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
indicatedVail Road Gold Deposit · copperTonnes: 33500Grade: 3107Grade Unit: ppmView all detailsHide details
Identity
- Project
- Vail Road Gold Deposit
- Commodity
- copper
- Ticker
- ABR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Lauritz Barnes, Gemma Lee
- Resource group id
- resource:c531ddf7601d49097715
- Deposit or zone
- Middle
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- indicated
- Tonnes
- 33500
- Grade
- 3107
- Grade Unit
- ppm
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-29
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: Indicated copper for the Middle zone.
Positive factors
- Copper grade of 3338 ppm in Middle zone
Evidence · table
“3338”
Context: 10.4
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
indicatedVail Road Gold Deposit · copperTonnes: 33500Grade: 3107Grade Unit: ppmView all detailsHide details
Identity
- Project
- Vail Road Gold Deposit
- Commodity
- copper
- Ticker
- ABR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Lauritz Barnes, Gemma Lee
- Resource group id
- resource:0f59dc399c06fa79b8af
- Deposit or zone
- Parallel
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- indicated
- Tonnes
- 33500
- Grade
- 3107
- Grade Unit
- ppm
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-29
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: Indicated copper for the Parallel zone.
Positive factors
- Copper grade of 2067 ppm in Parallel zone
Evidence · table
“2067”
Context: 11.9
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredVail Road · copperTonnes: 154600Grade: 1545Grade Unit: ppmView all detailsHide details
Identity
- Project
- Vail Road
- Commodity
- copper
- Ticker
- ABR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Lauritz Barnes, Gemma Lee
- Resource group id
- resource:2f4bc5cb7782469f6c4d
- Deposit or zone
- Subtotal
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- inferred
- Tonnes
- 154600
- Grade
- 1545
- Grade Unit
- ppm
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-29
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: Inferred copper subtotal for Vail Road.
Positive factors
- Copper byproduct present
Evidence · table
“1545”
Context: 154.6
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredVail Road Gold Deposit · copperTonnes: 154600Grade: 1823Grade Unit: ppmView all detailsHide details
Identity
- Project
- Vail Road Gold Deposit
- Commodity
- copper
- Ticker
- ABR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Lauritz Barnes, Gemma Lee
- Resource group id
- resource:8f56da77f79ed1da1c11
- Deposit or zone
- Main
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- inferred
- Tonnes
- 154600
- Grade
- 1823
- Grade Unit
- ppm
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-29
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: Inferred copper for the Main zone.
Positive factors
- Copper grade of 1881 ppm in Main zone
Negative factors
- Inferred category
Evidence · table
“1881”
Context: 42.2
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredVail Road Gold Deposit · copperTonnes: 154600Grade: 1823Grade Unit: ppmView all detailsHide details
Identity
- Project
- Vail Road Gold Deposit
- Commodity
- copper
- Ticker
- ABR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Lauritz Barnes, Gemma Lee
- Resource group id
- resource:d14b644fa8f4376b35f6
- Deposit or zone
- Middle
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- inferred
- Tonnes
- 154600
- Grade
- 1823
- Grade Unit
- ppm
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-29
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: Inferred copper for the Middle zone.
Positive factors
- Copper grade of 1797 ppm in Middle zone
Negative factors
- Inferred category
Evidence · table
“1797”
Context: 6.8
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredVail Road Gold Deposit · copperTonnes: 154600Grade: 1823Grade Unit: ppmView all detailsHide details
Identity
- Project
- Vail Road Gold Deposit
- Commodity
- copper
- Ticker
- ABR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Lauritz Barnes, Gemma Lee
- Resource group id
- resource:9547dc8027f805ef18ad
- Deposit or zone
- Parallel
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- inferred
- Tonnes
- 154600
- Grade
- 1823
- Grade Unit
- ppm
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-29
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: Inferred copper for the Parallel zone.
Positive factors
- Copper grade of 1395 ppm in Parallel zone
Negative factors
- Inferred category
Evidence · table
“1395”
Context: 105.6
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
indicatedVail Road · goldTonnes: 11100Grade: 31.1Grade Unit: g/tView all detailsHide details
Identity
- Project
- Vail Road
- Commodity
- gold
- Ticker
- ABR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Lauritz Barnes, Gemma Lee
- Resource group id
- resource:a80323cc2d4278c827a2
- Deposit or zone
- Main
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- indicated
- Tonnes
- 11100
- Grade
- 31.1
- Grade Unit
- g/t
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-29
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: Indicated subtotal for the Vail Road deposit showing strong grade. (Expanded from multi-commodity resource table for completeness.)
Positive factors
- High grade of 20.9 g/t Au
Evidence · table
“31.1”
Context: 11.1
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
indicatedVail Road · copperTonnes: 11100Grade: 4010Grade Unit: ppmView all detailsHide details
Identity
- Project
- Vail Road
- Commodity
- copper
- Ticker
- ABR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Lauritz Barnes, Gemma Lee
- Resource group id
- resource:a80323cc2d4278c827a2
- Deposit or zone
- Main
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- indicated
- Tonnes
- 11100
- Grade
- 4010
- Grade Unit
- ppm
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-29
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: Indicated subtotal for the Vail Road deposit showing strong grade. (Expanded from multi-commodity resource table for completeness.)
Positive factors
- High grade of 20.9 g/t Au
Evidence · table
“4010”
Context: 11.1
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
indicatedVail Road · goldTonnes: 10400Grade: 19.5Grade Unit: g/tView all detailsHide details
Identity
- Project
- Vail Road
- Commodity
- gold
- Ticker
- ABR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Lauritz Barnes, Gemma Lee
- Resource group id
- resource:ee4a8279a7e967b30c1c
- Deposit or zone
- Middle
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- indicated
- Tonnes
- 10400
- Grade
- 19.5
- Grade Unit
- g/t
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-29
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: Indicated subtotal for the Vail Road deposit showing strong grade. (Expanded from multi-commodity resource table for completeness.)
Positive factors
- High grade of 20.9 g/t Au
Evidence · table
“19.5”
Context: 10.4
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
indicatedVail Road · copperTonnes: 10400Grade: 3338Grade Unit: ppmView all detailsHide details
Identity
- Project
- Vail Road
- Commodity
- copper
- Ticker
- ABR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Lauritz Barnes, Gemma Lee
- Resource group id
- resource:ee4a8279a7e967b30c1c
- Deposit or zone
- Middle
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- indicated
- Tonnes
- 10400
- Grade
- 3338
- Grade Unit
- ppm
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-29
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: Indicated subtotal for the Vail Road deposit showing strong grade. (Expanded from multi-commodity resource table for completeness.)
Positive factors
- High grade of 20.9 g/t Au
Evidence · table
“3338”
Context: 10.4
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
indicatedVail Road · goldTonnes: 11900Grade: 12.7Grade Unit: g/tView all detailsHide details
Identity
- Project
- Vail Road
- Commodity
- gold
- Ticker
- ABR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Lauritz Barnes, Gemma Lee
- Resource group id
- resource:3e647e1c69f3afa49c66
- Deposit or zone
- Parallel
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- indicated
- Tonnes
- 11900
- Grade
- 12.7
- Grade Unit
- g/t
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-29
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: Indicated subtotal for the Vail Road deposit showing strong grade. (Expanded from multi-commodity resource table for completeness.)
Positive factors
- High grade of 20.9 g/t Au
Evidence · table
“12.7”
Context: 11.9
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
indicatedVail Road · copperTonnes: 11900Grade: 2067Grade Unit: ppmView all detailsHide details
Identity
- Project
- Vail Road
- Commodity
- copper
- Ticker
- ABR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Lauritz Barnes, Gemma Lee
- Resource group id
- resource:3e647e1c69f3afa49c66
- Deposit or zone
- Parallel
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- indicated
- Tonnes
- 11900
- Grade
- 2067
- Grade Unit
- ppm
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-29
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: Indicated subtotal for the Vail Road deposit showing strong grade. (Expanded from multi-commodity resource table for completeness.)
Positive factors
- High grade of 20.9 g/t Au
Evidence · table
“2067”
Context: 11.9
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredVail Road · goldTonnes: 42200Grade: 4Grade Unit: g/tView all detailsHide details
Identity
- Project
- Vail Road
- Commodity
- gold
- Ticker
- ABR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Lauritz Barnes, Gemma Lee
- Resource group id
- resource:88eac18ee6913ce80191
- Deposit or zone
- Main
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- inferred
- Tonnes
- 42200
- Grade
- 4
- Grade Unit
- g/t
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-29
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: Inferred subtotal for the Vail Road deposit. (Expanded from multi-commodity resource table for completeness.)
Positive factors
- Significant tonnage in Inferred category
Negative factors
- Inferred category limits economic confidence
Evidence · table
“4.0”
Context: 42.2
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredVail Road · copperTonnes: 42200Grade: 1881Grade Unit: ppmView all detailsHide details
Identity
- Project
- Vail Road
- Commodity
- copper
- Ticker
- ABR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Lauritz Barnes, Gemma Lee
- Resource group id
- resource:88eac18ee6913ce80191
- Deposit or zone
- Main
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- inferred
- Tonnes
- 42200
- Grade
- 1881
- Grade Unit
- ppm
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-29
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: Inferred subtotal for the Vail Road deposit. (Expanded from multi-commodity resource table for completeness.)
Positive factors
- Significant tonnage in Inferred category
Negative factors
- Inferred category limits economic confidence
Evidence · table
“1881”
Context: 42.2
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredVail Road · goldTonnes: 6800Grade: 10Grade Unit: g/tView all detailsHide details
Identity
- Project
- Vail Road
- Commodity
- gold
- Ticker
- ABR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Lauritz Barnes, Gemma Lee
- Resource group id
- resource:d13a38655519f08d101c
- Deposit or zone
- Middle
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- inferred
- Tonnes
- 6800
- Grade
- 10
- Grade Unit
- g/t
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-29
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: Inferred subtotal for the Vail Road deposit. (Expanded from multi-commodity resource table for completeness.)
Positive factors
- Significant tonnage in Inferred category
Negative factors
- Inferred category limits economic confidence
Evidence · table
“10.0”
Context: 6.8
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredVail Road · copperTonnes: 6800Grade: 1797Grade Unit: ppmView all detailsHide details
Identity
- Project
- Vail Road
- Commodity
- copper
- Ticker
- ABR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Lauritz Barnes, Gemma Lee
- Resource group id
- resource:d13a38655519f08d101c
- Deposit or zone
- Middle
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- inferred
- Tonnes
- 6800
- Grade
- 1797
- Grade Unit
- ppm
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-29
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: Inferred subtotal for the Vail Road deposit. (Expanded from multi-commodity resource table for completeness.)
Positive factors
- Significant tonnage in Inferred category
Negative factors
- Inferred category limits economic confidence
Evidence · table
“1797”
Context: 6.8
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredVail Road · goldTonnes: 105600Grade: 7.1Grade Unit: g/tView all detailsHide details
Identity
- Project
- Vail Road
- Commodity
- gold
- Ticker
- ABR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Lauritz Barnes, Gemma Lee
- Resource group id
- resource:1dd7ef5a23793b2287d6
- Deposit or zone
- Parallel
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- inferred
- Tonnes
- 105600
- Grade
- 7.1
- Grade Unit
- g/t
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-29
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: Inferred subtotal for the Vail Road deposit. (Expanded from multi-commodity resource table for completeness.)
Positive factors
- Significant tonnage in Inferred category
Negative factors
- Inferred category limits economic confidence
Evidence · table
“7.1”
Context: 105.6
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredVail Road · copperTonnes: 105600Grade: 1395Grade Unit: ppmView all detailsHide details
Identity
- Project
- Vail Road
- Commodity
- copper
- Ticker
- ABR
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Lauritz Barnes, Gemma Lee
- Resource group id
- resource:1dd7ef5a23793b2287d6
- Deposit or zone
- Parallel
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- inferred
- Tonnes
- 105600
- Grade
- 1395
- Grade Unit
- ppm
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-29
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: Inferred subtotal for the Vail Road deposit. (Expanded from multi-commodity resource table for completeness.)
Positive factors
- Significant tonnage in Inferred category
Negative factors
- Inferred category limits economic confidence
Evidence · table
“1395”
Context: 105.6
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.