# Mining News in Southwestern Bolivia

Canonical page: https://atlas-aws.minestarters.com/news?regions=southwestern+bolivia

Atlas summarizes and classifies mining-industry stories from third-party publishers. Follow each source link for the original reporting.

Results: 41
Returned: 10
Coverage: drill results, resource updates, and metallurgy; primary commodity matching; all time unless dates are supplied.
Region: Bolivia (bolivia)
Applied filters: {"regions":["bolivia"],"document_types":["drill_results","resource_update","metallurgy"],"document_type_match":"any"}
Sort: published_at desc
Offset: 0; page size: 10


[Next page](https://atlas-aws.minestarters.com/news.md?regions=southwestern+bolivia&page=2&page_size=10)

## BP Silver Discovers High-Grade Silver at Jalsuri Northeast, Intersecting 2,620 g/t Silver (84.2 oz/t) over 1 Meter Within a 12-Meter Interval Grading 441 g/t Silver (14.2 oz/t) at Cosuño Silver Project

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/bp-silver-discovers-high-grade-silver-at-jalsuri-northeast-intersecting-2-620-g--5ee9d4b0-13cf-42b8-a1b7-19f5157865bc) · [Markdown](https://atlas-aws.minestarters.com/news/bp-silver-discovers-high-grade-silver-at-jalsuri-northeast-intersecting-2-620-g--5ee9d4b0-13cf-42b8-a1b7-19f5157865bc.md)
- Original announcement: 2026-11-17T21:41:24.000Z
- Atlas analysis published: 2026-11-17T12:31:44.373Z
- Atlas analysis updated: 2026-11-17T12:31:44.373Z
- Company: BP Silver Corp. (BPAG)
- Original source: [jmn](https://www.juniorminingnetwork.com/junior-miner-news/press-releases/3444-tsx-venture/bpag/214948-bp-silver-corp-discovers-high-grade-silver-at-jalsuri-northeast-intersecting-2-620-g-t-silver-84-2-oz-t-over-1-meter-within-a-12-meter-interval-grading-441-g-t-silver-14-2-oz-t-at-cosuno-silver-project.html)
- Atlas sentiment: 0.578
- Atlas tags: QA/QC Disclosed, Apparent Width Only

BP Silver has announced high-grade silver discovery at the Jalsuri Northeast target within the Cosuño Silver Project in Bolivia. Drill hole CO-0023 returned an exceptional 1 m intercept of 2,620 g/t silver, marking the highest grade recorded at the project to date.

## BP Silver Corp. Discovers High-Grade Silver at Jalsuri Northeast, Intersecting 2,620 g/t Silver (84.2 oz/t) over 1 Meter Within a 12-Meter Interval Grading 441 g/t Silver (14.2 oz/t) at Cosu&#xF1;o Silver Project

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/bp-silver-corp-discovers-high-grade-silver-at-jalsuri-northeast-intersecting-2-6--8dd4350e-4188-46a5-acdb-88d25607126d) · [Markdown](https://atlas-aws.minestarters.com/news/bp-silver-corp-discovers-high-grade-silver-at-jalsuri-northeast-intersecting-2-6--8dd4350e-4188-46a5-acdb-88d25607126d.md)
- Original announcement: 2026-11-17T12:00:00.000Z
- Atlas analysis published: 2026-11-17T12:46:26.981Z
- Atlas analysis updated: 2026-11-17T12:46:26.981Z
- Company: BP Silver Corp. (BPAG.V)
- Original source: [orestocks](https://orestocks.com/company/BPAG.V/press-releases/6451319872343977)
- Atlas sentiment: 0.578
- Atlas tags: QA/QC Disclosed, Apparent Width Only

BP Silver Corp. has announced high-grade silver discovery at the Jalsuri Northeast target within the Cosuño Silver Project in Bolivia. Drill hole CO-0023 returned an exceptional 1 m intercept of 2,620 g/t silver, part of a broader 12 m zone grading 441 g/t silver. The mineralization is open at depth and along strike, with associated zinc and lead values noted.

## News Release

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/news-release--b874d428-ba00-466a-ba66-c19caf86a5d1) · [Markdown](https://atlas-aws.minestarters.com/news/news-release--b874d428-ba00-466a-ba66-c19caf86a5d1.md)
- Original announcement: 2026-11-17T02:11:06.000Z
- Atlas analysis published: 2026-11-17T03:31:28.425Z
- Atlas analysis updated: 2026-11-17T03:31:28.425Z
- Company: Cartier Silver Corporation (CFE)
- Original source: [cse](https://webfiles-primary.thecse.com/news_releases/en/4740/d18a9087-f50f-4862-84b4-2aa54907685c)
- Atlas sentiment: 0.727
- Atlas tags: Bonanza Intercept, True Width Disclosed, Step-Out Extension, QA/QC Disclosed, Metal Equivalent Opaque, Infill Drilling, Qualified Person

Cartier Silver announced high-grade polymetallic drill results from its Gonalbert Property in Southern Bolivia, including the highest grade interval to date in drillhole DGL-06. This intercept returned 1,418.9 g/t AgEq (632 g/t Ag, 30.05% Pb, 15.45% Zn) over 0.77 metres from the newly explored Igneous Complex. The drilling program aims to define the scale and extent of high-grade veins and support a planned initial Mineral Resource estimate in 2027.

## Silver Elephant to Submit Environmental Impact Assessment for 12,000 Tonne-per-Day Pulacayo-Paca Processing Plant; Environmental License Decision Expected by June 2027

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/silver-elephant-to-submit-environmental-impact-assessment-for-12-000-tonne-per-d--a499fa52-0b06-420a-9380-fb6c91a9920a) · [Markdown](https://atlas-aws.minestarters.com/news/silver-elephant-to-submit-environmental-impact-assessment-for-12-000-tonne-per-d--a499fa52-0b06-420a-9380-fb6c91a9920a.md)
- Original announcement: 2026-11-13T13:30:00.000Z
- Atlas analysis published: 2026-11-13T14:31:55.409Z
- Atlas analysis updated: 2026-11-13T14:31:55.409Z
- Company: Silver Elephant Mining Corp. (ELEF)
- Original source: [tmx](https://money.tmx.com/en/quote/ELEF/news/8571326662064739/silver-elephant-to-submit-environmental-impact-assessment-for-12-000-tonne-per-d)
- Atlas sentiment: 0.218
- Atlas tags: NI 43-101 Compliant, Stale Estimate

Silver Elephant is preparing to submit an Environmental Impact Assessment for a proposed 12,000 tonne-per-day processing plant at the Pulacayo-Paca project in Bolivia by December 2026. An environmental license decision is anticipated by mid-2027. The announcement also restates the 2020 Mineral Resource Estimate for the project.

## Silver Elephant Mining to Submit Environmental Impact Assessment for 12,000 Tonne-per-Day Pulacayo-Paca Processing Plant; Environmental License Decision Expected by June 2027

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/silver-elephant-mining-to-submit-environmental-impact-assessment-for-12-000-tonn--460f64cc-b50e-4bb0-bf1d-34164aaa57a2) · [Markdown](https://atlas-aws.minestarters.com/news/silver-elephant-mining-to-submit-environmental-impact-assessment-for-12-000-tonn--460f64cc-b50e-4bb0-bf1d-34164aaa57a2.md)
- Original announcement: 2026-11-13T04:03:14.000Z
- Atlas analysis published: 2026-11-13T14:31:09.071Z
- Atlas analysis updated: 2026-11-13T14:31:09.071Z
- Company: Silver Elephant Mining Corp. (ELEF)
- Original source: [jmn](https://www.juniorminingnetwork.com/junior-miner-news/press-releases/693-tsx/elef/214768-silver-elephant-to-submit-environmental-impact-assessment-for-12-000-tonne-per-day-pulacayo-paca-processing-plant-environmental-license-decision-expected-by-june-2027.html)
- Atlas sentiment: 0.218
- Atlas tags: NI 43-101 Compliant, Stale Estimate

Silver Elephant Mining Corp. is preparing to submit a detailed Environmental Impact Assessment (EEIA-AI) for its proposed 12,000 tpd Pulacayo-Paca processing plant in Bolivia by the end of December 2026. An environmental license decision is anticipated by mid-2027. The announcement also includes a restatement of the 2020 Mineral Resource Estimate for the Pulacayo and Paca deposits.

## Santacruz Silver: Bolivar Back on Track, Targeting Profitable Growth in 2027

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/santacruz-silver-bolivar-back-on-track-targeting-profitable-growth-in-2027--ec6d8b24-95e9-4082-8938-ababb9c49e1d) · [Markdown](https://atlas-aws.minestarters.com/news/santacruz-silver-bolivar-back-on-track-targeting-profitable-growth-in-2027--ec6d8b24-95e9-4082-8938-ababb9c49e1d.md)
- Original announcement: 2026-11-13T00:00:00.000Z
- Atlas analysis published: 2026-11-12T18:16:52.009Z
- Atlas analysis updated: 2026-11-12T18:16:52.009Z
- Company: Santacruz Silver Mining Ltd. (SCZ)
- Original source: [cruxinvestor](https://www.cruxinvestor.com/posts/santacruz-silver-bolivar-back-on-track-targeting-profitable-growth-in-2027)
- Atlas sentiment: 0.354
- Atlas tags: Production Increase, Recovery Improvement, Heap Leach Route, Single Domain Only

Santacruz Silver reports a strong third quarter 2026, highlighted by a 19% increase in silver output at the Bolivar mine following successful dewatering. The company is leveraging a $130 million treasury to target 20% growth in profitable ounces for 2027 through operational efficiencies and potential acquisitions.

## ORVANA COMPLETES REPAYMENT OF EMIPA BONDS I, PROVIDES UPDATE ON ITS BOLIVIAN SUBSIDIARY, AND ANNOUNCES PARTICIPATION IN THE 2026 PRECIOUS METALS SUMMIT IN ZURICH

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/orvana-completes-repayment-of-emipa-bonds-i-provides-update-on-its-bolivian-subs--9b7bc843-6c5a-41ef-8399-58ba5198bf75) · [Markdown](https://atlas-aws.minestarters.com/news/orvana-completes-repayment-of-emipa-bonds-i-provides-update-on-its-bolivian-subs--9b7bc843-6c5a-41ef-8399-58ba5198bf75.md)
- Original announcement: 2026-11-09T11:00:00.000Z
- Atlas analysis published: 2026-11-09T11:31:38.811Z
- Atlas analysis updated: 2026-11-09T11:31:38.811Z
- Company: Orvana Minerals Corp. (ORV.TO)
- Original source: [orestocks](https://orestocks.com/company/ORV.TO/press-releases/8381009104980763)
- Atlas sentiment: 0.236
- Atlas tags: Debt Repayment, Covenant Breach, Single Domain Only

Orvana Minerals has fully repaid its EMIPA Bonds I and reported positive October 2026 production results for the Don Mario operation in Bolivia. While throughput is increasing toward design capacity, the company is still working through a cure period to restore compliance with financial covenants related to EMIPA Bonds II.

## Orvana Minerals Completes Repayment of EMIPA Bonds I, Provides Update On Its Bolivian Subsidiary, And Announces Participation In The 2026 Precious Metals Summit In Zurich

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/orvana-minerals-completes-repayment-of-emipa-bonds-i-provides-update-on-its-boli--f9929a7b-3015-4bf1-8ea7-4704df69ef32) · [Markdown](https://atlas-aws.minestarters.com/news/orvana-minerals-completes-repayment-of-emipa-bonds-i-provides-update-on-its-boli--f9929a7b-3015-4bf1-8ea7-4704df69ef32.md)
- Original announcement: 2026-11-09T00:00:00.000Z
- Atlas analysis published: 2026-11-09T12:31:59.771Z
- Atlas analysis updated: 2026-11-09T12:31:59.771Z
- Company: Orvana Minerals Corp. (ORV)
- Original source: [jmn](https://www.juniorminingnetwork.com/junior-miner-news/press-releases/511-tsx/orv/214381-orvana-completes-repayment-of-emipa-bonds-i-provides-update-on-its-bolivian-subsidiary-and-announces-participation-in-the-2026-precious-metals-summit-in-zurich.html)
- Atlas sentiment: 0.236
- Atlas tags: Debt Repayment, Financial Covenant Breach, Single Domain Only

Orvana Minerals has fully repaid its EMIPA Bonds I at maturity and is reporting positive production trends at the Don Mario operation in Bolivia. While the company is ramping up throughput at the Oxides Stockpile Project, it remains in a cure period to restore compliance with financial covenants related to its outstanding EMIPA Bonds II.

## Silver Elephant Reclaims Pulacayo-Paca Silver Mining Project Following Favorable Ruling by Bolivian Supreme Tribunal of Justice

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/silver-elephant-reclaims-pulacayo-paca-silver-mining-project-following-favorable--13cc5cbd-26aa-4083-9d02-86e777eca535) · [Markdown](https://atlas-aws.minestarters.com/news/silver-elephant-reclaims-pulacayo-paca-silver-mining-project-following-favorable--13cc5cbd-26aa-4083-9d02-86e777eca535.md)
- Original announcement: 2026-11-06T15:04:00.000Z
- Atlas analysis published: 2026-11-06T15:45:46.475Z
- Atlas analysis updated: 2026-11-06T15:45:46.475Z
- Company: Silver Elephant Mining Corp. (ELEF.TO)
- Original source: [orestocks](https://orestocks.com/company/ELEF.TO/press-releases/8977653671485322)
- Atlas sentiment: 0.514
- Atlas tags: NI 43-101 Compliant, Stale Estimate

Silver Elephant has reclaimed its Pulacayo-Paca silver mining project following a favorable ruling by the Bolivian Supreme Tribunal of Justice, which annulled the previous cancellation of its mining production contract. The ruling reinstates the company's exclusive rights to develop the project for up to 30 years. The announcement also restates historical mineral resource estimates from 2020.

## Silver Elephant Mining Reclaims Pulacayo-Paca Silver Mining Project Following Favorable Ruling by Bolivian Supreme Tribunal of Justice

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/silver-elephant-mining-reclaims-pulacayo-paca-silver-mining-project-following-fa--bef93614-ba82-49b1-bdb8-65016bcae24e) · [Markdown](https://atlas-aws.minestarters.com/news/silver-elephant-mining-reclaims-pulacayo-paca-silver-mining-project-following-fa--bef93614-ba82-49b1-bdb8-65016bcae24e.md)
- Original announcement: 2026-11-06T03:06:23.000Z
- Atlas analysis published: 2026-11-06T16:31:33.901Z
- Atlas analysis updated: 2026-11-06T16:31:33.901Z
- Company: Silver Elephant Mining Corp. (ELEF)
- Original source: [jmn](https://www.juniorminingnetwork.com/junior-miner-news/press-releases/693-tsx/elef/214354-silver-elephant-reclaims-pulacayo-paca-silver-mining-project-following-favorable-ruling-by-bolivian-supreme-tribunal-of-justice.html)
- Atlas sentiment: 0.748
- Atlas tags: Favorable Legal Ruling, NI 43-101 Compliant, QP/CP Signed, Cut-off Disclosed, Historical Estimate Only, Stale Estimate, Inferred Resource, Indicated Resource

Silver Elephant Mining has successfully reclaimed its Pulacayo-Paca silver mining project in Bolivia after a favorable ruling by the Bolivian Supreme Tribunal of Justice. The ruling annuls the prior cancellation of the Mining Production Contract, granting the company exclusive development and mining rights for up to 30 years. The announcement also provides details of a previously reported, historical mineral resource estimate for the project, effective October 13, 2020, which includes significant indicated and inferred silver, zinc, and lead resources.

# Atlas tag definitions

- **Bonanza Intercept:** Exceptionally high-grade zone, well above the deposit-type norm.
- **True Width Disclosed:** Actual thickness perpendicular to structure is stated, not just downhole length.
- **Step-Out Extension:** Mineralization extended beyond the previously known limit.
- **QA/QC Disclosed:** Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
- **Compositing Transparent:** Cut-off grade and internal dilution rules are clearly stated for reported intervals.
- **Refractory Ore:** Complex mineralogy requiring oxidation or other special processing before recovery.
- **Apparent Width Only:** Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
- **Stale Data Re-release:** Historical results re-announced with no new assays or reinterpretation — low genuine novelty.
- **No QA/QC Disclosure:** Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
- **Metal Equivalent Opaque:** Metal equivalent grade reported without disclosing the price, recovery, or payability assumptions used.
- **Cut-off Undisclosed:** Cut-off grade not disclosed — cannot assess comparability to prior estimates or peers.
- **Deleterious Elements Present:** Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
- **Infill Drilling:** Confirmatory drilling to raise resource confidence, not new discovery.
- **Nearology Play:** Value premise rests on proximity to a known deposit rather than own results.
- **Measured Resource:** Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
- **Indicated Resource:** Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
- **Proven Reserve:** Measured Resource with demonstrated economic viability after applying modifying factors.
- **Probable Reserve:** Indicated Resource with demonstrated economic viability after applying modifying factors.
- **Category Upgrade:** Resource confidence improved — Inferred upgraded to Indicated, or Indicated to Measured. De-risking signal.
- **Tonnage Growth:** Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.
- **Grade Improvement:** Average resource grade improved vs prior estimate — better deposit economics.
- **Contained Metal Growth:** True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.
- **QP/CP Signed:** Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
- **Cut-off Disclosed:** Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
- **JORC Compliant:** Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
- **NI 43-101 Compliant:** Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
- **Inferred Resource:** Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
- **All Inferred:** 100% of resource is Inferred category — very early stage, no engineering confidence.
- **Grade Decline:** Average grade dropped >5% vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.
- **Tonnage Decline:** Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.
- **Category Downgrade:** Resource confidence decreased — Measured downgraded to Indicated, or Indicated to Inferred. Unusual and concerning.
- **Contained Metal Decline:** Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.
- **Dilutive Growth:** Tonnage increased but contained metal flat or down — likely from lower cut-off grade, not geological expansion.
- **Cut-off Lowered:** Cut-off grade significantly reduced vs prior estimate — tonnage growth may be artificial inflation.
- **Cut-off Undisclosed:** Cut-off grade not disclosed — cannot assess comparability to prior estimates or peers.
- **Historical Estimate Only:** Estimate pre-dates or does not comply with current JORC/NI 43-101 standards — requires verification drilling.
- **Stale Estimate:** Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
- **No Contained Metal:** Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
- **No QP/CP Disclosure:** No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.
- **Maiden Resource:** First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.
- **Resource Update:** Revised estimate for an existing resource — compare to prior to assess progress.
- **PEA-Supporting:** Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
- **PFS-Supporting:** Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
- **DFS-Supporting:** Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
- **High Recovery:** Recovery at or above the exceptional band for the commodity and processing route.
- **Pilot Scale Complete:** Pilot or demonstration plant testing completed under continuous operation.
- **Free Milling:** Simple, clean ore amenable to standard processing without oxidation.
- **Multi-Domain Tested:** Variability across ore domains (oxide, transition, fresh) has been addressed.
- **Recovery Improving:** Recovery improved versus a like-for-like prior test program on the same domain and route.
- **Low Recovery:** Recovery below the weak band for the commodity and processing route.
- **Bench Scale Only:** Only preliminary bench tests completed — no locked-cycle or pilot work.
- **Refractory Ore:** Complex mineralogy requiring oxidation or other special processing before recovery.
- **Single Domain Only:** Testing limited to one composite or domain — representativeness not established.
- **Recovery Stagnant:** No improvement across multiple test programs on comparable material.
- **Theoretical Recovery Only:** Only theoretical or liberation-derived recovery reported, with no actual test result.
- **Heap Leach Route:** Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.
- **Mill Route:** Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
- **Gravity Route:** Gravity separation forms a material part of the flowsheet.
- **POX/BIOX Route:** Pressure or bio-oxidation for refractory ore — high CAPEX and OPEX.
- **Byproduct Commodity:** The tested commodity is a byproduct rather than the primary economic driver.
