# Minestarters Atlas News & Events

Canonical page: https://atlas-aws.minestarters.com/news?regions=new+zealand%2Ctasman

Atlas summarizes and classifies mining-industry stories from third-party publishers. Follow each source link for the original reporting.

Results: 47
Returned: 10
Coverage: drill results, resource updates, and metallurgy; primary commodity matching; all time unless dates are supplied.
Region: New Zealand (new zealand)
Region: tasman (tasman)
Applied filters: {"regions":["new zealand","tasman"],"document_types":["drill_results","resource_update","metallurgy"],"document_type_match":"any"}
Sort: published_at desc
Offset: 0; page size: 10


[Next page](https://atlas-aws.minestarters.com/news.md?regions=new+zealand%2Ctasman&page=2&page_size=10)

## Antimony losses sink Rua’s New Zealand project value

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/antimony-losses-sink-rua-s-new-zealand-project-value--a0038d37-184c-4b91-8467-d5bda84b4b1f) · [Markdown](https://atlas-aws.minestarters.com/news/antimony-losses-sink-rua-s-new-zealand-project-value--a0038d37-184c-4b91-8467-d5bda84b4b1f.md)
- Original announcement: 2026-11-18T16:09:03.000Z
- Atlas analysis published: 2026-11-18T17:01:20.146Z
- Atlas analysis updated: 2026-11-18T17:01:20.146Z
- Company: Rua Gold (RUA)
- Original source: [northernminer](https://www.northernminer.com/news/antimony-losses-sink-ruas-new-zealand-project-value/1003897970/)
- Atlas sentiment: -0.738
- Atlas tags: Low Recovery, Inferred Resource, Single Domain Only

Rua Gold's Auld Creek gold-antimony project in New Zealand has returned a negative after-tax NPV of C$43.6 million in a recent Pre-Feasibility Study. The reversal from a positive PEA is primarily driven by antimony recovery rates dropping to 54% from a previously assumed 85%.

## RUA Gold (NZAUF) CEO Robert Eckford Discusses Reefton Resource Expansion, Antimony Recovery and Path to Production

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/rua-gold-nzauf-ceo-robert-eckford-discusses-reefton-resource-expansion-antimony--80f165e2-688e-4862-9ab5-dd3738fc05d3) · [Markdown](https://atlas-aws.minestarters.com/news/rua-gold-nzauf-ceo-robert-eckford-discusses-reefton-resource-expansion-antimony--80f165e2-688e-4862-9ab5-dd3738fc05d3.md)
- Original announcement: 2026-11-18T13:15:00.000Z
- Atlas analysis published: 2026-11-18T13:46:10.949Z
- Atlas analysis updated: 2026-11-18T13:46:10.949Z
- Company: Rua Gold Inc. (RUA.TO)
- Original source: [orestocks](https://orestocks.com/company/RUA.TO/press-releases/5945384460461282)
- Atlas sentiment: -0.325
- Atlas tags: Refractory Ore

RUA Gold CEO Robert Eckford discussed the recently completed preliminary feasibility study for the Auld Creek project, which yielded a negative US$30.5 million NPV. The project's economics were impacted by antimony recovery rates dropping to 54% from a previously modeled 85%. The company is now focusing on metallurgical testing to improve recovery and advancing a maiden underground resource at Globe Progress.

## Rua Gold Expands Reefton Goldfield Resource Base and Completes Auld Creek PFS

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/rua-gold-expands-reefton-goldfield-resource-base-and-completes-auld-creek-pfs--b9cce806-3330-4cc0-8cdf-fd1ae3bc409f) · [Markdown](https://atlas-aws.minestarters.com/news/rua-gold-expands-reefton-goldfield-resource-base-and-completes-auld-creek-pfs--b9cce806-3330-4cc0-8cdf-fd1ae3bc409f.md)
- Original announcement: 2026-11-17T22:11:00.000Z
- Atlas analysis published: 2026-11-17T12:32:09.493Z
- Atlas analysis updated: 2026-11-17T12:32:09.493Z
- Company: Rua Gold Inc. (RUA)
- Original source: [jmn](https://www.juniorminingnetwork.com/junior-miner-news/press-releases/3326-tsx/rua/214955-rua-gold-expands-reefton-goldfield-resource-base-and-completes-auld-creek-pfs.html)
- Atlas sentiment: -0.177
- Atlas tags: Indicated Resource, Inferred Resource, Category Upgrade, Tonnage Growth, Grade Decline, Contained Metal Growth, QP/CP Signed, Cut-off Disclosed, NI 43-101 Compliant, Maiden Resource, Resource Update, Negative NPV, No Reserve Declared, PFS-Supporting, Stale Data Re-release

Rua Gold has announced updated Mineral Resource Estimates for its Reefton Goldfield projects, significantly expanding the resource base with a substantial increase in Indicated gold at Auld Creek and a maiden underground resource at Globe Progress. Concurrently, the Pre-Feasibility Study for the Auld Creek Gold-Antimony Project was completed, but it returned a negative after-tax NPV of -USD 30.5 million and no Mineral Reserve was declared, indicating that the project is not currently economically viable as a standalone operation. The company plans further metallurgical test work and an assessment to integrate the Globe Progress resource into a combined development strategy.

## A Goldfield That Produced More Than 2 Million Ounces Before 1951 Has a New Resource Count

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/a-goldfield-that-produced-more-than-2-million-ounces-before-1951-has-a-new-resou--3186a4ab-14ff-49f0-82f2-43d15bc2899a) · [Markdown](https://atlas-aws.minestarters.com/news/a-goldfield-that-produced-more-than-2-million-ounces-before-1951-has-a-new-resou--3186a4ab-14ff-49f0-82f2-43d15bc2899a.md)
- Original announcement: 2026-11-17T14:00:00.000Z
- Atlas analysis published: 2026-11-17T15:01:10.719Z
- Atlas analysis updated: 2026-11-17T15:01:10.719Z
- Company: Rua Gold Inc. (RUA)
- Original source: [orestocks](https://orestocks.com/company/NEM/press-releases/4982364994187687)
- Atlas sentiment: 0.056
- Atlas tags: Category Upgrade, NI 43-101 Compliant, QP/CP Signed

Rua Gold Inc. has announced updated Mineral Resource Estimates for its Reefton projects, including a new underground resource at Globe Progress and a significant increase in Indicated gold at Auld Creek. Additionally, the company completed a Pre-Feasibility Study for the Auld Creek Gold-Antimony Project, which currently shows a negative NPV of US$30.5 million due to lower-than-expected metallurgical recoveries.

## RUA GOLD Expands Reefton Goldfield Resource Base and Completes Auld Creek PFS

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/rua-gold-expands-reefton-goldfield-resource-base-and-completes-auld-creek-pfs--3e80ac27-e095-4e9b-8f2c-16cc939d50f6) · [Markdown](https://atlas-aws.minestarters.com/news/rua-gold-expands-reefton-goldfield-resource-base-and-completes-auld-creek-pfs--3e80ac27-e095-4e9b-8f2c-16cc939d50f6.md)
- Original announcement: 2026-11-17T12:00:00.000Z
- Atlas analysis published: 2026-11-17T12:46:05.648Z
- Atlas analysis updated: 2026-11-17T12:46:05.648Z
- Company: Rua Gold Inc. (RUA.TO)
- Original source: [orestocks](https://orestocks.com/company/RUA.TO/press-releases/6545157966427757)
- Atlas sentiment: 0.086
- Atlas tags: None

Rua Gold Inc. announced updated Mineral Resource Estimates for its Reefton Goldfield projects in New Zealand, including a maiden underground resource at Globe Progress and a substantial increase in Indicated gold at Auld Creek. The total resource base now stands at 1.27 Mt at 2.4 g/t gold for 99,000 oz Indicated and 8.82 Mt at 2.6 g/t gold for 730,000 oz Inferred. Concurrently, the Pre-Feasibility Study for the Auld Creek Gold-Antimony Project was completed, which returned a negative after-tax NPV of USD 30.5 million for the standalone operation, leading to no Mineral Reserve declaration.

## RUA GOLD Expands Reefton Goldfield Resource Base and Completes Auld Creek PFS

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/rua-gold-expands-reefton-goldfield-resource-base-and-completes-auld-creek-pfs--fc6b0abd-d915-4d61-a13e-56251490ddf9) · [Markdown](https://atlas-aws.minestarters.com/news/rua-gold-expands-reefton-goldfield-resource-base-and-completes-auld-creek-pfs--fc6b0abd-d915-4d61-a13e-56251490ddf9.md)
- Original announcement: 2026-11-17T00:00:00.000Z
- Atlas analysis published: 2026-11-17T14:02:10.171Z
- Atlas analysis updated: 2026-11-17T14:02:10.171Z
- Company: RUA GOLD (RUA)
- Original source: [prospectors_exchange](https://ruagold.com/rua-gold-expands-reefton-goldfield-resource-base-and-completes-auld-creek-pfs/)
- Atlas sentiment: -0.105
- Atlas tags: Resource Update, NI 43-101 Compliant, QP/CP Signed, Cut-off Disclosed, Category Upgrade, Tonnage Growth, Maiden Resource, Dilutive Growth, No QA/QC Disclosure, All Inferred, Historical Estimate Only, Stale Estimate, PFS-Supporting, Negative NPV, No Reserve Declared, Refractory Ore, Low Recovery

RUA GOLD announced updated Mineral Resource Estimates for its Reefton Goldfield projects in New Zealand, significantly expanding its gold resource base across five deposits, including a maiden resource for Globe Progress and a near-tripling of Indicated gold tonnage at Auld Creek. Concurrently, the Pre-Feasibility Study for the Auld Creek Gold-Antimony Project was completed, revealing a negative after-tax NPV and no declared Mineral Reserve, highlighting economic challenges primarily due to lower recoveries and grade dilution in the updated Auld Creek resource. The company plans further metallurgical test work and evaluation of Globe Progress for an integrated operating plan to improve project viability.

## SMI: Noosa Mining Conference Presentation

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/smi-noosa-mining-conference-presentation--f04af5c1-fa79-4031-b8dc-05d8f5d6a342) · [Markdown](https://atlas-aws.minestarters.com/news/smi-noosa-mining-conference-presentation--f04af5c1-fa79-4031-b8dc-05d8f5d6a342.md)
- Original announcement: 2026-11-11T00:54:00.000Z
- Atlas analysis published: 2026-11-11T01:16:31.044Z
- Atlas analysis updated: 2026-11-11T01:16:31.044Z
- Company: Santana Minerals Limited (SMI)
- Original source: [asx](https://www.asx.com.au/asx/v2/statistics/displayAnnouncement.do?display=pdf&idsId=03164559)
- Atlas sentiment: 0.462
- Atlas tags: Probable Reserve, NI 43-101 Compliant

Santana Minerals presented its Bendigo-Ophir Gold Project PFS summary, highlighting a 1.2 Moz gold reserve at 2.6 g/t. The project is in an advanced permitting stage with a draft FTA decision expected in November 2026 and a target for first gold in 2028.

## A 16% Month for Gold Miners Puts Grade, Costs and By-Products Back in Charge

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/a-16-month-for-gold-miners-puts-grade-costs-and-by-products-back-in-charge--6e9fe329-e27a-4e3e-b90c-867e4cbbe779) · [Markdown](https://atlas-aws.minestarters.com/news/a-16-month-for-gold-miners-puts-grade-costs-and-by-products-back-in-charge--6e9fe329-e27a-4e3e-b90c-867e4cbbe779.md)
- Original announcement: 2026-10-26T13:02:00.000Z
- Atlas analysis published: 2026-10-26T14:31:16.007Z
- Atlas analysis updated: 2026-10-26T14:31:16.007Z
- Company: RUA GOLD Inc. (RUA)
- Original source: [tmx](https://money.tmx.com/en/quote/ARIS/news/8446632493545604/a-16-month-for-gold-miners-puts-grade-costs-and-by-products-back-in-charge)
- Atlas sentiment: 0.116
- Atlas tags: Bonanza Intercept, True Width Disclosed

RUA GOLD's Auld Creek Gold-Antimony Project in New Zealand shows strong economic potential as current gold and antimony prices significantly exceed the base case assumptions used in its Preliminary Economic Assessment. The company recently reported high-grade drill results at the project, including an intercept of 6.6m at 24.9 g/t AuEq.

## Grades, Permits and Antimony: The Three Things Driving New Zealand's Return to the Gold Map

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/grades-permits-and-antimony-the-three-things-driving-new-zealand-s-return-to-the--28472adf-71ba-4e7e-94ed-cd800c641a89) · [Markdown](https://atlas-aws.minestarters.com/news/grades-permits-and-antimony-the-three-things-driving-new-zealand-s-return-to-the--28472adf-71ba-4e7e-94ed-cd800c641a89.md)
- Original announcement: 2026-10-23T12:36:00.000Z
- Atlas analysis published: 2026-10-23T13:16:00.757Z
- Atlas analysis updated: 2026-10-23T13:16:00.757Z
- Company: RUA GOLD Inc. (RUA)
- Original source: [orestocks](https://orestocks.com/company/OGC.TO/press-releases/5887389985834568)
- Atlas sentiment: 0.335
- Atlas tags: Bonanza Intercept, Stale Data Re-release

RUA GOLD Inc. is advancing its Auld Creek Gold-Antimony Project in New Zealand, reporting high-grade intercepts including 6.6m at 24.9 g/t AuEq. The company is targeting an updated Mineral Resource Estimate in Q4 2026 and a Pre-Feasibility Study in December 2026.

## MEX: Quarterly Activities/Appendix 5B Cash Flow Report

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/mex-quarterly-activities-appendix-5b-cash-flow-report--a4e28492-7628-489e-99ed-048586152bcc) · [Markdown](https://atlas-aws.minestarters.com/news/mex-quarterly-activities-appendix-5b-cash-flow-report--a4e28492-7628-489e-99ed-048586152bcc.md)
- Original announcement: 2026-10-16T01:34:00.000Z
- Atlas analysis published: 2026-10-16T02:16:22.102Z
- Atlas analysis updated: 2026-10-16T02:16:22.102Z
- Company: Minerals Exploration Limited (MEX)
- Original source: [asx](https://www.asx.com.au/asx/v2/statistics/displayAnnouncement.do?display=pdf&idsId=03153377)
- Atlas sentiment: 0.135
- Atlas tags: None

Minerals Exploration Limited reported new drill results from its Waitekauri Gold Project, confirming broad gold mineralisation at Jubilee South with intercepts such as 80.3m @ 0.30g/t Au. At the Invincible Gold-Tungsten Project, rock chip samples returned high-grade gold and tungsten, including up to 37.4g/t Au and 6.04% WO₃, highlighting strong exploration potential. The company ended the quarter with $1.96 million in cash, with an estimated funding runway of 1.91 quarters, indicating a need for future capital.

# Atlas tag definitions

- **Bonanza Intercept:** Exceptionally high-grade zone, well above the deposit-type norm.
- **True Width Disclosed:** Actual thickness perpendicular to structure is stated, not just downhole length.
- **Step-Out Extension:** Mineralization extended beyond the previously known limit.
- **QA/QC Disclosed:** Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
- **Compositing Transparent:** Cut-off grade and internal dilution rules are clearly stated for reported intervals.
- **Refractory Ore:** Complex mineralogy requiring oxidation or other special processing before recovery.
- **Apparent Width Only:** Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
- **Stale Data Re-release:** Historical results re-announced with no new assays or reinterpretation — low genuine novelty.
- **No QA/QC Disclosure:** Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
- **Metal Equivalent Opaque:** Metal equivalent grade reported without disclosing the price, recovery, or payability assumptions used.
- **Cut-off Undisclosed:** Cut-off grade not disclosed — cannot assess comparability to prior estimates or peers.
- **Deleterious Elements Present:** Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
- **Infill Drilling:** Confirmatory drilling to raise resource confidence, not new discovery.
- **Nearology Play:** Value premise rests on proximity to a known deposit rather than own results.
- **Measured Resource:** Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
- **Indicated Resource:** Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
- **Proven Reserve:** Measured Resource with demonstrated economic viability after applying modifying factors.
- **Probable Reserve:** Indicated Resource with demonstrated economic viability after applying modifying factors.
- **Category Upgrade:** Resource confidence improved — Inferred upgraded to Indicated, or Indicated to Measured. De-risking signal.
- **Tonnage Growth:** Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.
- **Grade Improvement:** Average resource grade improved vs prior estimate — better deposit economics.
- **Contained Metal Growth:** True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.
- **QP/CP Signed:** Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
- **Cut-off Disclosed:** Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
- **JORC Compliant:** Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
- **NI 43-101 Compliant:** Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
- **Inferred Resource:** Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
- **All Inferred:** 100% of resource is Inferred category — very early stage, no engineering confidence.
- **Grade Decline:** Average grade dropped >5% vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.
- **Tonnage Decline:** Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.
- **Category Downgrade:** Resource confidence decreased — Measured downgraded to Indicated, or Indicated to Inferred. Unusual and concerning.
- **Contained Metal Decline:** Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.
- **Dilutive Growth:** Tonnage increased but contained metal flat or down — likely from lower cut-off grade, not geological expansion.
- **Cut-off Lowered:** Cut-off grade significantly reduced vs prior estimate — tonnage growth may be artificial inflation.
- **Cut-off Undisclosed:** Cut-off grade not disclosed — cannot assess comparability to prior estimates or peers.
- **Historical Estimate Only:** Estimate pre-dates or does not comply with current JORC/NI 43-101 standards — requires verification drilling.
- **Stale Estimate:** Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
- **No Contained Metal:** Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
- **No QP/CP Disclosure:** No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.
- **Maiden Resource:** First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.
- **Resource Update:** Revised estimate for an existing resource — compare to prior to assess progress.
- **PEA-Supporting:** Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
- **PFS-Supporting:** Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
- **DFS-Supporting:** Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
- **High Recovery:** Recovery at or above the exceptional band for the commodity and processing route.
- **Pilot Scale Complete:** Pilot or demonstration plant testing completed under continuous operation.
- **Free Milling:** Simple, clean ore amenable to standard processing without oxidation.
- **Multi-Domain Tested:** Variability across ore domains (oxide, transition, fresh) has been addressed.
- **Recovery Improving:** Recovery improved versus a like-for-like prior test program on the same domain and route.
- **Low Recovery:** Recovery below the weak band for the commodity and processing route.
- **Bench Scale Only:** Only preliminary bench tests completed — no locked-cycle or pilot work.
- **Refractory Ore:** Complex mineralogy requiring oxidation or other special processing before recovery.
- **Single Domain Only:** Testing limited to one composite or domain — representativeness not established.
- **Recovery Stagnant:** No improvement across multiple test programs on comparable material.
- **Theoretical Recovery Only:** Only theoretical or liberation-derived recovery reported, with no actual test result.
- **Heap Leach Route:** Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.
- **Mill Route:** Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
- **Gravity Route:** Gravity separation forms a material part of the flowsheet.
- **POX/BIOX Route:** Pressure or bio-oxidation for refractory ore — high CAPEX and OPEX.
- **Byproduct Commodity:** The tested commodity is a byproduct rather than the primary economic driver.
