# Mining News in Namibia

Canonical page: https://atlas-aws.minestarters.com/news?regions=namibia

Atlas summarizes and classifies mining-industry stories from third-party publishers. Follow each source link for the original reporting.

Results: 107
Returned: 10
Coverage: drill results, resource updates, and metallurgy; primary commodity matching; all time unless dates are supplied.
Region: Namibia (namibia)
Applied filters: {"regions":["namibia"],"document_types":["drill_results","resource_update","metallurgy"],"document_type_match":"any"}
Sort: published_at desc
Offset: 0; page size: 10


[Next page](https://atlas-aws.minestarters.com/news.md?regions=namibia&page=2&page_size=10)

## Koryx’s bigger Haib copper plan tops $2B

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/koryx-s-bigger-haib-copper-plan-tops-2b--2737a501-1a2a-4448-91f1-c72522799be6) · [Markdown](https://atlas-aws.minestarters.com/news/koryx-s-bigger-haib-copper-plan-tops-2b--2737a501-1a2a-4448-91f1-c72522799be6.md)
- Original announcement: 2026-11-18T14:37:49.000Z
- Atlas analysis published: 2026-11-18T15:01:17.632Z
- Atlas analysis updated: 2026-11-18T15:01:17.632Z
- Company: Koryx Copper (KRY)
- Original source: [northernminer](https://www.northernminer.com/news/koryxs-bigger-haib-copper-plan-tops-2b/1003897957/)
- Atlas sentiment: 0.526
- Atlas tags: Probable Reserve, Maiden Resource

Koryx Copper has released its first prefeasibility study (PFS) for the Haib project in Namibia, reporting a probable reserve of 1.12 billion tonnes at 0.27% copper. The updated plan increases upfront CAPEX to $2.06 billion but significantly boosts annual payable copper output and project NPV.

## Koryx Copper Announces Pre-Feasibility Results for the Haib Copper Project, Southern Namibia

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/koryx-copper-announces-pre-feasibility-results-for-the-haib-copper-project-south--1df5d273-5445-4ed8-a74b-c4e3256d8c38) · [Markdown](https://atlas-aws.minestarters.com/news/koryx-copper-announces-pre-feasibility-results-for-the-haib-copper-project-south--1df5d273-5445-4ed8-a74b-c4e3256d8c38.md)
- Original announcement: 2026-11-17T22:19:10.000Z
- Atlas analysis published: 2026-11-17T12:31:27.805Z
- Atlas analysis updated: 2026-11-17T12:31:27.805Z
- Company: Koryx Copper (KRY)
- Original source: [jmn](https://www.juniorminingnetwork.com/junior-miner-news/press-releases/2067-tsx-venture/kry/214947-koryx-copper-announces-pre-feasibility-results-for-the-haib-copper-project-southern-namibia.html)
- Atlas sentiment: 0.842
- Atlas tags: PFS-Supporting, QP/CP Signed, NI 43-101 Compliant, Maiden Resource, Probable Reserve, Indicated Resource, Inferred Resource, Cut-off Disclosed, Mill Route, High Recovery, Pilot Scale Complete, Heap Leach Route, Single Domain Only

Koryx Copper announced strong Pre-Feasibility Study results for its Haib Copper Project in southern Namibia, highlighting a post-tax NPV8% of US$2.538 billion and a 24.9% post-tax IRR at base-case metal prices. The study outlines a 24-year mine life with average annual payable copper production of 130 ktpa for the first 10 years, supported by a US$2.059 billion upfront capital cost and competitive C1 cash costs of US$1.72/lb. The PFS also includes an updated Mineral Resource estimate and a maiden Probable Mineral Reserve of 1.119 billion tonnes at 0.27% Cu, containing 2.995 million tonnes of copper.

## ARN: Kameelburg Phase 3 First Hole Hits High-Grade Niobium

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/arn-kameelburg-phase-3-first-hole-hits-high-grade-niobium--eedac6b1-96ea-46c6-baa7-71cb3c6a0ee8) · [Markdown](https://atlas-aws.minestarters.com/news/arn-kameelburg-phase-3-first-hole-hits-high-grade-niobium--eedac6b1-96ea-46c6-baa7-71cb3c6a0ee8.md)
- Original announcement: 2026-11-17T22:12:00.000Z
- Atlas analysis published: 2026-11-17T23:17:07.461Z
- Atlas analysis updated: 2026-11-17T23:17:07.461Z
- Company: ALDORO RESOURCES LIMITED (ARN)
- Original source: [asx](https://www.asx.com.au/asx/v2/statistics/displayAnnouncement.do?display=pdf&idsId=03167066)
- Atlas sentiment: 0.745
- Atlas tags: Mill Route

Aldoro Resources has announced strong preliminary niobium results from the first hole of its Phase 3 drilling program at the Kameelburg project in Namibia. Hole DD003D intersected 34.0m at 1.01% Nb₂O₅ from 134.0m, including a high-grade core of 21.0m at 1.52% Nb₂O₅, with a peak of 5.13% Nb₂O₅. These pXRF results are the strongest recorded at the project to date, significantly exceeding the current resource average, and support the potential for higher-grade early development, pending laboratory confirmation.

## Haib PFS results exceed Koryx' expectations

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/haib-pfs-results-exceed-koryx-expectations--8b4661f4-ecca-46d4-8332-a197e42fa84e) · [Markdown](https://atlas-aws.minestarters.com/news/haib-pfs-results-exceed-koryx-expectations--8b4661f4-ecca-46d4-8332-a197e42fa84e.md)
- Original announcement: 2026-11-17T13:58:00.000Z
- Atlas analysis published: 2026-11-17T17:31:45.296Z
- Atlas analysis updated: 2026-11-17T17:31:45.296Z
- Company: Koryx Copper
- Original source: [miningweekly](https://www.miningweekly.com/article/haib-pfs-results-exceed-koryx-expectations-2026-11-17)
- Atlas sentiment: 0.701
- Atlas tags: PFS-Supporting

Koryx Copper has released positive Preliminary Feasibility Study (PFS) results for its Haib copper project in Namibia. The study indicates a post-tax NPV of $2.5 billion and an IRR of 25%, supported by a 4.35-million tonne contained copper resource and significant molybdenum and gold by-products.

## Koryx Copper Announces Pre-Feasibility Results for the Haib Copper Project, Southern Namibia

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/koryx-copper-announces-pre-feasibility-results-for-the-haib-copper-project-south--80554ae4-5578-4ae3-90b4-87de6df0a082) · [Markdown](https://atlas-aws.minestarters.com/news/koryx-copper-announces-pre-feasibility-results-for-the-haib-copper-project-south--80554ae4-5578-4ae3-90b4-87de6df0a082.md)
- Original announcement: 2026-11-17T12:00:00.000Z
- Atlas analysis published: 2026-11-17T12:46:23.531Z
- Atlas analysis updated: 2026-11-17T12:46:23.531Z
- Company: Koryx Copper S.A. (KRY.V)
- Original source: [orestocks](https://orestocks.com/company/KRY.V/press-releases/6160872798413104)
- Atlas sentiment: 0.842
- Atlas tags: PFS-Supporting, QP/CP Signed, Low Operating Costs, High NPV/IRR, Conventional Open Pit, NI 43-101 Compliant, Indicated Resource, Inferred Resource, Probable Reserve, Maiden Resource, Contained Metal Growth, Cut-off Disclosed, High Recovery, Recovery Improving, Multi-Domain Tested, Mill Route, Free Milling, Recovery Uncertainty, Pilot Plant Pending, Operational Complexity, Heap Leach Route

Koryx Copper announced strong Pre-Feasibility Study (PFS) results for its Haib Copper Project in Namibia, outlining a post-tax NPV8% of US$2.5 billion and an IRR of 25%. The study projects an average annual payable copper production of 130 ktpa over the first 10 years, with low C1 cash costs of US$1.72/lb, supported by an updated Mineral Resource of 4.35 Mt contained copper and maiden Probable Reserves of 3 Mt contained copper. The PFS also details a conventional open-pit mining operation and a sulphide processing route with 87.3% LOM copper recovery, with permitting targeted for completion by mid-2027.

## Koryx Copper Announces Pre-Feasibility Results for the Haib Copper Project, Southern Namibia

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/koryx-copper-announces-pre-feasibility-results-for-the-haib-copper-project-south--d797c46e-0a6b-42f1-8b2a-f1d8f0915a2a) · [Markdown](https://atlas-aws.minestarters.com/news/koryx-copper-announces-pre-feasibility-results-for-the-haib-copper-project-south--d797c46e-0a6b-42f1-8b2a-f1d8f0915a2a.md)
- Original announcement: 2026-11-17T00:00:00.000Z
- Atlas analysis published: 2026-11-17T14:02:00.783Z
- Atlas analysis updated: 2026-11-17T14:02:00.783Z
- Company: Koryx Copper (KRY)
- Original source: [prospectors_exchange](https://koryxcopper.com/koryx-copper-announces-pre-feasibility-results-for-the-haib-copper-project-southern-namibia/)
- Atlas sentiment: 0.842
- Atlas tags: PFS-Supporting, Tonnage Growth, Category Upgrade, Probable Reserve, NI 43-101 Compliant, QP/CP Signed, Cut-off Disclosed, Grade Decline, Inferred Resource, High Recovery, Pilot Scale Complete, Multi-Domain Tested, Bench Scale Only, Theoretical Recovery Only, Mill Route, Heap Leach Route

Koryx Copper announced robust Pre-Feasibility Study (PFS) results for its Haib Copper Project in Southern Namibia, highlighting a post-tax NPV of US$2.5 billion and an IRR of 25%. The PFS outlines a 24-year open-pit mine life with average annual payable copper production of 105 kt and competitive C1 cash costs of US$2.19/lb. The updated Mineral Resource includes a significant increase in Indicated tonnage and a maiden Probable Mineral Reserve, positioning Haib as a world-class copper development project.

## ARN: Innovative Seawater Leach Validated For Ore-to-MREC Route

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/arn-innovative-seawater-leach-validated-for-ore-to-mrec-route--f3c6dc08-ec22-4846-914e-8fca61f263c4) · [Markdown](https://atlas-aws.minestarters.com/news/arn-innovative-seawater-leach-validated-for-ore-to-mrec-route--f3c6dc08-ec22-4846-914e-8fca61f263c4.md)
- Original announcement: 2026-11-15T22:22:00.000Z
- Atlas analysis published: 2026-11-15T23:17:09.189Z
- Atlas analysis updated: 2026-11-15T23:17:09.189Z
- Company: ALDORO RESOURCES LIMITED (ARN)
- Original source: [asx](https://www.asx.com.au/asx/v2/statistics/displayAnnouncement.do?display=pdf&idsId=03165930)
- Atlas sentiment: 0.748
- Atlas tags: Mill Route, Single Domain Only

Aldoro Resources has validated an innovative in-house seawater leaching methodology for its Kameelburg Project in Namibia, independently confirmed by ALS Metallurgy. This process achieved comparable rare earth extraction (~72% TREE) and high strontium extraction (~92% Sr) to freshwater baselines, while significantly reducing barium impurity co-dissolution by 85%. This breakthrough de-risks the project by eliminating reliance on scarce inland freshwater, potentially reducing CAPEX and accelerating development by enabling a dual-site processing strategy near the Port of Walvis Bay.

## ARN: Investor Presentation

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/arn-investor-presentation--20385385-8bfa-4ffb-9ef2-3f18b49a32e2) · [Markdown](https://atlas-aws.minestarters.com/news/arn-investor-presentation--20385385-8bfa-4ffb-9ef2-3f18b49a32e2.md)
- Original announcement: 2026-11-12T21:22:00.000Z
- Atlas analysis published: 2026-11-12T22:15:46.784Z
- Atlas analysis updated: 2026-11-12T22:15:46.784Z
- Company: Aldoro Resources Limited (ARN)
- Original source: [asx](https://www.asx.com.au/asx/v2/statistics/displayAnnouncement.do?display=pdf&idsId=03165329)
- Atlas sentiment: 0.462
- Atlas tags: Nearology Play

Aldoro Resources presents the Kameelburg Project in Namibia as a world-class critical minerals asset featuring the world's largest strontium resource and second-largest REE resource. The company highlights a strategic partnership with Willetech to fund development and a proprietary direct-leach technology that significantly reduces CAPEX and OPEX.

## Core Energy Minerals gets rolling with uranium drilling at Barking Gecko

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/core-energy-minerals-gets-rolling-with-uranium-drilling-at-barking-gecko--dd2f0f1c-39c2-4d7b-8642-d3e2e64c24ef) · [Markdown](https://atlas-aws.minestarters.com/news/core-energy-minerals-gets-rolling-with-uranium-drilling-at-barking-gecko--dd2f0f1c-39c2-4d7b-8642-d3e2e64c24ef.md)
- Original announcement: 2026-11-12T02:06:05.000Z
- Atlas analysis published: 2026-11-12T03:16:33.500Z
- Atlas analysis updated: 2026-11-12T03:16:33.500Z
- Company: Core Energy Minerals (CR3)
- Original source: [stockhead](https://stockhead.com.au/resources/core-energy-minerals-gets-rolling-with-uranium-drilling-at-barking-gecko/)
- Atlas sentiment: 0.267
- Atlas tags: Nearology Play

Core Energy Minerals has commenced a 12-hole, 2650m diamond and RC drilling campaign at the Barking Gecko uranium prospect in Namibia. The program is designed to test a revised geological model of historical mineralisation before conducting step-out drilling to assess extensions.

## Aldoro Resources (ASX:ARN) targets Kameelburg development with WILLETECH partnership

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/aldoro-resources-asx-arn-targets-kameelburg-development-with-willetech-partnersh--1d214606-bf37-4e87-9f41-152e8f14e350) · [Markdown](https://atlas-aws.minestarters.com/news/aldoro-resources-asx-arn-targets-kameelburg-development-with-willetech-partnersh--1d214606-bf37-4e87-9f41-152e8f14e350.md)
- Original announcement: 2026-11-11T04:00:45.848Z
- Atlas analysis published: 2026-11-11T04:15:44.964Z
- Atlas analysis updated: 2026-11-11T04:15:44.964Z
- Company: Aldoro Resources (ARN)
- Original source: [miningjournal](https://www.mining-journal.com/resourcestocks/resourcestocks-articles/4539327/aldoro-resources-asx-arn-targets-kameelburg-development-willetech-partnership)
- Atlas sentiment: 0.514
- Atlas tags: Resource Update

Aldoro Resources is advancing its Kameelburg Critical Minerals Project in Namibia through a proposed strategic partnership with WILLETECH. The partnership involves a proposed RMB2 billion development investment to advance the 804.5Mt rare earths resource towards commercial production.

# Atlas tag definitions

- **Bonanza Intercept:** Exceptionally high-grade zone, well above the deposit-type norm.
- **True Width Disclosed:** Actual thickness perpendicular to structure is stated, not just downhole length.
- **Step-Out Extension:** Mineralization extended beyond the previously known limit.
- **QA/QC Disclosed:** Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
- **Compositing Transparent:** Cut-off grade and internal dilution rules are clearly stated for reported intervals.
- **Refractory Ore:** Complex mineralogy requiring oxidation or other special processing before recovery.
- **Apparent Width Only:** Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
- **Stale Data Re-release:** Historical results re-announced with no new assays or reinterpretation — low genuine novelty.
- **No QA/QC Disclosure:** Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
- **Metal Equivalent Opaque:** Metal equivalent grade reported without disclosing the price, recovery, or payability assumptions used.
- **Cut-off Undisclosed:** Cut-off grade not disclosed — cannot assess comparability to prior estimates or peers.
- **Deleterious Elements Present:** Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
- **Infill Drilling:** Confirmatory drilling to raise resource confidence, not new discovery.
- **Nearology Play:** Value premise rests on proximity to a known deposit rather than own results.
- **Measured Resource:** Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
- **Indicated Resource:** Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
- **Proven Reserve:** Measured Resource with demonstrated economic viability after applying modifying factors.
- **Probable Reserve:** Indicated Resource with demonstrated economic viability after applying modifying factors.
- **Category Upgrade:** Resource confidence improved — Inferred upgraded to Indicated, or Indicated to Measured. De-risking signal.
- **Tonnage Growth:** Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.
- **Grade Improvement:** Average resource grade improved vs prior estimate — better deposit economics.
- **Contained Metal Growth:** True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.
- **QP/CP Signed:** Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
- **Cut-off Disclosed:** Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
- **JORC Compliant:** Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
- **NI 43-101 Compliant:** Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
- **Inferred Resource:** Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
- **All Inferred:** 100% of resource is Inferred category — very early stage, no engineering confidence.
- **Grade Decline:** Average grade dropped >5% vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.
- **Tonnage Decline:** Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.
- **Category Downgrade:** Resource confidence decreased — Measured downgraded to Indicated, or Indicated to Inferred. Unusual and concerning.
- **Contained Metal Decline:** Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.
- **Dilutive Growth:** Tonnage increased but contained metal flat or down — likely from lower cut-off grade, not geological expansion.
- **Cut-off Lowered:** Cut-off grade significantly reduced vs prior estimate — tonnage growth may be artificial inflation.
- **Cut-off Undisclosed:** Cut-off grade not disclosed — cannot assess comparability to prior estimates or peers.
- **Historical Estimate Only:** Estimate pre-dates or does not comply with current JORC/NI 43-101 standards — requires verification drilling.
- **Stale Estimate:** Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
- **No Contained Metal:** Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
- **No QP/CP Disclosure:** No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.
- **Maiden Resource:** First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.
- **Resource Update:** Revised estimate for an existing resource — compare to prior to assess progress.
- **PEA-Supporting:** Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
- **PFS-Supporting:** Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
- **DFS-Supporting:** Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
- **High Recovery:** Recovery at or above the exceptional band for the commodity and processing route.
- **Pilot Scale Complete:** Pilot or demonstration plant testing completed under continuous operation.
- **Free Milling:** Simple, clean ore amenable to standard processing without oxidation.
- **Multi-Domain Tested:** Variability across ore domains (oxide, transition, fresh) has been addressed.
- **Recovery Improving:** Recovery improved versus a like-for-like prior test program on the same domain and route.
- **Low Recovery:** Recovery below the weak band for the commodity and processing route.
- **Bench Scale Only:** Only preliminary bench tests completed — no locked-cycle or pilot work.
- **Refractory Ore:** Complex mineralogy requiring oxidation or other special processing before recovery.
- **Single Domain Only:** Testing limited to one composite or domain — representativeness not established.
- **Recovery Stagnant:** No improvement across multiple test programs on comparable material.
- **Theoretical Recovery Only:** Only theoretical or liberation-derived recovery reported, with no actual test result.
- **Heap Leach Route:** Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.
- **Mill Route:** Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
- **Gravity Route:** Gravity separation forms a material part of the flowsheet.
- **POX/BIOX Route:** Pressure or bio-oxidation for refractory ore — high CAPEX and OPEX.
- **Byproduct Commodity:** The tested commodity is a byproduct rather than the primary economic driver.
