# Mining News in Brazil

Canonical page: https://atlas-aws.minestarters.com/news?regions=brazil

Atlas summarizes and classifies mining-industry stories from third-party publishers. Follow each source link for the original reporting.

Results: 445
Returned: 10
Coverage: drill results, resource updates, and metallurgy; primary commodity matching; all time unless dates are supplied.
Region: Brazil (brazil)
Applied filters: {"regions":["brazil"],"document_types":["drill_results","resource_update","metallurgy"],"document_type_match":"any"}
Sort: published_at desc
Offset: 0; page size: 10


[Next page](https://atlas-aws.minestarters.com/news.md?regions=brazil&page=2&page_size=10)

## Power puts Morro do Ferro under the microscope with high-grade rare earths hit

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/power-puts-morro-do-ferro-under-the-microscope-with-high-grade-rare-earths-hit--a9c17299-f28a-4c1d-b706-25db6a8d231b) · [Markdown](https://atlas-aws.minestarters.com/news/power-puts-morro-do-ferro-under-the-microscope-with-high-grade-rare-earths-hit--a9c17299-f28a-4c1d-b706-25db6a8d231b.md)
- Original announcement: 2026-11-24T00:38:47.000Z
- Atlas analysis published: 2026-11-24T07:44:29.197Z
- Atlas analysis updated: 2026-11-24T07:44:29.197Z
- Company: Power Minerals (PNN)
- Original source: [stockhead](https://stockhead.com.au/resources/power-puts-morro-do-ferro-under-the-microscope-with-high-grade-rare-earths-hit/)
- Atlas sentiment: 0.604
- Atlas tags: Step-Out Extension, Bonanza Intercept, Apparent Width Only, No QA/QC Disclosure, Cut-off Undisclosed, Bench Scale Only, Single Domain Only

Power Minerals (ASX:PNN) has reported high-grade rare earth results from diamond hole MFSR-059 at its Morro do Ferro project in Brazil, returning 54m at 5.08% TREO from surface including a 4m interval at 12.62% TREO. Mineralogical work by GeoLabs confirms bastnäsite accounts for 87.5% of identified rare earth mineral mass, providing a defined starting point for flowsheet development. The company is targeting a maiden mineral resource estimate by end of 2026 while advancing initial bench-top metallurgical testing.

## Cabral Gold's Resource Update Expands Oxide for Phase 1 & Hard Rock for Phase 2

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/cabral-gold-s-resource-update-expands-oxide-for-phase-1-hard-rock-for-phase-2--d91ca3e7-e2d5-4a02-b624-128912ae6880) · [Markdown](https://atlas-aws.minestarters.com/news/cabral-gold-s-resource-update-expands-oxide-for-phase-1-hard-rock-for-phase-2--d91ca3e7-e2d5-4a02-b624-128912ae6880.md)
- Original announcement: 2026-11-20T00:00:00.000Z
- Atlas analysis published: 2026-11-20T15:15:41.607Z
- Atlas analysis updated: 2026-11-20T15:15:41.607Z
- Company: Cabral Gold (CBR)
- Original source: [cruxinvestor](https://www.cruxinvestor.com/posts/cabral-golds-resource-update-expands-oxide-for-phase-1-hard-rock-for-phase-2)
- Atlas sentiment: 0.725
- Atlas tags: Indicated Resource, Contained Metal Growth, Tonnage Growth, NI 43-101 Compliant, QP/CP Signed, Cut-off Disclosed, Inferred Resource, All Inferred, Maiden Resource, Resource Update, PEA-Supporting, Heap Leach Route

Cabral Gold announced an independently prepared NI 43-101 Mineral Resource Estimate for its Cuiú Cuiú project in Pará State, Brazil, totalling 998,800 oz M&I and 2,512,900 oz Inferred gold across 6 deposits — up 49% and 376% respectively on prior estimates. Hard rock resources of 733,200 oz Indicated and 2,302,000 oz Inferred support a Phase 2 development study, while oxide resources of 265,600 oz M&I and 210,900 oz Inferred feed the Phase 1 heap leach operation that poured first gold in September 2026. Infill drilling is planned for 2027 to upgrade the large Inferred component, with a Phase 2 PFS targeted for Q4 2027.

## Cabral Gold Announces Significant Increase to Mineral Resource Estimate for the Cuiú Cuiú Gold Project, Brazil

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/cabral-gold-announces-significant-increase-to-mineral-resource-estimate-for-the--0fb9f5bf-d037-4a4c-938d-a0f69b6cb5a6) · [Markdown](https://atlas-aws.minestarters.com/news/cabral-gold-announces-significant-increase-to-mineral-resource-estimate-for-the--0fb9f5bf-d037-4a4c-938d-a0f69b6cb5a6.md)
- Original announcement: 2026-11-19T22:16:00.000Z
- Atlas analysis published: 2026-11-19T12:30:51.527Z
- Atlas analysis updated: 2026-11-19T12:30:51.527Z
- Company: Cabral Gold Inc. (CBR)
- Original source: [jmn](https://www.juniorminingnetwork.com/junior-miner-news/press-releases/2391-tsx-venture/cbr/215100-cabral-gold-announces-significant-increase-to-mineral-resource-estimate-for-the-cuiu-cuiu-gold-project-brazil.html)
- Atlas sentiment: 0.842
- Atlas tags: Tonnage Growth, Contained Metal Growth, QP/CP Signed, Cut-off Disclosed, NI 43-101 Compliant, Resource Update, Inferred Resource

Cabral Gold has announced a significantly updated Mineral Resource Estimate for its Cuiú Cuiú Gold Project in Brazil, reporting a 49% increase in Measured and Indicated resources to 42.5 Mt at 0.73 g/t gold (998,800 oz) and a 376% increase in Inferred resources to 82.1 Mt at 0.95 g/t gold (2,512,900 oz). The NI 43-101 compliant estimate highlights the project's potential as one of Brazil's largest gold projects, with resources remaining open at depth and along strike. The update includes both open-pit oxide and primary hard rock mineralization, with the oxide portion amenable to heap-leach processing.

## Cabral lifts gold resource at Brazilian mine

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/cabral-lifts-gold-resource-at-brazilian-mine--fcb1c85d-53cd-40aa-87a6-85f8cc3e8877) · [Markdown](https://atlas-aws.minestarters.com/news/cabral-lifts-gold-resource-at-brazilian-mine--fcb1c85d-53cd-40aa-87a6-85f8cc3e8877.md)
- Original announcement: 2026-11-19T16:01:38.000Z
- Atlas analysis published: 2026-11-20T15:25:02.326Z
- Atlas analysis updated: 2026-11-20T15:25:02.326Z
- Company: Cabral Gold (CBR)
- Original source: [northernminer](https://www.northernminer.com/news/cabral-lifts-gold-resource-at-brazilian-mine/1003898026/)
- Atlas sentiment: 0.628
- Atlas tags: Tonnage Growth, Contained Metal Growth, Inferred Resource, Resource Update, Cut-off Undisclosed, No QP/CP Disclosure, Heap Leach Route, PFS-Supporting

Cabral Gold has updated the mineral resource estimate at its Cuiú Cuiú project in Pará state, Brazil, lifting M&I resources 49% to 998,800 oz. gold (42.5 Mt at 0.73 g/t) and growing inferred resources 376% to 2.51 million oz. (82.1 Mt at 0.95 g/t), effective November 11, 2026. The estimate covers six deposits across two phases — a shallow oxide heap-leach operation already in production and a larger hard-rock phase planned for the future. Cabral plans infill drilling in 2027 to convert inferred material to higher-confidence categories.

## Cabral Gold Announces Significant Increase to Mineral Resource Estimate for the Cui&#xFA; Cui&#xFA; Gold Project, Brazil

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/cabral-gold-announces-significant-increase-to-mineral-resource-estimate-for-the--b0880c74-e4ba-4a47-9922-982ffbe9ace6) · [Markdown](https://atlas-aws.minestarters.com/news/cabral-gold-announces-significant-increase-to-mineral-resource-estimate-for-the--b0880c74-e4ba-4a47-9922-982ffbe9ace6.md)
- Original announcement: 2026-11-19T11:29:00.000Z
- Atlas analysis published: 2026-11-19T12:16:32.137Z
- Atlas analysis updated: 2026-11-19T12:16:32.137Z
- Company: Cabral Gold Inc. (CBR.V)
- Original source: [orestocks](https://orestocks.com/company/CBR.V/press-releases/8411736203465671)
- Atlas sentiment: 0.842
- Atlas tags: Tonnage Growth, Contained Metal Growth, QP/CP Signed, NI 43-101 Compliant, Resource Update, Measured Resource, Indicated Resource, Inferred Resource, Cut-off Disclosed

Cabral Gold announced a significant update to the Mineral Resource Estimate for its Cuiú Cuiú Gold Project in Brazil, reporting a 49% increase in Measured and Indicated Resources to 998,800 ounces and a 376% increase in Inferred Resources to 2,512,900 ounces. The updated estimate includes substantial high-grade primary material and positions Cuiú Cuiú as one of the largest gold projects in Brazil. The company plans aggressive drilling to upgrade Inferred resources and target extensions, supporting its two-phase development strategy.

## Cabral Gold's Updated Cuiú Cuiú Resource Estimate Rises 49% & 376% on Oxide & Hard Rock Gains

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/cabral-gold-s-updated-cuiu-cuiu-resource-estimate-rises-49-376-on-oxide-hard-roc--a89faf95-c12d-4f5a-848f-1776bee69c76) · [Markdown](https://atlas-aws.minestarters.com/news/cabral-gold-s-updated-cuiu-cuiu-resource-estimate-rises-49-376-on-oxide-hard-roc--a89faf95-c12d-4f5a-848f-1776bee69c76.md)
- Original announcement: 2026-11-19T00:00:00.000Z
- Atlas analysis published: 2026-11-19T16:16:08.572Z
- Atlas analysis updated: 2026-11-19T16:16:08.572Z
- Company: Cabral Gold (CBR)
- Original source: [cruxinvestor](https://www.cruxinvestor.com/posts/cabral-golds-updated-cuiu-cuiu-resource-estimate-rises-49-376-on-oxide-hard-rock-gains)
- Atlas sentiment: 0.935
- Atlas tags: NI 43-101 Compliant, QP/CP Signed, Tonnage Growth, Contained Metal Growth

Cabral Gold has released an updated mineral resource estimate for the Cuiú Cuiú project in Brazil, showing a 49% increase in Measured and Indicated gold resources and a 376% increase in Inferred resources. The update highlights significant growth in both oxide (heap leach amenable) and primary hard rock resources, supported by recent drilling.

## 7 Dates to Track Until Coringa Permits Lift Serabi Gold’s Roughly 45,000-Ounce Cap

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/7-dates-to-track-until-coringa-permits-lift-serabi-gold-s-roughly-45-000-ounce-c--f555f9e3-f458-422d-86f8-d89edd8fdc14) · [Markdown](https://atlas-aws.minestarters.com/news/7-dates-to-track-until-coringa-permits-lift-serabi-gold-s-roughly-45-000-ounce-c--f555f9e3-f458-422d-86f8-d89edd8fdc14.md)
- Original announcement: 2026-11-19T00:00:00.000Z
- Atlas analysis published: 2026-11-19T07:46:34.617Z
- Atlas analysis updated: 2026-11-19T07:46:34.617Z
- Company: Serabi Gold (SRB)
- Original source: [cruxinvestor](https://www.cruxinvestor.com/posts/7-dates-to-track-until-coringa-permits-lift-serabi-golds-roughly-45-000-ounce-cap)
- Atlas sentiment: 0.056
- Atlas tags: Inferred Resource, Resource Update

Serabi Gold's production is currently constrained by a tonnage limit at the Coringa mine under its GUIA license. Key upcoming dates include the GUIA expiry in January 2027 and the expected issuance of an operating license in the first half of 2027 to lift these restrictions.

## ALV: Invitation to ALVO Bluebush IAC HREE Project Webinar

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/alv-invitation-to-alvo-bluebush-iac-hree-project-webinar--4630d1ed-2c7d-4c53-b885-53d44a949473) · [Markdown](https://atlas-aws.minestarters.com/news/alv-invitation-to-alvo-bluebush-iac-hree-project-webinar--4630d1ed-2c7d-4c53-b885-53d44a949473.md)
- Original announcement: 2026-11-18T21:52:00.000Z
- Atlas analysis published: 2026-11-18T22:31:05.489Z
- Atlas analysis updated: 2026-11-18T22:31:05.489Z
- Company: Alvo Minerals Limited (ALV)
- Original source: [asx](https://www.asx.com.au/asx/v2/statistics/displayAnnouncement.do?display=pdf&idsId=03167636)
- Atlas sentiment: 0
- Atlas tags: None

Alvo Minerals has issued an invitation to a webinar focused on the latest results and next steps for the Bluebush Ionic Adsorption Clay (IAC) Heavy Rare Earth Element (HREE) Project in Brazil. The webinar is scheduled for Friday, 20 November 2026.

## Hard-Rock Lithium Studies Average 41% IRR, Ahead of Brine & Clay at 26%

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/hard-rock-lithium-studies-average-41-irr-ahead-of-brine-clay-at-26--377f190d-f11d-4bb2-823b-733e228f08df) · [Markdown](https://atlas-aws.minestarters.com/news/hard-rock-lithium-studies-average-41-irr-ahead-of-brine-clay-at-26--377f190d-f11d-4bb2-823b-733e228f08df.md)
- Original announcement: 2026-11-18T00:00:00.000Z
- Atlas analysis published: 2026-11-18T11:00:43.474Z
- Atlas analysis updated: 2026-11-18T11:00:43.474Z
- Company: Lithium Ionic Corp (LTH)
- Original source: [cruxinvestor](https://www.cruxinvestor.com/posts/hard-rock-lithium-studies-average-41-irr-ahead-of-brine-clay-at-26)
- Atlas sentiment: 0.491
- Atlas tags: Nearology Play, Mill Route, Gravity Route

A BMO study finds hard-rock lithium projects average a 41% IRR, significantly outperforming brine and clay projects at 26%. Lithium Ionic's Bandeira project in Brazil is highlighted as a standout, with a feasibility study estimating a 61% post-tax IRR and a 7.6x NPV/capital ratio.

## Resouro Advances Trial Mining at Novo Mundo

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/resouro-advances-trial-mining-at-novo-mundo--a95d3f7f-ae12-4a57-9f5c-c3ac1b425590) · [Markdown](https://atlas-aws.minestarters.com/news/resouro-advances-trial-mining-at-novo-mundo--a95d3f7f-ae12-4a57-9f5c-c3ac1b425590.md)
- Original announcement: 2026-11-18T00:00:00.000Z
- Atlas analysis published: 2026-11-19T00:46:34.035Z
- Atlas analysis updated: 2026-11-19T00:46:34.035Z
- Company: Resouro Strategic Metals Inc. (RSM)
- Original source: [globenewswire](https://www.globenewswire.com/news-release/2026/11/18/3406213/0/en/resouro-advances-trial-mining-at-novo-mundo.html)
- Atlas sentiment: 0.236
- Atlas tags: Nearology Play

Resouro has mobilized mining equipment to the Novo Mundo gold project in Brazil to begin trial mining preparations at the Luizão deposit. The company is also advancing regulatory milestones, including the submission of an Economic Development Plan and Final Exploration Reports for its mineral titles.

# Atlas tag definitions

- **Bonanza Intercept:** Exceptionally high-grade zone, well above the deposit-type norm.
- **True Width Disclosed:** Actual thickness perpendicular to structure is stated, not just downhole length.
- **Step-Out Extension:** Mineralization extended beyond the previously known limit.
- **QA/QC Disclosed:** Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
- **Compositing Transparent:** Cut-off grade and internal dilution rules are clearly stated for reported intervals.
- **Refractory Ore:** Complex mineralogy requiring oxidation or other special processing before recovery.
- **Apparent Width Only:** Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
- **Stale Data Re-release:** Historical results re-announced with no new assays or reinterpretation — low genuine novelty.
- **No QA/QC Disclosure:** Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
- **Metal Equivalent Opaque:** Metal equivalent grade reported without disclosing the price, recovery, or payability assumptions used.
- **Cut-off Undisclosed:** Cut-off grade not disclosed — cannot assess comparability to prior estimates or peers.
- **Deleterious Elements Present:** Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
- **Infill Drilling:** Confirmatory drilling to raise resource confidence, not new discovery.
- **Nearology Play:** Value premise rests on proximity to a known deposit rather than own results.
- **Measured Resource:** Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
- **Indicated Resource:** Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
- **Proven Reserve:** Measured Resource with demonstrated economic viability after applying modifying factors.
- **Probable Reserve:** Indicated Resource with demonstrated economic viability after applying modifying factors.
- **Category Upgrade:** Resource confidence improved — Inferred upgraded to Indicated, or Indicated to Measured. De-risking signal.
- **Tonnage Growth:** Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.
- **Grade Improvement:** Average resource grade improved vs prior estimate — better deposit economics.
- **Contained Metal Growth:** True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.
- **QP/CP Signed:** Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
- **Cut-off Disclosed:** Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
- **JORC Compliant:** Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
- **NI 43-101 Compliant:** Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
- **Inferred Resource:** Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
- **All Inferred:** 100% of resource is Inferred category — very early stage, no engineering confidence.
- **Grade Decline:** Average grade dropped >5% vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.
- **Tonnage Decline:** Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.
- **Category Downgrade:** Resource confidence decreased — Measured downgraded to Indicated, or Indicated to Inferred. Unusual and concerning.
- **Contained Metal Decline:** Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.
- **Dilutive Growth:** Tonnage increased but contained metal flat or down — likely from lower cut-off grade, not geological expansion.
- **Cut-off Lowered:** Cut-off grade significantly reduced vs prior estimate — tonnage growth may be artificial inflation.
- **Cut-off Undisclosed:** Cut-off grade not disclosed — cannot assess comparability to prior estimates or peers.
- **Historical Estimate Only:** Estimate pre-dates or does not comply with current JORC/NI 43-101 standards — requires verification drilling.
- **Stale Estimate:** Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
- **No Contained Metal:** Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
- **No QP/CP Disclosure:** No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.
- **Maiden Resource:** First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.
- **Resource Update:** Revised estimate for an existing resource — compare to prior to assess progress.
- **PEA-Supporting:** Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
- **PFS-Supporting:** Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
- **DFS-Supporting:** Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
- **High Recovery:** Recovery at or above the exceptional band for the commodity and processing route.
- **Pilot Scale Complete:** Pilot or demonstration plant testing completed under continuous operation.
- **Free Milling:** Simple, clean ore amenable to standard processing without oxidation.
- **Multi-Domain Tested:** Variability across ore domains (oxide, transition, fresh) has been addressed.
- **Recovery Improving:** Recovery improved versus a like-for-like prior test program on the same domain and route.
- **Low Recovery:** Recovery below the weak band for the commodity and processing route.
- **Bench Scale Only:** Only preliminary bench tests completed — no locked-cycle or pilot work.
- **Refractory Ore:** Complex mineralogy requiring oxidation or other special processing before recovery.
- **Single Domain Only:** Testing limited to one composite or domain — representativeness not established.
- **Recovery Stagnant:** No improvement across multiple test programs on comparable material.
- **Theoretical Recovery Only:** Only theoretical or liberation-derived recovery reported, with no actual test result.
- **Heap Leach Route:** Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.
- **Mill Route:** Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
- **Gravity Route:** Gravity separation forms a material part of the flowsheet.
- **POX/BIOX Route:** Pressure or bio-oxidation for refractory ore — high CAPEX and OPEX.
- **Byproduct Commodity:** The tested commodity is a byproduct rather than the primary economic driver.
