# Boron Mining News

Canonical page: https://atlas-aws.minestarters.com/news?commodities=boron

Atlas summarizes and classifies mining-industry stories from third-party publishers. Follow each source link for the original reporting.

Results: 13
Returned: 10
Coverage: drill results, resource updates, and metallurgy; primary commodity matching; all time unless dates are supplied.
Commodity: Boron (boron)
Applied filters: {"commodities":["boron"],"commodity_scope":"primary","document_types":["drill_results","resource_update","metallurgy"],"document_type_match":"any"}
Sort: published_at desc
Offset: 0; page size: 10


[Next page](https://atlas-aws.minestarters.com/news.md?commodities=boron&page=2&page_size=10)

## Boron One Reports Metallurgical Study Results and Identifies Preferred Concentration Process for Third-Party Borate Materials

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/boron-one-reports-metallurgical-study-results-and-identifies-preferred-concentra--5ea04964-05bf-4758-ab84-f5a0bb416279) · [Markdown](https://atlas-aws.minestarters.com/news/boron-one-reports-metallurgical-study-results-and-identifies-preferred-concentra--5ea04964-05bf-4758-ab84-f5a0bb416279.md)
- Original announcement: 2026-11-19T13:31:23.730Z
- Atlas analysis published: 2026-11-19T13:46:13.148Z
- Atlas analysis updated: 2026-11-19T13:46:13.148Z
- Company: Boron One Holdings Inc. (BONE)
- Original source: [accesswire](https://www.accessnewswire.com/newsroom/en/metals-and-mining/boron-one-reports-metallurgical-study-results-and-identifies-preferred-concentrat-1253493)
- Atlas sentiment: 0.456
- Atlas tags: Mill Route, Multi-Domain Tested

Boron One has reported metallurgical study results for third-party borate materials, identifying calcination followed by classification as the preferred concentration method. The study showed that feed materials ranging from 19.75% to 42.06% B2O3 can be upgraded to commercial-grade concentrates of 44.81% to 55.25% B2O3.

## Boron One Reports Metallurgical Study Results and Identifies Preferred Concentration Process for Third-Party Borate Materials

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/boron-one-reports-metallurgical-study-results-and-identifies-preferred-concentra--16089681-0faf-44de-b324-36ecc9a7e2f0) · [Markdown](https://atlas-aws.minestarters.com/news/boron-one-reports-metallurgical-study-results-and-identifies-preferred-concentra--16089681-0faf-44de-b324-36ecc9a7e2f0.md)
- Original announcement: 2026-11-19T12:00:00.000Z
- Atlas analysis published: 2026-11-19T14:30:51.906Z
- Atlas analysis updated: 2026-11-19T14:30:51.906Z
- Company: Boron One Holdings Inc. (BONE)
- Original source: [jmn](https://www.juniorminingnetwork.com/junior-miner-news/press-releases/1256-tsx-venture/bone/215146-boron-one-reports-metallurgical-study-results-and-identifies-preferred-concentration-process-for-third-party-borate-materials.html)
- Atlas sentiment: 0.358
- Atlas tags: Mill Route, Pilot Scale Complete, Multi-Domain Tested

Boron One has completed a metallurgical study on third-party borate materials, identifying calcination followed by classification as the preferred concentration method. The study demonstrated that commercial-grade concentrates (44.81% to 55.25% B2O3) can be produced from feed grades ranging from approximately 19.75% to 42.06% B2O3.

## Boron One Announces Positive Study for Mineral Processing Facility

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/boron-one-announces-positive-study-for-mineral-processing-facility--0d01598e-e2ee-4f78-b6ba-aac2e04be0cb) · [Markdown](https://atlas-aws.minestarters.com/news/boron-one-announces-positive-study-for-mineral-processing-facility--0d01598e-e2ee-4f78-b6ba-aac2e04be0cb.md)
- Original announcement: 2026-11-16T13:46:36.039Z
- Atlas analysis published: 2026-11-16T14:00:59.288Z
- Atlas analysis updated: 2026-11-16T14:00:59.288Z
- Company: Boron One Holdings Inc. (BONE)
- Original source: [accesswire](https://www.accessnewswire.com/newsroom/en/metals-and-mining/boron-one-announces-positive-study-for-mineral-processing-facility-1251244)
- Atlas sentiment: 0.467
- Atlas tags: Mill Route, QP/CP Signed, Gravity Route, Multi-Domain Tested

Boron One has completed a mineral processing study for its Piskanja Borate Project, supporting a conceptual facility processing 250,000 tonnes per year. The study demonstrates that a high-grade (40% B2O3) colemanite concentrate can be produced with approximately 86% recovery using gravity-based separation.

## Boron One Announces Positive Study for Mineral Processing Facility

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/boron-one-announces-positive-study-for-mineral-processing-facility--9e943296-24b2-4ff6-b72e-f7e47bafc750) · [Markdown](https://atlas-aws.minestarters.com/news/boron-one-announces-positive-study-for-mineral-processing-facility--9e943296-24b2-4ff6-b72e-f7e47bafc750.md)
- Original announcement: 2026-11-16T04:06:16.000Z
- Atlas analysis published: 2026-11-16T14:32:15.404Z
- Atlas analysis updated: 2026-11-16T14:32:15.404Z
- Company: Boron One Holdings Inc. (BONE)
- Original source: [jmn](https://www.juniorminingnetwork.com/junior-miner-news/press-releases/1256-tsx-venture/bone/214863-boron-one-announces-positive-study-for-mineral-processing-facility.html)
- Atlas sentiment: 0.649
- Atlas tags: High Recovery, Free Milling, Mill Route, Gravity Route, Single Domain Only

Boron One has completed a mineral processing study for its Piskanja Borate Project in Serbia, confirming the feasibility of a gravity-based flowsheet. The study indicates an 86% B2O3 recovery and a concentrate grade of approximately 40% B2O3 using conventional mechanical treatment.

## Boron One boosts Serbia project economics in updated study

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/boron-one-boosts-serbia-project-economics-in-updated-study--eed27513-e73b-4cc5-9f9b-d62bb1293bc0) · [Markdown](https://atlas-aws.minestarters.com/news/boron-one-boosts-serbia-project-economics-in-updated-study--eed27513-e73b-4cc5-9f9b-d62bb1293bc0.md)
- Original announcement: 2026-10-14T21:10:00.000Z
- Atlas analysis published: 2026-10-14T21:31:38.262Z
- Atlas analysis updated: 2026-10-14T21:31:38.262Z
- Company: Boron One Holdings (BONE)
- Original source: [miningcom](https://www.mining.com/boron-one-boosts-serbia-project-economics-in-updated-study/)
- Atlas sentiment: 0.325
- Atlas tags: Resource Update, PEA-Supporting

Boron One Holdings has released an updated Preliminary Economic Assessment (PEA) for its Piskanja boron project in Serbia, forecasting an improved after-tax IRR of 89% and an NPV of $558.8 million. While the project's mine life has decreased from 16 to 13 years, the updated study shows higher projected annual revenues and a rapid payback period of less than one year.

## Boron One Announces Positive Preliminary Economic Assessment (PEA) for Its Piskanja Boron Project

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/boron-one-announces-positive-preliminary-economic-assessment-pea-for-its-piskanj--a14be6d3-3a0b-4669-a114-d2a87c65537d) · [Markdown](https://atlas-aws.minestarters.com/news/boron-one-announces-positive-preliminary-economic-assessment-pea-for-its-piskanj--a14be6d3-3a0b-4669-a114-d2a87c65537d.md)
- Original announcement: 2026-10-14T18:41:05.000Z
- Atlas analysis published: 2026-10-14T14:31:56.807Z
- Atlas analysis updated: 2026-10-14T14:31:56.807Z
- Company: Boron One Holdings Inc. (BONE)
- Original source: [jmn](https://www.juniorminingnetwork.com/junior-miner-news/press-releases/1256-tsx-venture/bone/212878-boron-one-holdings-inc-announces-positive-preliminary-economic-assessment-pea-for-its-piskanja-boron-project.html)
- Atlas sentiment: 0.738
- Atlas tags: PEA-Supporting, NI 43-101 Compliant, QP/CP Signed, Measured Resource, Indicated Resource, Resource Update, Cut-off Disclosed

Boron One announced positive results from an updated Preliminary Economic Assessment (PEA) for its wholly-owned Piskanja Boron Project in Serbia. The PEA outlines a robust economic case with a post-tax NPV8 of $638.8 million and an IRR of 89.0%, with a payback period of less than 12 months. The study is based on an updated NI 43-101 compliant Mineral Resource Estimate, which includes 7.14 Mt of Measured and Indicated resources at an average grade of 32.4% B₂O₃.

## Boron One raises Serbia project economics in updated study

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/boron-one-raises-serbia-project-economics-in-updated-study--499698ab-5402-47c9-ab98-59276c874733) · [Markdown](https://atlas-aws.minestarters.com/news/boron-one-raises-serbia-project-economics-in-updated-study--499698ab-5402-47c9-ab98-59276c874733.md)
- Original announcement: 2026-10-14T15:52:39.000Z
- Atlas analysis published: 2026-10-14T17:01:11.556Z
- Atlas analysis updated: 2026-10-14T17:01:11.556Z
- Company: Boron One Holdings (BONE)
- Original source: [northernminer](https://www.northernminer.com/news/boron-one-boosts-serbia-project-economics-in-updated-study/1003895724/)
- Atlas sentiment: 0.325
- Atlas tags: Resource Update

Boron One Holdings has released an updated Preliminary Economic Assessment (PEA) for its Piskanja boron project in Serbia, forecasting an improved after-tax IRR of 89%. While the NPV has risen to $558.8 million, the projected mine life has decreased from 16 to 13 years.

## Boron One Holdings Inc. Announces Positive Preliminary Economic Assessment (PEA) for Its Piskanja Boron Project

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/boron-one-holdings-inc-announces-positive-preliminary-economic-assessment-pea-fo--7448f280-2b64-40b9-8bb8-859c50018ebb) · [Markdown](https://atlas-aws.minestarters.com/news/boron-one-holdings-inc-announces-positive-preliminary-economic-assessment-pea-fo--7448f280-2b64-40b9-8bb8-859c50018ebb.md)
- Original announcement: 2026-10-14T12:30:00.000Z
- Atlas analysis published: 2026-10-14T13:01:19.615Z
- Atlas analysis updated: 2026-10-14T13:01:19.615Z
- Company: Boron One Holdings Inc. (BONE.V)
- Original source: [orestocks](https://orestocks.com/company/BONE.V/press-releases/7350085584829515)
- Atlas sentiment: 0.842
- Atlas tags: High NPV, High IRR, Rapid Payback, PEA-Supporting, Measured Resource, Indicated Resource, QP/CP Signed, NI 43-101 Compliant, Cut-off Disclosed, Resource Update

Boron One Holdings Inc. announced positive results from an updated Preliminary Economic Assessment (PEA) for its wholly-owned Piskanja boron project in Serbia. The PEA highlights robust economics, including a post-tax NPV8 of US$638.8 million, an IRR of 89.0%, and a rapid 12-month capital payback period. This assessment is underpinned by an updated Mineral Resource Estimate, which outlines 7.14 Mt of Measured and Indicated resources at an average grade of 32.4% B2O3.

## Boron One Holdings Inc. - Jarandol Basin Exploration Program Update

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/boron-one-holdings-inc-jarandol-basin-exploration-program-update--521a4a99-8036-4ef1-a221-c6a12cf8f13e) · [Markdown](https://atlas-aws.minestarters.com/news/boron-one-holdings-inc-jarandol-basin-exploration-program-update--521a4a99-8036-4ef1-a221-c6a12cf8f13e.md)
- Original announcement: 2026-09-08T12:30:00.000Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: Boron One Holdings Inc. (BONE.V)
- Original source: [orestocks](https://orestocks.com/company/BONE.V/press-releases/6036201497292313)
- Atlas sentiment: 0.108
- Atlas tags: Stale Data Re-release, Nearology Play

Boron One Holdings Inc. has commenced its seasonal field exploration program in the Jarandol Basin, Serbia. The program includes geological mapping, soil sampling, trenching, and approximately 1,400 m of drilling to test high-value targets.

## Boron One Holdings Inc. Advances with Potential Partner

- Atlas analysis: [Read analysis](https://atlas-aws.minestarters.com/news/boron-one-holdings-inc-advances-with-potential-partner--05d09387-23da-47b7-a3f0-b137fd475cb0) · [Markdown](https://atlas-aws.minestarters.com/news/boron-one-holdings-inc-advances-with-potential-partner--05d09387-23da-47b7-a3f0-b137fd475cb0.md)
- Original announcement: 2026-03-31T21:20:00.000Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: Boron One Holdings Inc. (BONE)
- Original source: [tmx](https://money.tmx.com/en/quote/BONE/news/4932999053711075/boron-one-holdings-inc-advances-with-potential-partner)
- Atlas sentiment: 0.236
- Atlas tags: Resource Update, QP/CP Signed

Boron One Holdings Inc. is progressing through diligence with a potential strategic partner for its boron assets and is launching a non-brokered private placement of up to $800,000. The company also restated its Piskanja Boron Project mineral resource estimates from its 2022 PEA.

# Atlas tag definitions

- **Bonanza Intercept:** Exceptionally high-grade zone, well above the deposit-type norm.
- **True Width Disclosed:** Actual thickness perpendicular to structure is stated, not just downhole length.
- **Step-Out Extension:** Mineralization extended beyond the previously known limit.
- **QA/QC Disclosed:** Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
- **Compositing Transparent:** Cut-off grade and internal dilution rules are clearly stated for reported intervals.
- **Refractory Ore:** Complex mineralogy requiring oxidation or other special processing before recovery.
- **Apparent Width Only:** Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
- **Stale Data Re-release:** Historical results re-announced with no new assays or reinterpretation — low genuine novelty.
- **No QA/QC Disclosure:** Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
- **Metal Equivalent Opaque:** Metal equivalent grade reported without disclosing the price, recovery, or payability assumptions used.
- **Cut-off Undisclosed:** Cut-off grade not disclosed — cannot assess comparability to prior estimates or peers.
- **Deleterious Elements Present:** Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
- **Infill Drilling:** Confirmatory drilling to raise resource confidence, not new discovery.
- **Nearology Play:** Value premise rests on proximity to a known deposit rather than own results.
- **Measured Resource:** Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
- **Indicated Resource:** Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
- **Proven Reserve:** Measured Resource with demonstrated economic viability after applying modifying factors.
- **Probable Reserve:** Indicated Resource with demonstrated economic viability after applying modifying factors.
- **Category Upgrade:** Resource confidence improved — Inferred upgraded to Indicated, or Indicated to Measured. De-risking signal.
- **Tonnage Growth:** Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.
- **Grade Improvement:** Average resource grade improved vs prior estimate — better deposit economics.
- **Contained Metal Growth:** True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.
- **QP/CP Signed:** Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
- **Cut-off Disclosed:** Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
- **JORC Compliant:** Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
- **NI 43-101 Compliant:** Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
- **Inferred Resource:** Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
- **All Inferred:** 100% of resource is Inferred category — very early stage, no engineering confidence.
- **Grade Decline:** Average grade dropped >5% vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.
- **Tonnage Decline:** Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.
- **Category Downgrade:** Resource confidence decreased — Measured downgraded to Indicated, or Indicated to Inferred. Unusual and concerning.
- **Contained Metal Decline:** Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.
- **Dilutive Growth:** Tonnage increased but contained metal flat or down — likely from lower cut-off grade, not geological expansion.
- **Cut-off Lowered:** Cut-off grade significantly reduced vs prior estimate — tonnage growth may be artificial inflation.
- **Cut-off Undisclosed:** Cut-off grade not disclosed — cannot assess comparability to prior estimates or peers.
- **Historical Estimate Only:** Estimate pre-dates or does not comply with current JORC/NI 43-101 standards — requires verification drilling.
- **Stale Estimate:** Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
- **No Contained Metal:** Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
- **No QP/CP Disclosure:** No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.
- **Maiden Resource:** First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.
- **Resource Update:** Revised estimate for an existing resource — compare to prior to assess progress.
- **PEA-Supporting:** Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
- **PFS-Supporting:** Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
- **DFS-Supporting:** Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
- **High Recovery:** Recovery at or above the exceptional band for the commodity and processing route.
- **Pilot Scale Complete:** Pilot or demonstration plant testing completed under continuous operation.
- **Free Milling:** Simple, clean ore amenable to standard processing without oxidation.
- **Multi-Domain Tested:** Variability across ore domains (oxide, transition, fresh) has been addressed.
- **Recovery Improving:** Recovery improved versus a like-for-like prior test program on the same domain and route.
- **Low Recovery:** Recovery below the weak band for the commodity and processing route.
- **Bench Scale Only:** Only preliminary bench tests completed — no locked-cycle or pilot work.
- **Refractory Ore:** Complex mineralogy requiring oxidation or other special processing before recovery.
- **Single Domain Only:** Testing limited to one composite or domain — representativeness not established.
- **Recovery Stagnant:** No improvement across multiple test programs on comparable material.
- **Theoretical Recovery Only:** Only theoretical or liberation-derived recovery reported, with no actual test result.
- **Heap Leach Route:** Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.
- **Mill Route:** Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
- **Gravity Route:** Gravity separation forms a material part of the flowsheet.
- **POX/BIOX Route:** Pressure or bio-oxidation for refractory ore — high CAPEX and OPEX.
- **Byproduct Commodity:** The tested commodity is a byproduct rather than the primary economic driver.
